MAIDI BIDI1401 Installation & Assembly

Installation steps
7 10
Installation steps
Parts display
PRESSURE BALANCE
SHOWER SET
7. Put on the handle, then tight the screw.
8
8. Warp the thread of spout with teflon tape (ensure it must warp clockwise).Screw-in to the inlet pipe inside the wall, then install the decorative cover on the wall clingy.
10. Insert the spout to the pipe which outside the wall,then tighten the screw.
Part description
No.
1
2
3
4
5
Description
shower arm
shower head
diverter handle
on/off handle
Part
1
1
1
1
1
03
06
01
02
04
05
07
09
12
Website: www.mmcasainc.com
Tel: (303)747-4321
Service Contact : service@mmcasainc.com
9
9. Install the shower arm,shower head and flange to the fitting. (stick to the wall).Tighten the showerhead to the shower arm with the pipe tape.(Make sure the pipe tape with clockwise direction).
6
7
8
9
10
11
12
13
cartridge
handle shower
hanging fork
shower hose
allen key
screw set
flow regulator
bath spout
1
1
1
1
1
1
10
13
08
11
1
1
Installation steps
Installation steps
Adjustable wrench Philips Sorewdriver
Hexagon wrenchPipe tape
CARTRIDGE
• Pressure Balance cartridge
STANDARDS
• Third party certified to meet ASME A112.18.1 all applicable requirements referenced therein
• ADA for lever handle
Important
1.Please check that all components are present.
2.Before installation ensure that all feed lines are clear of debris and
on/off valve is present.
3.Ensure water pressure is between 20-125 PSI (includes combination
of hot and cold feed lines).
4.Pictures in the manual are general in content and may not represent
exactly your purchased faucet. If you are having difficulties please
contact a professional plumber.
5.If you will be away from home for an extended period you should
shut off the main water supply.
6.Please insure that to make a wash for all water pipe before
installation to insure no impurity inside.
7.When you need to welding the shower valve to the water pipe of the
valve , please remember to take out the cartridge and any seal parts of
the valve . When finish welding , need to wait for body of the valve
cool down and then install the cartridge and the seal parts.
8.Need to used the 11-13N.m power to lock the cartridge.
1
1. Confirm the installed place of the pressure balance valve and fixed on the wood block .
2
Top shower outlet water
bath spout
outlet water
Hot water
2. Connect the hot&cold inlet tube and outlet tube,then make sure the tube fix stable on the wooden wall.
Handle shower outlet water
Cold water
3
4
4.Please cut the size of the tile hole according to the size and shape of the protetived cover( about 5mm bigger than the protetived cover from each side) .And please put the tile outside the wooden wall(please noted that we keep the same central point for the tile hole with the protetived cover).
5
5. Loosen the screw and remove protect cover.
6
All valve have the pass the the air testing and
pressure testing before ship out. If request presssure
testing before installation,Must under the guide of the
professional Plumber with license. And air pressure
do not over 125PSI. lf you want to the Brust testing
over 50±2PSI,you need to changed a new cartridge for
normal using.
3. Lock the install protective cover into the body. (155*100mm oval type).
6.Lock the deck plate into the body and cling to the wall,then tight the screw.