Maipu SM6600-08-MF, SM6600-04-MF Installation Manual

MyPower
MyPower
MyPower
MyPower
S6600
S6600
S6600
S6600
Series
Series
Series
Series
Routing
Routing
Routing
Routing Switch
Switch
Switch
Switch
Installation
Installation
Installation
Installation
Manual
Manual
Manual
Manual
1
.0
Maipu Communication Technology Co., Ltd
No. 16, Jiuxing Avenue
Hi-tech Park
Chengdu, Sichuan Province
People ’ s Republic of China - 610041
Tel:
Tel:
Tel:
Tel: (86) 28-85148850, 85148041
Fax:
Fax:
Fax:
Fax: (86) 28-85148948, 85148139
URL:
URL:
URL:
URL: http: // www.maipu.com
overseas@maipu.com
overseas@maipu.com
Email: overseas@maipu.com
overseas@maipu.com
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
Copyright
Copyright
Copyright
Copyright
Copyright © 20 15 , Maipu Communication Technology Co., Ltd. All Rights Reserved.
No part of this manual may be reproduced or transmitted in any form or by any
means without prior written consent of Maipu Communication Technology Co., Ltd.
and are trademarks of Maipu Communication Technology Co., Ltd.
All other trademarks that may be mentioned in this manual are the property of
their respective owners.
The information in this document is subject to change without notice. In no event
shall Maipu be liable for any direct, indirect, incidental, special, exemplary, or
consequential damages (including, but not limited to, procurement of substitute
goods or services; loss of use, data, or profits; or business interruption) however
caused and on any theory of liability, whether in contract, strict liability, or tort
(including negligence or otherwise) arising in any way out of the use of this manual
or the related content on the website, even if advised of the possibility of such
damage.
Security
Security
Security
Security Statement
Statement
Statement
Statement
Important! Before powering on and starting the product, please read the security
and compatibility information of the product.
Environmental
Environmental
Environmental
Environmental protection
protection
protection
protection
This product has been designed to comply with the environmental protection
requirements. The storage, use, and disposal of this product must meet the
applicable national laws and regulations.
ii
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual

Preface

Preface
Preface
Preface
Installation Preparations
Manual
Manual
Manual
Manual Introduction
Product
Product
Product
Product Versions
Audience
Audience
Audience
Audience
Introduction
Introduction
Introduction
This manual first describes the appearance, hardware, cards, and power modules
of MyPower S6600 series high-end routing switch; secondly, describes the
installation preparations and installation methods of the device; at last, describes
the basic using methods and daily maintenance of the device from the aspects of
powering on and running the device, troubleshooting and device maintenance.
Versions
Versions
Versions
The corresponding product versions of the manual are as follows:
Product
Product
Product
Product Name
MyPower S6600 series high-end routing switch
Name
Name
Name Product
Product
Product
Product Version
SM6600-04-MF (V2)
SM6600-08-MF (V2)
Version
Version
Version
This documentation is intended for:
Hardware installation engineers
Commissioning engineers
Field maintenance engineers
System maintenance engineers
Conventions
Conventions
Conventions
Conventions
Conventions of screen output format:
Format
Format
Format
Format Description
Screen print
copyright © 2015 Maipu All rights reserved.
Description
Description
Description
Represents the output information of the screen
iii
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
Format
Format
Format
Format Description
Keywords of Screen print
Description
Description
Description
The red part represents the key information in the screen output
Symbol conventions:
Format
Format
Format
Format Description
Description
Description
Description
An alert that contains additional or supplementary information.
An alert that calls attention to important information that if not
understood or followed can result in data loss, data corruption, or
damage to hardware or software.
An alert that calls attention to important information that if not
understood or followed can result in personal injury or device
damage.
Command conventions:
Convention
Convention
Convention
Convention Description
Boldface
Italic Italic text represents arguments that you replace with actual values.
[ ]
{ x | y | ... }
[ x | y | ... ]
{ x | y | ... }
*
Description
Description
Description
Bold text represents commands and keywords that you enter literally as
shown.
Square brackets enclose syntax choices (keywords or arguments) that are
optional.
Braces enclose a set of required syntax choices separated by vertical bars,
from which you select one.
Square brackets enclose a set of optional syntax choices separated by
vertical bars, from which you select one or none.
Asterisk marked braces enclose a set of required syntax choices separated
by vertical bars, from which you select at least one.
iv
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
&<1-n>
# A line that starts with a pound (#) sign is comments.
The icons used in the manual and the meanings:
Icon
Icon
Icon
Icon Description
Supporting
Supporting
Supporting
Supporting Manuals
Manuals
Manuals
Manuals of
The supporting manuals of the product:
The argument or keyword and argument combination before the
ampersand (&) sign can be entered 1 to n times.
Description
Description
Description
Represents a generic switch
of
Product
of
Product
of Product
Product
Manual
Manual
Manual
Manual name
MyPower S6600 Series High-end Routing Switch Installation Manual
MyPower S6600 Series High-end Routing Switch Configuration Manual
Obtaining
Obtaining
Obtaining
Obtaining Documentation
Documentation
Documentation
Documentation
name
name
name Overview
You can access the most up-to-date Maipu product documentation on the World
Wide Web at www.maipu.com .
Technical
Technical
Technical
Technical Support
Support
Support
Support
Technical supporting hotline: 400-886-8669
Overview
Overview
Overview
Describes the device hardware specifications and installation methods,
guiding you to install the device
Describes the configuration methods and configuration steps of the device software functions, providing typical cases for reference
Fax: (+8628)85148948
copyright © 2015 Maipu All rights reserved.
v
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
Documentation
Documentation
Documentation
Documentation Feedback
Feedback
Feedback
Feedback
You can feed back your opinions and suggestions by:
Email: tech support@maipu.com
Technical hotline: 400-886-8669
We appreciate your comments.
Revision
Revision
Revision
Revision Records
Records
Records
Records
Version
Version
Version
Version Revision
V1.0 2015-01-08 First formal release
Revision
Revision
Revision Date
Date
Date
Date Revised
Revised
Revised
Revised Content
Content
Content
Content
vi
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual

Contents

Contents
Contents
Contents
Installation Preparations
PREFACE
PREFACE
PREFACE
PREFACE ·······················································································································································
CONTENTS
CONTENTS
CONTENTS
CONTENTS ··················································································································································
DEVICE
1
DEVICE
1
DEVICE
DEVICE INTRODUCTION
1
1
1.1
1.1
1.1
1.1 D
·······················································································································································
·······················································································································································
······················································································································································· III
··················································································································································
··················································································································································
·················································································································································· VII
D
EVICE
D
EVICE
D EVICE
EVICE A
INTRODUCTION
INTRODUCTION
INTRODUCTION ··················································································································
A
PPEARANCE
A
PPEARANCE
A PPEARANCE
PPEARANCE AND
··················································································································
··················································································································
·················································································································· 1-1
AND
AND
AND H
H
ARDW ARE
H
ARDW ARE
H ARDW ARE
ARDW ARE ·······························································································
·······························································································
·······························································································
······························································································· 1-1
1.1.1 SM6600-04-MF ··································································································································· 1-2
1.1.2 SM6600-08-MF ··································································································································· 1-3
1.2
MPU
C
············································································································································
1.2
MPU
1.2
1.2 MPU
MPU C
1.3
SFU
1.3
SFU
1.3
1.3 SFU
SFU C
1.4
LPU
1.4
LPU
1.4
1.4 LPU
LPU C
1.5
SIU
1.5
SIU
1.5
1.5 SIU
SIU C
1.6
P
1.6
P
1.6
1.6 P
P OWER
1.7
F
AN
1.7
F
AN
1.7
1.7
F
F
AN
AN M
1.7.1 F AN-7A-01
ARD
C
············································································································································
ARD
C ARD
ARD ············································································································································
············································································································································ 1-5
C
··············································································································································
ARD
C
··············································································································································
ARD
C ARD
ARD ··············································································································································
·············································································································································· 1-6
C
·············································································································································
ARD
C
·············································································································································
ARD
C ARD
ARD ·············································································································································
············································································································································· 1-7
C
··············································································································································
ARD
C
··············································································································································
ARD
C ARD
ARD ··············································································································································
·············································································································································· 1-8
OWER
OWER
OWER M
M
ODULE
M
ODULE
M ODULE
ODULE ···································································································································
M
ODULE
M
ODULE
M ODULE
ODULE AND
···································································································································
···································································································································
··································································································································· 1-8
D
AND
D
AND
AND D
D EVICE
F
AN M ODULE ················································································································· 1-10
EVICE
EVICE
EVICE A
A
V
IR
A
IR
A IR
IR V
································································································
ENT
V
································································································
ENT
V ENT
ENT ································································································
································································································ 1-10
1-10
1-10
1-10
III
III
III
VII
VII
VII
1-1
1-1
1-1
1-1
1-1
1-1
1-5
1-5
1-5
1-6
1-6
1-6
1-7
1-7
1-7
1-8
1-8
1-8
1-8
1-8
1-8
1.7.2 F AN-13A-01
F
AN M ODULE ··············································································································· 1-11
1.7.3 A IR V ENT OF S6600 S ERIES R OUTING S WITCH ················································································· 1-12
INSTALLATION
2
INSTALLATION
2
INSTALLATION
INSTALLATION PREPARATIONS
2
2
C
2.1
C
2.1
C
C HECK
2.1
2.1
HECK
HECK
HECK D
D
EVICE
D
EVICE
D EVICE
EVICE R
PREPARATIONS
PREPARATIONS
PREPARATIONS ·····································································································
R
UNNING
R
UNNING
R UNNING
UNNING E
E
NVIRONMENT
E
NVIRONMENT
E NVIRONMENT
NVIRONMENT ···························································································
·····································································································
·····································································································
····································································································· 2-1
···························································································
···························································································
··························································································· 2-1
2.1.1 C HECK E QUIPMENT R OOM C ONDITIONS ······························································································ 2-1
2.1.2 C HECK P OWER S
S
2.2
AFETY
S
2.2
2.2
2.2
AFETY
S
S AFETY
AFETY P
P
RECAUTIONS
P
RECAUTIONS
P RECAUTIONS
RECAUTIONS ··························································································································
UPPLY
S YSTEM ·········································································································· 2-2
··························································································································
··························································································································
·························································································································· 2-2
2.2.1 G ENERAL S AFETY ································································································································ 2-2
2.2.2 E LECTRICAL S AFETY ···························································································································· 2-3
2.2.3 S
TA TIC
S AFETY ····································································································································· 2-3
2.2.4 H ANDLING S AFETY ······························································································································ 2-4
2.2.5 L ASER S AFETY ····································································································································· 2-5
O
O
O
O PEN
PEN
PEN
PEN
-P
ACKAGE
-P
ACKAGE
-P
-P
ACKAGE
ACKAGE AND
2.3
2.3
2.3
2.3
I
AND
NSPECTION
I
AND
NSPECTION
AND I
I NSPECTION
NSPECTION ········································································································
········································································································
········································································································
········································································································ 2-5
2-1
2-1
2-1
2-1
2-1
2-1
2-2
2-2
2-2
2-5
2-5
2-5
copyright © 2015 Maipu All rights reserved.
vii
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
W
2.4
2.4
2.4
2.4
3
3
3
3
3.1
3.1
3.1
3.1
OODEN
W
OODEN
W
W OODEN
OODEN B
DEVICE
DEVICE
DEVICE
DEVICE INSTALLA TION
I
NSTALL
I
NSTALL
I
I NST ALL
NSTALL D
B
O
O
O PEN
-P
PEN
ACKAGE
-P
PEN
ACKAGE
PEN
-P
-P
ACKAGE
ACKAGE ············································································································
C
TO
ABINET
C
TO
ABINET
TO C
C ABINET
ABINET ··············································································································
OX
B
OX
B OX
OX O
INSTALLATION
INSTALLATION
INSTALLATION ····················································································································
D
EVICE
D
EVICE
D EVICE
EVICE TO
············································································································
············································································································
············································································································ 2-6
····················································································································
····················································································································
···················································································································· 3-1
··············································································································
··············································································································
·············································································································· 3-1
3.1.1 I NSTALLA TION P REP ARA TIONS ·············································································································· 3-1
3.1.2 C ABINET A DJUSTMENT ························································································································ 3-2
3.1.3 I NSTALL G UIDE R AIL AND F LOA TING N UT TO C ABINET ······································································ 3-3
3.1.4 I NSTALL D EVICE TO C ABINET ·············································································································· 3-6
3.1.5 I NSTALL C ABLING R ACK ······················································································································ 3-7
3.1.6 I NSTALLA TION C HECK ·························································································································· 3-7
D
3.2
3.2
3.2
3.2
3.3
3.3
3.3
3.3
EVICE
D
EVICE
D
D EVICE
EVICE G
I
NSTALL
I
NSTALL
I
I NST ALL
NSTALL S
G
ROUNDING
G
ROUNDING
G ROUNDING
ROUNDING ·····························································································································
S
URGE
S
URGE
S URGE
URGE P
·····························································································································
·····························································································································
····························································································································· 3-8
P
ROTECTOR
P
ROTECTOR
P ROTECTOR
ROTECTOR (O
(O
PTIONAL
(O
PTIONAL
(O PTIONAL
PTIONAL )
)
···························································································
)
···························································································
) ···························································································
··························································································· 3-9
3.3.1 I NSTALL AC S URGE P ROTECTOR ·········································································································· 3-9
3.3.2 I NSTALL N ETWORK P OR T S URGE P ROTECTOR ··················································································· 3-10
2-6
2-6
2-6
3-1
3-1
3-1
3-1
3-1
3-1
3-8
3-8
3-8
3-9
3-9
3-9
3.4
3.4
3.4
3.4
C
ONNECT
C
ONNECT
C
C ONNECT
ONNECT P
P
OWER
P
OWER
P OWER
OWER C
C
C
C ABLE
···················································································································
ABLE
···················································································································
ABLE
ABLE ···················································································································
··················································································································· 3-12
3-12
3-12
3-12
3.4.1 I NSTALLA TION P REP ARA TIONS ············································································································ 3-12
3.4.2 C ONNECT AC P OWER C ABLE ············································································································ 3-12
3.4.3 C ONNECT DC P OWER C ABLE ············································································································ 3-13
3.5
3.5
3.5
3.5
POWER
4
POWER
4
POWER
POWER ON
4
4
4.1
4.1
4.1
4.1
C
HECK
C
HECK
C
C HECK
HECK AFTER
L
OG
INTO
L
OG
INTO
L
L OG
OG INTO
INTO D
AFTER
AFTER
AFTER I
ON
ON
ON AND
I
NSTALLATION
I
NSTALLATION
I NST ALLA TION
NSTALLATION ·············································································································
AND
RUN
AND
RUN
AND RUN
RUN DEVICE
D
D
D EVICE
·································································································································
EVICE
·································································································································
EVICE
EVICE ·································································································································
································································································································· 4-1
·············································································································
·············································································································
············································································································· 3-14
DEVICE
DEVICE
DEVICE ·········································································································
·········································································································
·········································································································
········································································································· 4-1
3-14
3-14
3-14
4.1.1 C ONNECT C ONFIGURA TION C ABLE ······································································································ 4-1
4.1.2 S ET PC H YPER T ERMINAL
4.1.3 P OWER ON AND S
TART
P
ARAMETERS ······························································································ 4-2
························································································································· 4-6
4.1.4 C HECK AFTER P OWER - ON ···················································································································· 4-7
A
4.2
4.2
4.2
4.2
CCESS
A
CCESS
A
A CCESS
CCESS N
4.2.1 A CCESS N ETWORK VIA E THERNET T WISTED
N
ETWORK
N
ETWORK
N ETWORK
ETWORK ································································································································
································································································································
································································································································
································································································································ 4-9
P
AIR ··············································································· 4-9
4-1
4-1
4-1
4-1
4-1
4-1
4-9
4-9
4-9
4.2.2 A CCESS N ETWORK VIA LC F IBER ······································································································ 4-10
4.2.3 A CCESS N ETWORK VIA MPO F IBER ·································································································· 4-13
4.2.4 A CCESS N ETWORK VIA S TANDBY C ABLE ·························································································· 4-15
4.3
4.3
4.3
4.3
viii
H
ARDW ARE
H
ARDW ARE
H
H ARDW ARE
ARDW ARE M
M
ANAGEMENT
M
ANAGEMENT
M ANAGEMENT
ANAGEMENT ·················································································································
·················································································································
·················································································································
················································································································· 4-16
copyright © 2015 Maipu All rights reserved.
4-16
4-16
4-16
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
4.3.1 V IEW S OFTW ARE AND H ARDW ARE V ERSION I NFORMATION OF S WITCH ··········································· 4-17
4.3.2 V IEW S YSTEM E NVIRONMENT T EMPERA TURE I NFORMATION ···························································· 4-18
4.3.3 V IEW
4.3.4 V IEW P OWER M ODULE S
4.3.5 V IEW B ACKPLANE S
4.3.6 V IEW MPU C ARD S
4.3.7 V IEW SFU C ARD S
4.3.8 V IEW LPU C ARD S
F
AN S
TA TUS
I NFORMATION ······································································································· 4-19
TA TUS
I NFORMATION ·················································································· 4-20
TA TUS
I NFORMATION ························································································· 4-21
TA TUS
I NFORMATION ·························································································· 4-23
TA TUS
I NFORMATION ··························································································· 4-27
TA TUS
I NFORMATION ··························································································· 4-31
4.3.9 V IEW S W APP ABLE O PTICAL M ODULE I NFORMATION ········································································· 4-35
TROUBLESHOOTING
5
TROUBLESHOOTING
5
TROUBLESHOOTING
TROUBLESHOOTING ··························································································································
5
5
T
5.1
5.1
5.1
5.1
ROUBLESHOOTING
T
ROUBLESHOOTING
T
T ROUBLESHOOTING
ROUBLESHOOTING OF
··························································································································
··························································································································
·························································································································· 5-1
C
OF
ONFIGURATION
C
OF
ONFIGURATION
OF C
C ONFIGURATION
ONFIGURATION S
S
YSTEM
S
YSTEM
S YSTEM
YSTEM ·············································································
·············································································
·············································································
············································································· 5-1
5.1.1 T ROUBLESHOOTING ABOUT NO D ISPLAY ON T ERMINAL ······································································ 5-1
5.1.2 T ROUBLESHOOTING ABOUT M ESSY C ODE ON T ERMINAL ···································································· 5-2
P
5.2
5.2
5.2
5.2
5.3
5.3
5.3
5.3
OWER
P
OWER
P
P OWER
OWER T
F
AN
F
AN
F
F
AN
AN T
T
ROUBLESHOOTING
T
ROUBLESHOOTING
T ROUBLESHOOTING
ROUBLESHOOTING ·················································································································
T
ROUBLESHOOTING
T
ROUBLESHOOTING
T ROUBLESHOOTING
ROUBLESHOOTING ·······················································································································
·················································································································
·················································································································
················································································································· 5-2
·······················································································································
·······················································································································
······················································································································· 5-3
5-1
5-1
5-1
5-1
5-1
5-1
5-2
5-2
5-2
5-3
5-3
5-3
T
5.4
5.4
5.4
5.4
5.5
5.5
5.5
5.5
5.6
5.6
5.6
5.6
5.7
5.7
5.7
5.7
6
6
6
6
6.1
6.1
6.1
6.1
ROUBLESHOOTING
T
ROUBLESHOOTING
T
T ROUBLESHOOTING
ROUBLESHOOTING OF
T
ROUBLESHOOTING
T
ROUBLESHOOTING
T
T ROUBLESHOOTING
ROUBLESHOOTING OF
T
ROUBLESHOOTING
T
ROUBLESHOOTING
T
T ROUBLESHOOTING
ROUBLESHOOTING OF
G
T
ET
ECHNICAL
G
T
ET
ECHNICAL
G
G ET
ET T
T ECHNICAL
ECHNICAL S
DEVICE
DEVICE
DEVICE
DEVICE MAINTENANCE
C
C
C
C HANGE
MAINTENANCE
MAINTENANCE
MAINTENANCE ····················································································································
HANGE
HANGE
HANGE M
M
ODULES
M
ODULES
M ODULES
ODULES ·······························································································································
S
MPU
C
OF
MPU
OF
OF MPU
MPU C
SFU
OF
OF
OF SFU
OF
OF
OF LPU
UPPORTING
S
UPPORTING
S UPPORTING
UPPORTING ··············································································································
·······························································································································
·······························································································································
······························································································································· 6-1
C
SFU
C
SFU C
C ARD
LPU
LPU
LPU C
····················································································································
····················································································································
···················································································································· 6-1
····································································································
ARD
C
····································································································
ARD
C ARD
ARD ····································································································
···································································································· 5-4
······································································································
ARD
······································································································
ARD
ARD ······································································································
······································································································ 5-4
C
·····································································································
ARD
C
·····································································································
ARD
C ARD
ARD ·····································································································
····································································································· 5-5
··············································································································
··············································································································
·············································································································· 5-6
6.1.1 C HANGE P OWER M ODULE ··················································································································· 6-1
6.1.2 C HANGE C ARD ····································································································································· 6-3
6.1.3 C HANGE
F
AN M ODULE ························································································································ 6-5
6.1.4 C HANGE CF C ARD ······························································································································· 6-7
6.1.5 C HANGE S W APP ABLE O PTICAL M ODULE ····························································································· 6-9
6.1.6 C HANGE M EMORY ····························································································································· 6-11
6.1.7 C HANGE C HASSIS A IR F ILTER ············································································································ 6-12
5-4
5-4
5-4
5-4
5-4
5-4
5-5
5-5
5-5
5-6
5-6
5-6
6-1
6-1
6-1
6-1
6-1
6-1
D
D
D
D UST
UST
UST
UST M
M
AINTENANCE
M
AINTENANCE
M AINTENANCE
AINTENANCE OF
OF
OF
OF THE
THE
THE
THE D
6.2
6.2
6.2
6.2
copyright © 2015 Maipu All rights reserved.
D
D
D EVICE
································································································
EVICE
································································································
EVICE
EVICE ································································································
································································································ 6-14
ix
6-14
6-14
6-14
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
6.2.1 R EMOVE D UST FOR A IR F IL TER ········································································································· 6-15
6.2.2 R EMOVE D UST FOR
F
AN M ODULE ····································································································· 6-16
6.2.3 R EMOVE D UST FOR B OARDS ············································································································· 6-16
6.2.4 R EMOVE D UST FOR O PTICAL I NTERFACE AND P IGT AIL C ONNECTOR ················································ 6-17
APPENDIX
APPENDIX
APPENDIX
APPENDIX ·················································································································································
·················································································································································
·················································································································································
················································································································································· 6.2-1
6.2-1
6.2-1
6.2-1
A Specifications of Whole Device and Common Modules ········································································· A-1
A1 Power Consumption/W eight/Dimension ······························································································· A-1
A2 Specifications of MPU Card ·················································································································· A-2
A2.1 SM66-MPUA ····································································································································· A-3
A2.2 SM66-MPUB ······································································································································ A-4
A3 Specifications of SFU Card ··················································································································· A-6
A3.1 SM66-SFUA ······································································································································· A-7
A3.2 SM66-SFUB ······································································································································· A-7
A4 Specifications of LPU Card ··················································································································· A-8
A4.1 SM66-8XGEF2QXGE ························································································································ A-8
A4.2 SM66-24GET24GEF ·························································································································· A-9
A4.3 SM66-48GET ··································································································································· A-11
A4.4 SM66-48GEF ··································································································································· A-12
A4.5 SM66-48GETP ································································································································· A-13
A5 Specifications of SIU Card ·················································································································· A-14
A6 Specifications of Power Module ·········································································································· A-14
A6.1 AD1000-1S007Z AC Power Module ································································································ A-15
A6.2 DD1000-5S007Z DC Power Module ······························································································· A-16
B Specifications of General Interfaces ······································································································ B-17
B1 Console Port Attribute ·························································································································· B-17
B2 10Base-T/100Base-TX/1000Base-T-RJ45 Electrical Port Attributes ·················································· B-17
B3 10Base-T/100Base-TX/1000Base-T RJ45 POE+ Interface Attributes ················································ B-18
B4 1000Base-X-SFP Optical Port Attributes ····························································································· B-18
B5 10GBase-SR/LR SFP+ Optical Port Attributes ···················································································· B-19
B6 40GBase-SR4 QSFP+ Optical Port Attributes ····················································································· B-19
x
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
B7 CF Interface Attributes ························································································································· B-19
C Cable ························································································································································ C-1
C1 Console Cable ········································································································································ C-1
C2 Ethernet Eletcical Port Cable ················································································································· C-2
C3 1000Base-X SFP 1000M Optical Module Model and Corresponding Interface Cable Relationship
Table ······························································································································································· C-3
C4 10GBase-SR/LR SFP+ 10G Optical Module Model and Corresponding Interface Cable Relationship
Table ······························································································································································· C-3
C5 40GBase-SR4 QSFP+ 10G Optical Module Model and Corresponding Interface Cable Relationship
Table ······························································································································································· C-4
C6 10G Optical Interface Passive Cable Relationship Table ······································································· C-4
C7 40G Optical Interface Passive Cable Relationship table ········································································ C-5
C8 DC Power Input Cable ··························································································································· C-5
D Device Running Environment Requirement ···························································································· D-1
D1 Environment Requirement of Equipment Room ··················································································· D-1
D1.1 Building Requirement of Equipment Room ······················································································· D-1
D1.2 Temperature Requirement ·················································································································· D-1
D1.3 Humidity Requirement ······················································································································· D-2
D1.4 Load-bearing Requirement ················································································································· D-2
D1.5 Space Requirement ····························································································································· D-3
D1.6 Cleanliness Requirement ···················································································································· D-3
D1.7 Anti-interference Requirement ··········································································································· D-4
D1.8 Grounding Requirement ····················································································································· D-4
D2 Requirements for Power Supply ············································································································ D-4
D2.1 AC Power Supply Requirement ········································································································· D-4
D2.2 AC Power Supply Suggestions ··········································································································· D-5
D2.3 DC Power Supply Requirement ········································································································· D-6
D2.4 DC Power Supply Suggestions ··········································································································· D-6
E Device Grounding Specification and Protection ······················································································ E-1
E1 Device Grounding Specifications ··········································································································· E-1
copyright © 2015 Maipu All rights reserved.
xi
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
E1.1 Universal Grounding Specifications ···································································································· E-1
E1.2 Building Grounding Specifications of Equipment Room ···································································· E-1
E1.3 Device Grounding Specifications ········································································································ E-2
E1.4 Grounding Specifications of Communication Power ·········································································· E-2
E1.5 Laying Specifications of Ground Wires ······························································································ E-3
E2 Device Protection ··································································································································· E-4
E2.1 General Requirement of Lightning Protection Wires ·········································································· E-4
E2.2 Installation Method of Cable Wiring ··································································································· E-5
E2.3 Equipotential Connection Requirement and Method ·········································································· E-7
F Wiring Recommendation ·························································································································· F-1
F1 Wiring Recommendation during Installation ·························································································· F-1
F2 Cable Binding Recommendation ············································································································ F-2
G Environmental Substance Statement ······································································································· G-1
xii
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
1
1
Device
Device
Device

Device Introduction

1
1
This chapter describes the hardware of the device, including:
1.1 Device Appearance and Hardware
1.2 MPU Card
1.3 SFU Card
1.4 LPU Card
Introduction
Introduction
Introduction
Installation Preparations
1.5 SIU Card
1.6 Power Module
1.7 Fan Module and Device Air Vent
Device
Device
1.1 Device
Device Appearance
MyPower S6600 series high-end routing switch ( Hereinafter referred to as S6600
Series Routing Switches ) contains two product models: SM6600-04-MF and
SM6600-08-MF .
Appearance
Appearance
Appearance and
S6600 series routing switch contains four slot types, that is, MPU , SFU , LPU ,
and SIU . The four types of slots are inserted with MPU, SFU, LPU, and SIU
cards respectively .
and
and
and Hardware
Hardware
Hardware
Hardware
MPU: Main Processing Unit control card. For the specifications, refer to A2
Specifications of MPU Card .
SFU: Switching Fabric Unit switch card. For the specifications, refer to A3
Specifications of SFU Card .
LPU: Line Processing Unit user network interface card. For the specifications,
copyright © 2015 Maipu All rights reserved.
1
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
refer to A4 Specifications of LPU Card .
SIU: System Interface Unit system interface card. For the specifications, refer
to A5 Specifications of SIU Card .
1.1.1

SM6600-04-MF

1.1.1
SM6600-04-MF
1.1.1
1.1.1 SM6600-04-MF
SM6600-04-MF
The dimension of SM6600-04-MF is 444mm
465mm
×
499mm (W × D × H). The
×
front appearance diagram of SM6600-04-MF is as shown in Figure 1-1 and the
back appearance diagram is as shown in Figure 1-2.
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
1
1
1
1 SM6600-
SM6600-
SM6600-
SM6600- 04
04
04
04 -MF
-MF
-MF
FRONT
FRONT
-MF
FRONT
FRONT APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
1.Device outlet 2. Mounting ear
3.Power module slots (0-3) 4. Anti-static wrist socket
5. LPU card slots ( 0-3) 6.SFU card slots (0-1)
7.MPU card slots (0-1) 8. Device head
2
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
2
SM6600-04-MF
1
2
SM6600-04-MF
1
1
2
2 SM6600-04-MF
SM6600-04-MF
BACK
APPEARANCE
BACK
APPEARANCE
BACK
BACK APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
1. Device inlet 2. Air filter
3. Fan module slot 4. Power module fan outlet
5. Grounding screw
1.1.2

SM6600-08-MF

1.1.2
SM6600-08-MF
1.1.2
1.1.2 SM6600-08-MF
SM6600-08-MF
The dimension of SM6600-08-MF is 44 4mm × 465mm × 711mm (W × D × H). The
front appearance diagram of SM6600-08-MF is as shown in Figure 1-3 and the
back appearance diagram is as shown in Figure 1-4.
copyright © 2015 Maipu All rights reserved.
3
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
3
SM6600-08-MF
1
3
SM6600-08-MF
1
1
3
3 SM6600-08-MF
SM6600-08-MF
FRONT
FRONT
FRONT
FRONT APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
1.Device outlet 2. Mounting ear
3.Power module slots (0-3) 4. Anti-static wrist socket
5. LPU card slots ( 0-7) 6.SFU card slots (0-1)
7.MPU card slots (0-1) 8. Device head or SIU card slot
4
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
4
SM6600-08-MF
1
4
SM6600-08-MF
1
1
4
4 SM6600-08-MF
SM6600-08-MF
1. Device inlet 2. Air filter
3. Fan module slot 4. Power module fan outlet
5. Grounding screw
MPU
MPU
1.2 MPU

MPU Card

Card
Card
Card
MPU: Main Processing Unit control card
The MPU card is the mandatory card in the SM6600 series routing switch and it
copyright © 2015 Maipu All rights reserved.
BACK
APPEARANCE
BACK
APPEARANCE
BACK
BACK APPEARANCE
APPEARANCE DIAGRAM
5
DIAGRAM
DIAGRAM
DIAGRAM
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
acts as the control center of the device. Each frame can support two MPU cards at
the same time, realizing the 1:1 backup work mode.
The MPU card of SM6600 series device has two shapes, that is, half-width card
and full-width card.
The appearance of the half-width MPU card is as follows:
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
5
T
1
5
T
HE
APPEARANCE
HE
1
1
5
5 T
APPEARANCE
T
HE
HE APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
THE
THE
THE HALF
HALF
HALF
HALF
-
-
WIDTH
WIDTH
-
-
WIDTH
WIDTH
MPU
MPU
MPU
MPU
CARD
CARD
CARD
CARD
1. C aptive screw 2. Card extractor
3. CF card slot 4. Function port
5. Function status indicator 6. MPU card ID color block (yellow)
The appearance diagram of the full-width MPU card:
F
F
IGURE
IGURE
F
F
IGURE
IGURE
1. C aptive screw 2. Card extractor
1
6
T
1
6
T
HE
APPEARANCE
HE
1
1
6
6 T
APPEARANCE
T
HE
HE APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
THE
THE
THE FULL
FULL
FULL
FULL
-
-
WIDTH
WIDTH
-
-
WIDTH
WIDTH
MPU
MPU
MPU
MPU
CARD
CARD
CARD
CARD
SFU
SFU
1.3 SFU

SFU Card

6
3. Function port 4. CF card slot
5. Function status indicator 6. MPU card ID color block (yellow)
Card
Card
Card
SFU: Switching Fabric Unit switching card
The SFU card is the switching network unit of the S6600 series routing switching,
realizing the switching function of the service data between the LPU cards. When
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
inserting two cards, realize the 1+1 backup function.
The appearance diagram of the SFU card is as follows:
Installation Preparations
LPU
LPU
1.4 LPU

LPU Card

F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
7
T
1
7
T
HE
APPEARANCE
HE
1
1
7
7 T
APPEARANCE
T
HE
HE APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
SFU
SFU
THE
THE
THE
CARD
CARD
SFU
SFU
CARD
CARD
1. C aptive screw 2. Card extractor
3. LPU card status indicator 4. SFU card ID color block (blue)
The SFU card contains two versions. Different versions of SFU cards cannot be
in mixed use, that is, each frame can only be configured with the same version
of SFU card.
Card
Card
Card
LPU: Line Processing Unit user network interface card. It provides various
different interface shapes for the user to select, meeting the requirements of
various application scenarios.
The appearance diagram of the LPU card is as follows:
F
F
IGURE
IGURE
F
F
IGURE
IGURE
1. C aptive screw 2. Card extractor
3. Status indicator 4. Function port
copyright © 2015 Maipu All rights reserved.
1
8
T
1
8
T
HE
APPEARANCE
HE
1
1
8
8 T
APPEARANCE
T
HE
HE APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
7
OF
OF
OF THE
LPU
LPU
THE
THE
THE
CARD
CARD
LPU
LPU
CARD
CARD
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
5. LPU card ID color block (green)
SIU
Card
SIU
1.5 SIU
Card

SIU Card

Card
SIU : System Interface Unit system interface card
The SIU card is used for SM6600-08-MF and one is optional. With the LCD panel
and buttons, the user can query the product working status and indicate the
system working status via the LED indicator.
The SM66-SIU appearance diagram is as follows:
Power
Power
1.6 Power

Power Module

F
F
IGURE
IGURE
F
F
IGURE
IGURE
1. C aptive screw 2. Company logo
3. LCD screen 4. Function button
5. Status indicator 6. Device model nameplate
Module
Module
Module
1
1
1
1
9
9
SM66-
9
SM66-
9 SM66-
SM66- SIU
SIU
SIU
APPEARANCE
APPEARANCE
SIU
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
S6600 series routing switch supports AC and DC power supply mode. The user
can select the AC or DC power module as desired.
The AC and DC power modules both can support N+1 redundant backup and also
can realize the output power balance, so as to improve the system reliability. The
power modules automatically realize the current sharing and do not need the
user operation.
8
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
The power module types in one switch should be the same. The AC power
module and DC power module cannot be in mixed use.
Installation Preparations
When installing the power, please switch the power switch to
If some power modules are inserted on the frame, but the power switch is not
OFF .
enabled, the system regards that the disabled power modules are faulty and
the system alarms.
The appearance diagram of the AC power module is as follows:
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
10
10
T
10
T
HE
HE
10 T
T
HE
HE APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
1
1
1
AC
AC
THE
THE
THE
POWER
POWER
AC
AC
POWER
POWER MODULE
MODULE
MODULE
MODULE
1. Power switch 2. Power status indicator
3. AC power socket 4. Mousing hook of power cable
5. Installation handle 6. C aptive screw
The appearance diagram of the DC power module is as follows:
F
F
IGURE
IGURE
F
F
IGURE
IGURE
1. Power switch 2. Power status indicator
1
11
11
T
11
T
HE
HE
11 T
T
HE
HE APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
1
1
1
DC
DC
THE
THE
THE
POWER
POWER
DC
DC
POWER
POWER MODULE
MODULE
MODULE
MODULE
3. DC power socket 4. Installation handle
copyright © 2015 Maipu All rights reserved.
9
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
5. C aptive screw
1.7 Fan
Fan
Fan
Fan Module
Module
Module
Module and
The fan module of S6600 series routing switch is the important part for ensuring
the normal running of the device system (mandatory module), providing the air
flow for the system heat dissipation . It has the following functions and features:
and
and
and Device
Valid heat dissipation : Ensure the long-time normal running of the device
Status monitoring: Support the fan fault alarming
Auto speed adjustment: You can automatically adjust the speed according to
the device running, reducing the noise and power consumption effectively.
Information prompt: There is one indicator on the front panel of the fan
module, indicating whether the fan works normally in real time.
Support hot-swap: Replace the fan module without interrupting the switching
running.
Device
Device
Device Air
Air
Vent
Air
Vent
Air Vent
Vent
SM6600-04-MF and SM6600-08-MF use different models of fan modules
respectively and cannot be in mixed use.
1.7.1
FAN-7A-01
1.7.1
FAN-7A-01
1.7.1
1.7.1 FAN-7A-01
FAN-7A-01 Fan
FAN-7A-01 fan module is the mandatory module of SM6600-04-MF and supports
hot-swap. Each SM6600-04-MF has one FAN slot and should be installed with one
FAN-7A-01 fan module so that the system can run normally. The diagram of the
fan module is as follows:
Fan
Module
Fan
Module
Fan Module
Module
10
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
12
1
1
1
FAN-7A-01
12
FAN-7A-01
12
12 FAN-7A-01
FAN-7A-01
MODULE
MODULE
MODULE
MODULE DIAGRAM
1. Captive screw 2. Fan status indicator
3. Installation handle
The meaning of the indicator is as follows:
T
T
T
T
Name
Name
FAN Single-color green
1.7.2
FAN-13A-01
1.7.2
FAN-13A-01
1.7.2
1.7.2 FAN-13A-01
FAN-13A-01 Fan
1
1
T
1
1
ABLE
ABLE
ABLE
ABLE
Name
Name Indicator
T
HE
INDICATOR
HE
1
1
1
1 T
INDICATOR
T
HE
HE INDICATOR
INDICATOR OF
Fan
Module
Fan
Module
Fan Module
Module
OF
OF
OF THE
DIAGRAM
DIAGRAM
DIAGRAM
FAN-7A-01
FAN-7A-01
THE
THE
FAN-7A-01
FAN-7A-01
THE
Indicator
Indicator
Indicator color
color
color
color Status
MODULE
MODULE
MODULE
MODULE PANEL
PANEL
PANEL
PANEL
Status
Status
Status Description
On: The fan works normally
Off: The fan works abnormally
Description
Description
Description
FAN-13A-01 fan module is the mandatory module of SM6600-0 8 -MF and
supports hot-swap. Each SM6600-0 8 -MF has one FAN slot and should be installed
with one FAN-13A-01 fan module so that the system can run normally. The
diagram of the fan module is as follows:
F
F
IGURE
IGURE
F
F
IGURE
IGURE
copyright © 2015 Maipu All rights reserved.
1
13
1
1
1
FAN-13A-01
13
FAN-13A-01
13
13 FAN-13A-01
FAN-13A-01
MODULE
MODULE
MODULE
MODULE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
11
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
1. Captive screw 2. .Fan status indicator
3. Installation handle
The meaning of the indicator is as follows:
T
T
T
T
Name
Name
1
2
T
1
2
ABLE
ABLE
ABLE
ABLE
Name
Name Indicator
T
HE
INDICATOR
HE
1
1
2
2 T
INDICATOR
T
HE
HE INDICATOR
INDICATOR OF
OF
OF
OF THE
FAN-13A-01
FAN-13A-01
THE
THE
FAN-13A-01
FAN-13A-01
THE
Indicator
Indicator
Indicator color
MODULE
MODULE
MODULE
MODULE PANEL
color
color
color Status
PANEL
PANEL
PANEL
Status
Status
Status Description
Description
Description
Description
FAN Single-color green On: The fan works normally
Off: The fan works abnormally
1.7.3
Air
Vent
of
1.7.3
1.7.3
1.7.3 Air
Air
Vent
Air Vent
Vent of
S6600
of
S6600
of S6600
S6600 Series
Series
Series
Series Routing
Routing
Routing
Routing Switch
Switch
Switch
Switch
The air flow direction inside the chassis of S6600 series routing switch:
MPU card, SFU card, and LPU card area: The air flow direction is right-in and
left-out;
The power module area: The air flow direction is front-in and back-out.
The diagram of the outlet and inlet air vents in S6600 series routing switch
chassis is as follows:
F
F
IGURE
IGURE
F
F
IGURE
IGURE
12
1
14
14
14
14 T
T
T
T
HE
HE
HE
HE AIR
AIR
VENT
AIR
VENT
AIR VENT
VENT DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
1
1
1
S6600
S6600
OF
OF
S6600
S6600
OF
SERIES
SERIES
SERIES
SERIES ROUTING
ROUTING
ROUTING
ROUTING SWITCH
SWITCH
SWITCH
SWITCH CHASSIS
CHASSIS
CHASSIS
CHASSIS
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
Please keep the device air vent unblocked when the device runs.
Installation Preparations
copyright © 2015 Maipu All rights reserved.
13
MyPower S6600 Series Routing Switch Installation Manual
2
2
Installation
Installation
Installation

Installation Preparations

2
2
This chapter describes the preparations before installing the device and the
related work, including:
2.1 Check Device Running Environment
2.2 Safety Precautions
2.3 Open-Package and Inspection
Preparations
Preparations
Preparations
Installation Preparations
2.1
Check
2.1
Check
2.1
2.1 Check
Check Device
2.1.1
2.1.1
2.1.1
2.1.1 Check
Check
Check
Check Equipment
2.4 Wooden Box Open-Package
When the device is delivered, there is the packing list. Please confirm whether
the accessories are complete and good according to the items in the packing
list. If there is damaged or loss, please contact Maipu technical staff to
change.
Device
Device
Device Running
Equipment
Equipment
Equipment Room
To ensure the normal running of the device, take the corresponding measures to
meet the environment requirement of the device running:
Running
Running
Running Environment
Room
Room
Room Conditions
Environment
Environment
Environment
Conditions
Conditions
Conditions
Air conditioning and ventilation system can ensure the normal running
temperature and humidity conditions of the device. For details, refer to D1
Environment Requirement of Equipment Room .
The good grounding is the basis of the device running and the important
guarantee conditions of preventing lightning and resisting interference.
Ensure that grounding meets the grounding specifications. For details, refer
to E1 Device Grounding Specifications .
copyright © 2015 Maipu All rights reserved.
1
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
Confirm whether there is enough installation space and handling channel
space.
Ensure that the cleanness of the equipment room meets the requirement. Do
not place the device in the environment with lots of dust, such as being
renovated.
2.1.2
2.1.2
2.1.2
2.1.2 Check
Step 1: Estimate the whole power consumption of the switch.
Step 2: Select the appropriate power module according to the power consumption and
Step 3: Confirm that the power supply system in the installation place can meet the input
Check
Check
Check Power
Power
Power
Power Supply
The good power system is the basis of the wireless controller starting and stable
running. To meet the power supply requirement of S6600 series routing switch,
please complete the following steps:
power supply mode of the switch.
To ensure the normal running of the switch, you need to ensure that the maximum
output power of the power module providing power for the switch is larger than the
whole power consumption of the switch (it is suggested to reserve some power
consumption derating ).
requirement of the device power.
Ensure that the power supply system of the installation place is stable and can
meet the parameter requirement of the selected power module , such as input
mode and rated input voltage. For details, refer to D2 Requirements for Power
Supply .
Supply
Supply
Supply System
System
System
System
For the power consumption data of the switch , refer to A1 Specifications of
Whole Device and Common Modules .
2
copyright © 2015 Maipu All rights reserved.
MyPower S6600 Series Routing Switch Installation Manual
2.2
Safety
2.2
Safety
2.2
2.2 Safety

Safety Precautions

Precautions
Precautions
Precautions
Installation Preparations
2.2.1
2.2.1
2.2.1
2.2.1 General
2.2.2
2.2.2
2.2.2
2.2.2 Electrical
General
General

General Safety

Electrical
Electrical

Electrical Safety

Safety
Safety
Safety
Ensure that the ground of the installation place is dry and smooth and you
have made the anti-skidding measures.
Keep the device clean and dust-free; do not place the device in the damp
place.
When moving the switch and the related parts (such as power and chassis) ,
need multiple persons to cooperate and avoid that the body is scratched by
the sharp part of the equipment. Please wear the working gloves.
Safety
Safety
Safety
2.2.3
2.2.3
2.2.3
2.2.3 Static
Static
Static

Static Safety

Please check whether there are potential dangers. For example, the power is
not grounded, power supply grounding is not reliable, and the ground is wet.
Before installation, get to know the location of the emergency power switch in
the room; when there is an accident, cut off the emergency power switch at
first.
Before moving the chassis, be sure to unplug all external cables (including
power cable).
When maintaining with power, it is recommended that there are two or more
persons in the field.
When closing the power , ensure that the neutral line and live line are
disconnected.
Safety
Safety
Safety
To avoid the static from damaging the electronic parts of the switch, we need to
take the anti-static measures.
copyright © 2015 Maipu All rights reserved.
3
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
When installing or replacing the components of the switch, especially
installing or replacing the components with the circuit board (such as
board), we should wear anti-static wrists.
When holding the circuit board, please hold the edge of the circuit board and
do not touch the components or printed circuit.
For the security , please check the resistance of the anti-static wrists. The
resistance between the body and the ground should be 1-10 megohms.
The using steps of the anti-static wrist are as follows:
Step 1: Put the hand s into the anti-static wrist.
Step 2: Tighten the fastener and confirm that the piece metal on the anti-static wrist is
well contacted with the skin.
Step 3: Insert the anti-static wrists into the anti-static wrist socket, or clip the alligator
clip to the grounding pole of the chassis.
Step 4: Confirm that the anti-static wrist well-grounded.
The using method of the anti-static wrist is as shown in the following figure.
F
F
IGURE
IGURE
F
F
IGURE
IGURE
4
2
1
U
2
1
U
SING
METHOD
SING
2
2
1
1 U
U
METHOD
SING
SING METHOD
METHOD DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
THE
THE
THE ANTI
ANTI
ANTI
ANTI
-
-
STATIC
STATIC
-
-
STATIC
STATIC WRIST
WRIST
WRIST
WRIST
copyright © 2015 Maipu All rights reserved.
Loading...
+ 144 hidden pages