Malone MPG115MD User Manual

MALONE
R
TM
STAX PRO2STAX PRO2
VERTICAL FOLD-DOWN CARRIER FOR TWO KAYAKS
50mm
40mm
Stax Pro2 Kayak Carrier
Jawz Adapters Mounting Bolts
Installation & Loading Instructions - Please Read Before Beginning
1
Cogs
. Insert a 100mm bolt into the square hole located in the top of the base. See image 2.
Foam Blocks
Step 1: Assembling the Stax Pro2
9’ Safety Strap
TM
12’ Tie-Downs
. Insert the bottom of the post into the top of the base. Position so the cogs on the post are in contact with the cogs on the base. See image 1.
2
3
. With the holes in the base and post aligned, push the bolt through the two assemblies until the end of the bolt is exposed. Note: Confirm that the head of the bolt is fully seated into the base. See image 3.
Installation & Loading Instructions - MPG115MD Stax Pro2
MALONE
R
4
. Install a black round tightening knob onto the exposed end of the bolt. See image 4.
Step 2: Installing Carriers to the Cross Bars
. Loosen the tightening knob and place the carrier into the fold-down position. Insert a mounting bolt into the forward side hex hole. See image 5.
TM
5
6
. Raise the carrier into the upright position. Place the carrier onto the front cross bar with the oval side of the carrier facing the front of the vehicle. Swing the Jawz under the cross bar as shown. See image 7.
. Insert a mounting bolt through one hole of a Jawz mounting adapter and loosely apply a t-knob. See image 6.
7
MALONE
R
Installation & Loading Instructions - MPG115MD Stax Pro2
TM
8
. Apply a t-knob to the bolt and slightly tighten until the carrier is secure on the cross bar. Repeat for the second carrier and rear cross bar. See image 9.
10
. Insert a mounting bolt into the rear side hex hole and down through the Jawz mounting adapter. See image 8.
. Raise the carriers to the up-position and confirm alignment. Tighten the t-knobs until both carriers are securely fixed to the cross bars. Place foam blocks onto the cross bars and next to the carriers. See image 10.
Note: When transporting one kayak; the carriers should be positioned so that the distance from the carriers to the cross bar towers is exactly the width of the kayak.
9
Step 3: Loading the Kayaks
. Route the free end of a 12’ load strap through one strap slot in the top of the carrier. Pull the free end back until there is an even loop. Repeat for the second carrier. See image 11.
11
Loading...
+ 4 hidden pages