Madison R2 Installation And Maintenance Manual

Page 1
Installation and Maintenance
Sensing Solutions since 1959
1
5
86
R2 Controller
Installation Instructions
Set both float switches “Normally Closed.
•Connect Upper float switch to pins 5 and 6, Lower float switch to pins 5 and 8.
Jumper supply voltage from terminal 2 to terminal 1.
•Connect one end of the pump / valve to terminal 3 and other end to terminal 7.
•Connect input power to terminals 2 and 7.
Set both float switches “Normally Open.
•Connect Upper float switch to pins 5 and 8, Lower float switch to pins 5 and 6.
Jumper supply voltage from terminal 2 to terminal 1.
•Connect one end of the pump / valve to terminal 3 and other end to terminal 7.
•Connect input power to terminals 2 and 7.
ISO 9001 Certified
R2 Controller
Float Switch Conguration:
Pump-Up Mode
In a pump-up mode, the R2 relay will initiate by switching the pump when the uid level in the tank falls below the lower tank level switch point. The R2 relay will remain energized (latched) and the pump will continue to operate until uid lls the tank up to the high level switch point. When the uid reaches the high level switch point, the control relay will de­energize and shut off the pump. The R2 relay will remain de-energized until the uid falls below the tank’s low level switch
point.
Pump-Down Mode
In a pump-down mode, the R2 relay will initiate by switching on the pump when the uid level in the tank reaches the upper tank level switch point. The R2 relay will remain energized (latched) and the pump will continue to operate until uid in the tank empties down to the low level switch point. When the uid falls below the low level switch point the R2 relay will de-energize and shut off the pump. The R2 relay will remain de-energized until the uid reaches the tank’s high level switch
point.
Pump-Up
Set both oat switches “Normally Closed”.
Connect Upper oat switch to pins 5 and 6, Lower oat switch to pins 5 and 8.
Jumper supply voltage from terminal 2 to terminal 1.
Connect one end of the pump / valve to terminal 3 and other end to terminal 7.
Connect input power to terminals 2 and 7.
Pump-Down
Set both oat switches “Normally Open”.
Connect Upper oat switch to pins 5 and 8, Lower oat switch to pins 5 and 6.
Jumper supply voltage from terminal 2 to terminal 1.
Connect one end of the pump / valve to terminal 3 and other end to terminal 7.
Connect input power to terminals 2 and 7.
SWITCH ED CONTACT
Input Power R2-24…….24Vac R2-120….120Vac R2-220….220Vac
7
2
( NO )
3
4
( NC
Output Contacts 10 Amps @ 120vac 5 Amps @ 220vac 10Amps @ 30vdc
(1,3 or 1,4 )
Madison Company, Inc. 27 Business Park Drive Branford, CT 06405
© 2018 Madison Company, Inc., MAD_MAN_MF-044_060518
ISO 9001 Certied
ECR #10900, Effective Date 8/2018, MF-044, Rev G
info@madisonco.com
www.madisonco.com
MADE IN THE USA
Page 2
Installation and Maintenance
Sensing Solutions since 1959
R2 Controller
Installation Instructions
Input power is connected between pins 2 and 7
Wire the Common Probe to pin 5
Wire the Lower Probe to pin 6
Wire the Upper Probe to pin 8
R2 Controller
Conductivity Sensor Conguration
Input power is connected between pins 2 and 7
Wire the “Common Probe” to pin 5
Wire the “Lower Probe” to pin 6
Wire the “Upper Probe” to pin 8
Pins 1-3 and 1-4 are isolated switched contacts to switch power to a valve or pump
1
Input Power R2-24…….24Vac R2-120….120Vac R2-220….220Vac
7
Output Contacts (1,3 or 1,4 ) 10 Amps @ 120vac 5 Amps @ 220vac 10Amps @ 30vdc
SWITCHED CONTACTS
( NO )
3
4
( NC )
2
Madison Company, Inc. 27 Business Park Drive Branford, CT 06405
© 2018 Madison Company, Inc., MAD_MAN_MF-044_060518
UPPER
8
5
COMMON PROBE
ISO 9001 Certied
ECR #10900, Effective Date 8/2018, MF-044, Rev G
6
LOWER PROBE
PROBE
info@madisonco.com
www.madisonco.com
MADE IN THE USA
Loading...