M2 Antenna Systems 235-11 Assembly Manual

M2 Antenna Systems, Inc.
Model No: 235-11
SPECIFICATIONS:
Model ......................................... 235-11
Frequency Range ....................... 230 To 240 MHz
Front to back .............................. 23 dB Typical
Beamwidth ............................... E=30 deg. H=35 deg.
Feed type ................................... “T” Match
Feed Impedance. ....................... 50 Ohms Unbalanced
Maximum VSWR ........................ 1.5:1 Max
Input Connector .......................... “N” Female
*Subtract 2.14 from dBi for dBd
Power Handling .......................... 1200W
Boom Length / Dia ...................... 141” / 1-1/2”
Maximum Element Length .......... 25-3/4”
Turning Radius: .......................... 80”
Stacking Distance ....................... 84” High & 80” Wide
Mast Size .................................... 1-1/2” to 2” Nom.
Wind area / Survival ................... 1.1 Sq. Ft. / 100 MPH
Weight / Ship Wt. ........................ 8 Lbs. / 13 Lbs.
FEATURES:
Performance has been computer optimized to meet your application. Physical construction
emphasizes long term electrical and mechanical durability. Elements are rod 5/16” 6061-T6 alumi­num, grounded to the boom. The driven element “T” Match uses a CNC machined central block with O-ring sealed connectors. Internal connections are encapsulated in a silicone gel with a dielectric strength 3.7 times greater than air for enhanced power handling. Balun connectors are triple O-ring sealed to the coax.
M2 Antenna Systems, Inc. 4402 N. Selland Ave. Fresno, CA 93722
Tel: (559) 432-8873 Fax: (559) 432-3059 Web: www.m2inc.com
©2015 M2 Antenna Systems Incorporated
09/30/15
Rev.00
235-11 ASSEMBLY MANUAL
TOOLS REQUIRED: Screwdriver, 11/32 wrench, socket or spintite, a 7/16" and 1/2" wrench or socket, tape measure. For best results please review instructions before assembly.
1. Assemble the boom (SEE DIMENSION SHEET).
2. Install the boom to mast plate with two 2” U-bolts and cradles, placing it at about 53” from the rear of the boom.
3. Layout the elements using dimension sheet and Install using 6-32 X 1” screws to hold elements in place. Note: Leave Driven Element Rod screw lose until shorting bars are positioned (SEE DRIVEN ELEMENT DETAIL PAGE).
4. Install Driven Element Assembly & Shorting Bars. (SEE DRIVEN ELEMENT DETAIL PAGE & DIMENSION SHEET).
5. Install the two gold SEAL NUTS on the Driven Element Balun connectors with the black neoprene face out. Locate the 1/2 wavelength balun cable assembly and form into a large "U" shaped loop. Tighten up the 7/16" balun connector nuts gently with a 7/16" end wrench first. Then run the seal nuts up against the face of the connectors and tighten about 1/2 turn more with a 1/2" end wrench. Tuck Balun into rear of boom and secure.
6. Install the feed line. Route feed line on the underside of boom towards Boom to Mast Plate and secure with nylon ties.
This completes the assembly.
M2 ANTENNA SYSTEMS, INC.
4402 N. Selland Ave.
Fresno, CA 93722
(559) 432-8873 FAX: 432-3059
www.m2inc.com Email: sales@m2inc.com
Loading...
+ 4 hidden pages