
TM
STAX PRO2STAX PRO2
VERTICAL FOLD-DOWN CARRIER
FOR TWO KAYAKS
50mm
40mm
Stax Pro2 Kayak Carrier
12’ Load Straps
Jawz Adapters Mounting Bolts
Installation & Loading Instructions - Please Read Before Beginning
1
Cogs
. Insert a 100mm bolt into the square
hole located in the top of the base.
See image 2.
Foam Blocks
Step 1: Assembling the Stax Pro2
9’ Safety Strap
TM
12’ Tie-Downs
. Insert the bottom of the post into the
top of the base. Position so the cogs
on the post are in contact with the
cogs on the base. See image 1.
2
3
. With the holes in the base and post aligned,
push the bolt through the two assemblies
until the end of the bolt is exposed.
Note: Confirm that the head of the bolt is
fully seated into the base. See image 3.

Installation & Loading Instructions - MPG115MD Stax Pro2
4
. Install a black round tightening knob onto
the exposed end of the bolt. See image 4.
Step 2: Installing Carriers to the Cross Bars
. Loosen the tightening knob and place
the carrier into the fold-down position.
Insert a mounting bolt into the forward
side hex hole. See image 5.
TM
5
6
. Raise the carrier into the upright
position. Place the carrier onto the
front cross bar with the oval side of
the carrier facing the front of the
vehicle. Swing the Jawz under the
cross bar as shown. See image 7.
. Insert a mounting bolt through one hole of
a Jawz mounting adapter and loosely apply
a t-knob. See image 6.
7

Installation & Loading Instructions - MPG115MD Stax Pro2
TM
8
. Apply a t-knob to the bolt and slightly
tighten until the carrier is secure on
the cross bar. Repeat for the second
carrier and rear cross bar. See image 9.
10
. Insert a mounting bolt into the rear side
hex hole and down through the Jawz
mounting adapter. See image 8.
. Raise the carriers to the up-position and
confirm alignment. Tighten the t-knobs
until both carriers are securely fixed to the
cross bars. Place foam blocks onto the cross
bars and next to the carriers. See image 10.
Note: When transporting one kayak; the
carriers should be positioned so that the
distance from the carriers to the cross bar
towers is exactly the width of the kayak.
9
Step 3: Loading the Kayaks
. Route the free end of a 12’ load strap
through one strap slot in the top of the
carrier. Pull the free end back until
there is an even loop. Repeat for the
second carrier. See image 11.
11