FLAT 6
PACKING LIST
WHEN ORDERING PARTS, ALWAYS GIVE PART NUMBER AND DESCRIPTION.
Page 3
PL5
BLACK
PLASTIC CAP
REFLECTOR
(SEE FIG.
I-DRIVEN ELEMENT
GA
(SEE FIG. 4)
MATCH
1 st DIRECTOR
2nd DIRECTOR
(16’
6”)
3rd DIRECTOR
(16’ - 6”)
4th DIRECTOR
(16’
2”)
RED
PLASTIC CAF
GENERAL ASSEMBLY
FLATSTDER 6
2
Page 4
FLATSIDER
ASSEMBLY INSTRUCTIONS
FIGURE 1
GENERAL INSTRUCTIONS
This drawing depicts an overall view of what the antenna should look like upon completion of
assembly. Refer to Figures 2 thru4 for specific assembly details. All hardware should be coated with a silicon
rubber sealant or similar compound to insure that wind vibration does not cause it to work loose.
Upon completion of assembly, install the red plastic cap
on the director end of the antenna,
and the black cap (PL5) on the reflector end. This will allow you to determine at a glance the direction of
transmit and receive.
FIGURE 2BOOM
GUY ASSEMBLY
To assemble the boom, first mark the center of the boom coupler (T53) and slide the unslotted ends
of the center boom sections (T52P) over the each end of the coupler so that they butt in the center. Next attach
the boom-to-mast plate (POlP) and the vertical guy support
at the boom center using 2” U-bolts,
saddles and hardware as shown. (Refer to Detail 2A.)
Now, slide the swaged ends of the intermediate boom sections (T3
into the slotted ends of the
center boom sections. Secure with 2” U-bolts, saddle and hardware as shown. (Refer to Detail 2B.) Next,
slide the swaged ends of the boom sections and secure in the same manner. (Refer to Detail 2B.)
The first step in assembling the guy cable is to cut four lengths of 2 feet each off the roll of cable.
Take two 2 foot lengths and attach one end of each to an egg insulator
and the other end to an eyebolt
(N18) so that the distance between the eyebolt and the insulator is 1 foot. Attach both eyebolts to the vertical
guy support with
6”
as shown in detail 2C. Run the outside hex nuts only a couple of turns onto
the ends of the eyebolts and leave the inside nuts loose so that you can take the slack out of the cable later.
Now take two 2 foot lengths and attach an egg insulator to one end of each in the same manner. (At this point,
it is necessary to go on to element assembly and mounting, before completing the guy cable assembly.
Take both 2 foot cable lengths with the egg insulators attached and fasten one to the boom and the
driven element and the other at the 3rd director. Wrap as shown in Detail 2D so that the distance between
the boom and insulator is 1 ft.
Now take the remaining cable and allowing approximately 9” at each end for wrapping, stretch it
between the insulators one end of the boom and cut it off. Leaving as little slack as possible, wrap each end
of the cable around the insulators as shown in details 2C and 2D.
Do the same thing for the cable on the other end of the boom. Take the rest of the slack out of the
cables by tightening the outside hex nuts on the eyebolts. Lock them in place by tightening the inside hex
nuts. This antenna is designed for mounting on a 2” O.D. heavy duty mast. Mount using 2” U-bolts, saddles
and hardware as shown in Detail 2E.
FIGURE 3
Prior to assembling elements slide a boom-to-element mount (BE2P) onto each
determine dimensions for each element. Install a black plastic cap (PL2) onto both ends of each element.
ELEMENT ASSEMBLY
(6) element center sections
Assemble the
reflector elements in the same manner, sliding the fiberglass arms approximately 6 inches into the ends of the center
sections (TllP).
the reflector wire.
3
Snug the clamps but don’t tighten at this time because the arms will have to be adjusted after installing
FLATSIDER 6
Page 5
FIGURE 3BELEMENT MOUNTING
Mark each element at the center and be sure that the boom-to-element mounts
elements before tightening hardware.
bolts, saddles, boom-to-element mounts and hardware as shown. Refer to Figures 1
dimensions.
(At this point go back and complete the guy cable assembly.)
Starting 1” from the director end of the boom, mount each element using 2”
are centered on the
3B for element spacing
FIGURE 3C
The length of the reflector wire is very critical.
so.
The easy way to get the correct length for the reflector loop is as follows:
1.
Drive 2 nails in a board or fence
2. Stretch the wire around the nails by hand as tightly as possible and splice ends together. Solder the splice. Remove
one nail and remove the loop. Cut any excess wire off.
3.
Loosely assemble the machine screws (S2
onto the lugs of the fiberglass arms, adjusting the length as shown.
4. Tighten 3 of the 4 clamps that hold the fiberglass rods.
5. Install the wire as shown.
6.
Tighten the wire by pulling the fourth fiberglass rod until the wire is the same tightness as it was
around the nails. The wire loop is now the correct length. Note the total length of the loop is critical, and also is the
length of each side. REMEMBER: Reflector dimensions are only preliminary. Change to get equal sides of 9’
4” . Fiberglass length is not critical, however the equal wire length of 9’
7. Take the remaining reflector wire and thread it through the drill holes in the four spreaders pulling stung and splicing
each piece. This completes the reflector assembly.
FIGURE 4
Mount the gamma match (GO
attaching hardware as shown. Attach your 52 ohm coaxial cable to the connector (S42) and dress along boom and down
the mast.
REFLECTOR ASSEMBLY
the length of the loop apart --which is 22%l/2” between them.
flatwashers
GAMMA MATCH MOUNTING
to the horizontal driven element, using the gamma strap
It must be the correct length to operate correctly.
Pull the wire until it stretches an inch or
lo&washers
is very critical.
and hex nuts
Take the wire
and
ADJUSTING STANDING WAVE RATIO
Refer to Figure 4.
instructions cover the adjustment of one gamma match. To adjust the second gamma match, simply repeat this
procedure.
The gamma match has 2 adjustments.
a S W .R bridge to the coax between your transmitter and the antenna and check the S .W
loosen the clamp on the gamma match and the screws holding the slider (Gamma Straps
adjustment first in one direction then the other until a minimum S.W.R. reading is obtained. If S.W.R. is not yet
satisfactory, move the slider out 2” away from the boom.
position and then 2” toward the boom. Now readjust the capacitor for minimum S.W.R. you should now be able to
determine which direction to move the slider.
a satisfactory S.W.R. reading is obtained. Tighten all hardware. Disconnect the S.W.R. bridge and reconnect your
coaxial cable.
The dimensions given are approximate and should be used as a starting point. The following
First is the capacitor adjust and the second is the slider adjust. Connect
If adjustment is required
Next move the capacitor
reading has gone up, move the slider back to the original
Repeat the above procedure moving the slider in smaller increments until
6
Page 6
I
3P -VERTICAL
Y SUPPORT
PO1 P
TO-MAST PLATE
I
I
, SLOTTED
BOOM
SECTION
I
2” U-BOLT & SADDLE
NO2
I
I
(TYPICAL 4 PLACES)
HORIZONTAL ELEMENTS ONLY ARE SHOWN FOR REFERE
DRIVEN ELEMENT
I
I
I
I
I
I
I
I
I
NO1
4”
I
I
I
I
I
All
VERTICAL
GUY SUPPPPORT
GUY CABL
I
I
I
I
I
I
I
\
DETAIL
INSULATOR
__________
I
I
i
I
I
I
I
(TYPICAL 2 PLACES)
DETAIL
INSULATOR
BOOM-TOELEMENT MOUN
DETAIL 2D
-------------
COUPLER
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
A
(TYP 5 PLACES)
3rd DIRECTOR
OOM WITH BOOM-TO-
MAST PLATE ATTACH&
2”
O.D. MAST
(CUSTOMER FURNISHED)
DETAIL
N02.
a SADDLES
------
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
5
FLATSIDER 6
Page 7
CLAMP WITH
SCREW NUT
\
P
FIBERGLASS
ARM
SQ. NUT
A
DIMENSION
I
RI
TUBING
I
I
I
I
I
I
SO1
U-SOL-r 8 SADDLE
NUTS
I
>-------
WASHERS
VERTICAL ELEMENT MOUNTING
_____________-___-
I
0.
\
\
“A”-
ELEMENT ASSEMBLY (FIGURE 3A)
E
MOUNT
NO2
SADDLE
NUTS
HORIZON
WASHERS
AL ELEMENT MOUNTING
FIGURE
end of this instruction booklet before assembling elements.
--
VERTICAL
ELEMENT
ELEMENT SPACING
at the
I
I
I
I
I
I
\
I
I
I
I
I
I
I
I
I
4EQ
VERY
CRITICAL
P--
W
ENDS T
SOLDER)
ELEMENT ASSEMBLY
FLATSIDER 6
u-24
FLT WSHR
NUT
FIBERGLASS ARM
MOUNTING
REFLECTOR ASSEMBLY
(FIGURE
6
Page 8
* NOTE: THESE DIMENSONS ARE APPROXI-
MATE. REFER TO THE INSTRUCTIONS ON
ADJUSTINNG THE S.W.R. TO DETERMINE EXACT SETTINGS. THERE ARE 2 SEPARATE
GAMMA ADJUSTMENTS, 1. CAPACITOR ADJUSTMENT, 2. SLIDER POSITION.
DO NOT MOVE BOTH AT THE SAME TIME.
MOVE THE CAPACITOR FIRST, THEN, IF NECESSARY MOVE THE SLIDER, AND GO BACK TO