Installation and Maintenance
Sensing Solutions since 1959
R2 Controller
Installation Instructions
• Set both float switches “Normally Closed”.
•Connect Upper float switch to pins 5 and 6, Lower float switch to pins 5 and 8.
• Jumper supply voltage from terminal 2 to terminal 1.
•Connect one end of the pump / valve to terminal 3 and other end to terminal 7.
•Connect input power to terminals 2 and 7.
• Set both float switches “Normally Open”.
•Connect Upper float switch to pins 5 and 8, Lower float switch to pins 5 and 6.
• Jumper supply voltage from terminal 2 to terminal 1.
•Connect one end of the pump / valve to terminal 3 and other end to terminal 7.
•Connect input power to terminals 2 and 7.
R2 Controller
Float Switch Conguration:
Pump-Up Mode
In a pump-up mode, the R2 relay will initiate by switching the pump when the uid level in the tank falls below the lower
tank level switch point. The R2 relay will remain energized (latched) and the pump will continue to operate until uid lls
the tank up to the high level switch point. When the uid reaches the high level switch point, the control relay will deenergize and shut off the pump. The R2 relay will remain de-energized until the uid falls below the tank’s low level switch
point.
Pump-Down Mode
In a pump-down mode, the R2 relay will initiate by switching on the pump when the uid level in the tank reaches the upper
tank level switch point. The R2 relay will remain energized (latched) and the pump will continue to operate until uid in
the tank empties down to the low level switch point. When the uid falls below the low level switch point the R2 relay will
de-energize and shut off the pump. The R2 relay will remain de-energized until the uid reaches the tank’s high level switch
point.
Pump-Up
• Set both oat switches “Normally Closed”.
• Connect Upper oat switch to pins 5 and 6, Lower oat switch to pins 5 and 8.
• Jumper supply voltage from terminal 2 to terminal 1.
• Connect one end of the pump / valve to terminal 3 and other end to terminal 7.
• Connect input power to terminals 2 and 7.
Pump-Down
• Set both oat switches “Normally Open”.
• Connect Upper oat switch to pins 5 and 8, Lower oat switch to pins 5 and 6.
• Jumper supply voltage from terminal 2 to terminal 1.
• Connect one end of the pump / valve to terminal 3 and other end to terminal 7.
• Connect input power to terminals 2 and 7.
SWITCH ED
CONTACT
Input Power
R2-24…….24Vac
R2-120….120Vac
R2-220….220Vac
7
2
( NO )
3
4
( NC
Output Contacts
10 Amps @ 120vac
5 Amps @ 220vac
10Amps @ 30vdc
(1,3 or 1,4 )
Madison Company, Inc.
27 Business Park Drive
Branford, CT 06405
© 2018 Madison Company, Inc., MAD_MAN_MF-044_060518
203-488-4477 or 800-466-5383
ISO 9001 Certied
ECR #10900, Effective Date 8/2018, MF-044, Rev G
info@madisonco.com
www.madisonco.com
MADE IN THE USA

Installation and Maintenance
Sensing Solutions since 1959
R2 Controller
Installation Instructions
• Input power is connected between pins 2 and 7
• Wire the “Common Probe” to pin 5
• Wire the “Lower Probe” to pin 6
• Wire the “Upper Probe” to pin 8
R2 Controller
Conductivity Sensor Conguration
• Input power is connected between pins 2 and 7
• Wire the “Common Probe” to pin 5
• Wire the “Lower Probe” to pin 6
• Wire the “Upper Probe” to pin 8
Pins 1-3 and 1-4 are isolated switched contacts to switch power to a valve or pump
1
Input Power
R2-24…….24Vac
R2-120….120Vac
R2-220….220Vac
7
Output Contacts (1,3 or 1,4 )
10 Amps @ 120vac
5 Amps @ 220vac
10Amps @ 30vdc
SWITCHED
CONTACTS
( NO )
3
4
( NC )
2
Madison Company, Inc.
27 Business Park Drive
Branford, CT 06405
© 2018 Madison Company, Inc., MAD_MAN_MF-044_060518
UPPER
8
5
COMMON
PROBE
ISO 9001 Certied
ECR #10900, Effective Date 8/2018, MF-044, Rev G
6
LOWER
PROBE
PROBE
203-488-4477 or 800-466-5383
info@madisonco.com
www.madisonco.com
MADE IN THE USA