TM
StingerStinger
KAYAK LOADING SYSTEM
T-knobs
Extension Frame Mounting Plate V-Block 70mm Bolts
Please Note:
The MPG350 Stinger Kayak Loading System is designed to work with the MPG107M
SeaWing Kayak Carrier. If you have not done so, you will need to purchase
the SeaWing Carrier in order to complete installation.
For installation with the MPG107 SeaWing (installation mounting bolts are standard
thread and are inserted from the bottom), please follow alternative instructions
(in panels - marked MPG107 SeaWing) under steps 7,8,9 and 10.
1” Bolts1 3/4” Bolts
Installation & Loading Instructions - Please Read Before Beginning
1
. Insert the two 1” bolts into the two holes
located on the bottom side of the Extension
Frame. Tighten with a Phillips screwdriver.
See image 2.
Step 1: Stinger Pre-Assembly
. Place the V-Block into the channel located directly
behind the Malone logo on the Extension Frame.
See image 1.
2
3
Installation & Loading Instructions - MPG350 Stinger
TM
Align
channels
to holes
. Insert the 1 3/4” Carriage Bolts down and
through the Extension Frame channels and
into the holes in the Mounting Plate.
See image 4.
5
. Place the Extension Frame on top of the Mounting
Plate with the raised block side facing up. The two
holes located on the end of the Plate should align
with the two channels in the Frame.
See image 3.
4
Step 2: Installing Carriers to Cross Bars
. Place the rear SeaWing (purchased separately)
onto the Stinger so that the mounting holes in
both units are aligned. See image 6.
. Loosely thread the two T-knobs onto the Bolts.
Slide the Frame forward towards the Mounting
Plate until travel is stopped. Tighten both of
the T-knobs. See image 5.
6
Installation & Loading Instructions - MPG350 Stinger
TM
7
. Insert 70mm Bolt through one hole of Jawz
adapter and loosely apply T-knob. See image 8.
Note: Additional bolt lengths available.
FOR MPG107 SeaWing: Insert bolt through Jawz
adapter and up through Mounting Plate and
thread into bottom mounting hole of SeaWing.
. Insert a single 70mm Mounting Bolt down through
the SeaWing and Mounting Plate. See image 7.
FOR MPG107 SeaWing: Do not attempt to use 70mm
mounting bolts. Call 1-800-295-0042 for standard
thread bolts (provided free of charge).
8
9
. Loosely secure the second Bolt with a T-knob.
Position the assembly to the final desired
mounting location. Finish by firmly tightening
both of the T-knobs. See image 10.
FOR MPG107 SeaWing: Loosely secure the bolts.
Position the assembly to the final mounting
location. Firmly tighten bolts with wrench.
. Place the Stinger with SeaWing assembly onto the
rear cross bar of the vehicle with the V-Block to
the rear of the vehicle. Swing the Jawz under the
bar and insert the second 70mm Bolt. See image 9.
FOR MPG107 SeaWing: Install assembly on bar; insert
second bolt through Jawz and up through Mounting
Plate; thread into bottom hole of SeaWing.
10