![](/html/88/8861/886131143a75797914944f2343ab9d9839d215badb3f6184a108347cacd72a0e/bg1.png)
www.luxorfurn.com
www.hwilson.com
Parts List
Note: Hardware provided is for drywall installation. If attaching
to other material fasteners are to be furnished by other.
A x8 B x8 C x8 D x8
Tools Required
- Tape Measure
- Chalk Line
- Drill
- 1/4˝ Drill Bit
05/01/13
- Extended Drive
Phillips
- Hammer
Slide tray into grove
on bottom of wall
board. Snap two
horizontal chalk
lines at the heights
indicated from the
oor. If attaching to
drywall drill eight
holes as specied.
1
⁄4˝
151⁄4˝
For 96˝ board
measure in 151⁄4˝
from each edge to
rst hole. All other
instructions and
measurements are
the same.
Insert drywall anchors
21 3 4 5
B into holes then attach
brackets A at the bottom
with screw C making
sure the bracket is in the
lowest position.
1
⁄2˝
3
32˝ 32˝
Attach brackets A at the top
with screw C making sure
the bracket is in the highest
position. Tighten screw just
enough so that the bracket
can be tapped down with
hammer.
Place white board on
lower brackets making
sure to center it with
middle lower bracket
A. Attach bracket to
wallboard using screw D
starting with the middle
lower bracket.
Drill Holes
Tap the top brackets
down so they are
touching the top of
the board. Attach
bracket to wallboard
using screw D.
1
⁄2˝
3
Chalk Line
743⁄4˝ from oor
96˝ Board
71˝
96˝ Board
Drill Holes
Chalk Line
1
⁄4˝ from oor
37
1
3
⁄2˝
16˝ 16˝ 16˝ 16˝
1
3
⁄2˝