Lochinvar 1002, 1302, 1501, 2001, 1701 User Manual

...
Page 1
Installation & Operation Manual
Models: 502, 752, 1002, 1302,
1501, 1701, and 2001
Up To 5:1 Turndown
This manual supplies information for the installation, operation, and servicing of the appliance. It is strongly recommended that this manual and the Power-fin Service Manual be reviewed completely before proceeding with an installation. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage.
WARNING:
Save this manual for future reference.
PBX-PFX-I&O Rev E
Page 2
2
Hazard definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Please read before proceeding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Ratings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
The Power-fin -- How it works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1. Determine unit location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2. Venting - Before You Begin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Condensing vent options: CAT II & IV . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Non-Condensing vent options: CAT I . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Common venting CAT I & II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
CAT I, II, & IV general venting information . . . . . . . . . . . . . . . . . . . . . . . . 22
CAT IV specific venting information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
CAT II & IV drain tee requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
CAT I specific venting information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Vertical air inlet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Horizontal air inlet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Vertical vent termination clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Sidewall vent termination clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3. Gas connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
4. Water connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
5. Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
6. Condensate disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
7. Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
8. Operating information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
9. Domestic water heaters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
10. Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
11. Wiring diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
12. Ladder diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Revision Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Back Cover
Hazard definitions
The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product.
DANGER
WARNING
CAUTION
CAUTION
NOTICE
DANGER indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury.
WARNING indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.
CAUTION indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury.
CAUTION used without the safety alert symbol indicates a potentially hazardous situation which, if not avoided, may result in property damage.
NOTICE indicates special instructions on installation, operation, or maintenance that are important but not related to personal injury or property damage.
Contents
Page 3
Please read before proceeding
NOTICE
This is a gas appliance and should be installed by a licensed electrician and/or certified gas supplier. Service must be performed by a qualified service installer, service agency or the gas supplier.
WARNING
If the information in these instructions is not followed exactly, a fire or explosion may result causing property damage, personal injury, or death.
This appliance MUST NOT be installed in any location where gasoline or flammable vapors are likely to be present, unless the installation is such to eliminate the probable ignition of gasoline or flammable vapors.
What to do if you smell gas –
• Do not try to light any appliance.
• Do not touch any electric switch; do not use any phone in your building.
• Immediately call your gas supplier from a neighbors phone. Follow the gas supplier’s instructions.
• If you cannot reach your gas supplier, call the fire department.
Installation and service must be performed by a qualified installer, service agency, or the gas supplier.
Warranty –
Factory warranty (shipped with unit) does not apply to units improperly installed or improperly operated.
Experience has shown that improper installation or system design, rather than faulty equipment, is the cause of most operating problems.
1. Excessive water hardness causing a lime/scale build-up in
the copper tube is not the fault of the equipment and is not covered under the manufacturer’s warranty (see Water Treatment and Water Chemistry).
2. Excessive pitting and erosion on the inside of the copper
tube may be caused by too much water velocity through the tubes and is not covered by the manufacturer’s warranty (see Boiler Flow Rates and Temperature Rise for flow requirements).
Checking equipment –
Upon receiving equipment, check for signs of shipping damage. Pay particular attention to parts accompanying the appliances which may show signs of being hit or otherwise being mishandled. Verify total number of pieces shown on packing slip with those actually received. In case there is damage or a shortage, immediately notify the carrier.
Do not use this appliance if any part has been under water. The possible damage to a flooded appliance can be extensive and present numerous safety hazards. Any appliance that has been under water must be replaced.
WARNING
Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. Refer to this manual for assistance or additional information, consult a qualified installer, service agency or the gas supplier.
Owner warning –
The information contained in this manual is intended for use by qualified professional installers, service technicians, or gas suppliers. Consult your local expert for proper installation
or service procedures.
NOTICE
Consult and follow all local Building and Fire Regulations and other Safety Codes that apply to this installation. Consult local gas utility company to authorize and inspect all gas and flue connections.
A gas appliance that draws combustion air from the equipment room where it is installed must have a supply of fresh air circulating around it during burner operation for proper gas combustion and proper venting.
WARNING
Should overheating occur or the gas supply fail to shut off, do not turn off or disconnect the electrical supply to the pump. Instead, shut off the gas supply at a location external to the appliance.
Prevention of freezing –
Heat exchangers and headers damaged by freezing are not covered by warranty.
See Section 7, Startup - Freeze Protection for more information.
3
Installation & Operation Manual
Page 4
Installation & Operation Manual
4
Please read before proceeding
WARNING
To minimize the possibility of serious personal injury, fire, or damage to your appliance, never violate the following safety rules:
1. Boilers and water heaters are heat producing appliances. To avoid damage or injury, do not store materials against the appliance or the vent-air intake system. Use proper care to avoid unnecessary contact (especially children) with the appliance and vent-air intake components.
2. Never cover your appliance, lean anything against it, store trash or debris near it, stand on it or in any way block the flow of fresh air to your appliance.
3. UNDER NO CIRCUMSTANCES must flammable materials such as gasoline or paint thinner be used or stored in the vicinity of this appliance, vent-air intake system or any location from which fumes could reach the appliance or vent-air intake system.
Codes –
The equipment shall be installed in accordance with those installation regulations in force in the local area where the installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made. In the absence of such requirements, the installation shall conform to the latest edition of the National Fuel Gas Code, ANSI Z223.1. Where required by the authority having jurisdiction, the installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, ASME CSD-1. All boilers conform to the latest edition of the ASME Boiler and Pressure Vessel Code, Section IV. Where required by the authority having jurisdiction, the installation must comply with the Canadian Gas Association Code, CAN/CGA-B149.1 and/or B149.2 and/or local codes. This appliance meets the safe lighting performance criteria with the gas manifold and control assembly provided, as specified in the ANSI standards for gas­fired hot water boilers, ANSI Z21.13 and gas water heaters, ANSI Z21.10.3.
Page 5
Installation & Operation Manual
5
Ratings
Notes:
1. The ratings are based on standard test procedures prescribed by the United States Department of Energy.
2. Net I=B=R ratings are based on net installed radiation of sufficient quantity for the requirements of the building and nothing need be added for normal piping and pickup. Ratings are based on a piping and pickup allowance of 1.15.
Maximum allowed working pressure is located on the rating plate.
NOTICE
3. Power-fins require special gas venting. Use only the vent materials and methods specified in the Power-fin Installation and Operation Manual.
4. The Power-fin is equipped for operation up to 2000 feet, and including up to 4000 feet, with no field adjustments. The appliance output ratings up to 4000 feet shall be reduced by 4% for each 1000 feet above sea level. For operation above 4000 feet, consult the factory.
Power-fin
I=B=R Rating
Model Number
B = Boiler
F = Water Heater
Note: Change “N” to
“L” for L.P. gas models.
Input MBH
(Note 4)
Min Max
Gross
Output
MBH
(Note 1)
Net
I=B=R
Ratings
Water,
MBH
(Note 2)
P(B/F)N0502-M9 100 500 425 370
P(B/F)N0752-M9 150 750 637 554
P(B/F)N1002-M9 200 1000 850 739
P(B/F)N1302-M9 260 1300 1105 961
P(B/F)N0502-F9 N/A 500 425 370
P(B/F)N0752-F9 N/A 750 637 554
P(B/F)N1002-F9 N/A 1000 850 739
P(B/F)N1302-F9 N/A 1300 1105 961
P(B/F)N1501-M9 300 1500 1275 1109
P(B/F)N1701-M9 340 1700 1445 1257
P(B/F)N2001-M9 440 2000 1700 1478
P(B/F)N1501-B9 900 1500 1260 1096
P(B/F)N1701-B9 1020 1700 1428 1242
P(B/F)N2001-B9 1200 2000 1680 1461
Other Specifications
Appliance
Water Content Gallons
Water
Connections
Gas
Connections
Air / Vent
Sizes
(Note 3)
3.50 2.5" 1" 5" - 4"
4.00 2.5" 1 1/4" 5" - 5"
4.50 2.5" 1 1/4" 6" - 6"
5.00 2.5" 1 1/4" 6" - 8"
3.50 2.5" 1" 5" - 7"
4.00 2.5" 1 1/4" 5" - 9"
4.50 2.5" 1 1/4" 6" - 10"
5.00 2.5" 1 1/4" 6" - 12"
5.50 2.5" 1 1/2" 6" - 6"
5.75 2.5" 1 1/2" 7" - 7"
6.13 2.5" 1 1/2" 8" - 8"
5.50 2.5" 1 1/2" 6" - 12"
5.75 2.5" 1 1/2" 7" - 14"
6.13 2.5" 1 1/2" 8" - 14"
Page 6
The Power-fin - How it works...
1. Heat exchanger
The heat exchanger allows system water to flow through specially designed tubes for maximum heat transfer. The glass lined headers and copper finned tubing are encased in a jacket that contains the combustion process.
2. Heat exchanger access cover
The heat exchanger access cover is a stainless steel door which allows access for service, maintenance, and removal of the heat exchanger from inside the combustion chamber.
3. Blower
The blower pulls in air and gas through the venturi (see item 5) and injects the fuel/air mixture into the burner, where they burn inside the combustion chamber.
4. Gas valve
The gas valve allows the proper amount of gas to pass into the burner for combustion. The gas valve on the Power-fin works under a negative pressure so gas should only be pulled through the valve when the blower is in operation.
5. Venturi
The venturi attaches to the inlet (or suction) side of the blower and generates the negative pressure needed by the gas valve.
6. Flue sensor (not shown)
The flue sensor is mounted in the exhaust collar of the unit and monitors the flue gas temperature. If the temperature in the stack exceeds the maximum temperature the unit will shut down to prevent a hazardous condition. In Category I models the flue sensor helps to control the amount of modulation to prevent condensation in the stack.
7. Outlet temperature sensor
This sensor monitors the outlet water temperature. If selected as the controlling sensor, the appliance will maintain set point by adjusting the firing rate of the unit according to this sensor.
8. Inlet temperature sensor
This sensor monitors inlet water temperature. If selected as the controlling sensor, the appliance will maintain set point by adjusting the firing rate of the unit according to this sensor.
9. Temperature and pressure gauge
The temperature and pressure gauge monitors the outlet temperature of the appliance as well as the system water pressure.
10. Electronic display
The electronic display consists of 7 buttons and a dual line 32-character liquid crystal display used to monitor the operation of the heater as well as enter and view the programming of the main control board.
11. Burner (not shown)
The burner is made of a woven fabric over steel screen construction. The burner uses pre-mixed air and gas and provides a wide range of firing rates.
12. Water outlet (system supply)
The water outlet is a 2 1/2" pipe connection that supplies water to the system with connections for a flow switch (see #28), a relief valve (see #25), and a temperature and pressure gauge (boilers only) (see #9).
13. Water inlet (system return)
The water inlet is a 2 1/2" pipe connection that receives water from the system and delivers it to the heat exchanger.
14. Gas connection pipe
The gas pipe connection on this appliance is 1", 1 1/4", or 1 1/2" NPT. To deliver the correct amount of gas volume to the appliance it may be necessary to have a larger gas line reduced to 1 1/4" at the appliance. Please reference the National Fuel Gas Code charts for more details.
15. SMART SYSTEM Control Module
The SMART System Control Module is the main control for the appliance. This module contains the programming that operates the blower, gas valve, and pumps in addition to other programmable features.
16. Air intake
The air intake pipe allows fresh air to flow directly to the appliance. The air inlet is part of the filter box assembly where air filtration is accomplished with a standard filter.
17. Line voltage terminal strip
The line voltage terminal strip provides a location to connect all of the line voltage (120 VAC) contact points to the unit.
18. Low voltage connection board
The low voltage connection board provides a location to tie in all of the low voltage contacts to the appliance. This is where most of the external safety devices are connected to the unit such as the louver proving switch.
19. Condensate trap
The condensate trap is designed to prevent flue gases from escaping the appliance through the combustion chamber drain.
20. Access cover - front
The front access cover provides access to the gas train as well as the blower and other key components for service and maintenance.
21. Hot surface igniter (HSI)
The hot surface igniter is a device that is used to ignite the air/gas mixture as well as monitor the performance of the flame during operation. This device acts as a flame sense electrode.
22. Flame inspection window (sight glass) (not shown on Models 502 - 1302)
The flame inspection window is a quartz glass window that allows a visual inspection of the burner and flame during operation.
23. Gas shut off valve (downstream test cock)
The downstream test cock is provided in the gas train to ensure complete shut off of the gas to the burner in case of maintenance, inspection, or testing of the valve.
24. High limit sensor
Device that monitors the outlet water temperature to ensure safe operation. If the temperature exceeds its setting (field adjustable), it will break the control circuit, shutting the appliance down.
25. Relief valve
The relief valve is a safety device that ensures the maximum pressure of the appliance is not exceeded. Boilers operate on pressure only and are shipped from the factory at a rating of 50 PSI. Water heaters operate on temperature and pressure and are shipped standard as 150 PSI and 210°F (98.9°C).
26. Power switch
The power switch is used to engage and disengage power to the appliance on the 120 VAC circuit.
27. Air pressure switch - low
The air pressure switch is a safety device which ensures proper blower operation. The air pressure switch is wired in series with the low voltage control circuit in such a way that if the fan does not engage or shuts down prematurely the device will break the control circuit and the unit will shut down.
28. Air pressure switch - high
This pressure switch is only monitored during startup and serves to ensure the blower is providing higher air flows required for purging.
6
Installation & Operation Manual
Page 7
29. Flow switch
The flow switch is a safety device that ensures flow through the heat exchanger during operation. This appliance is low mass and should never be operated without flow. The flow switch makes contact when flow is detected and allows the unit to operate. If flow is discontinued during operation for any reason the flow switch will break the control circuit and the unit will shut down.
30. Drain port(s)
Location from which the heat exchanger can be drained.
31. Ventilation fan
Provides air circulation around the controls inside the unit.
32. Manual shutoff valve
Manual valve used to isolate the unit from the gas supply.
Models 502 - 1302 Front View
28
Models 502 - 1302 Left Side (inside unit) - F9
Models 502 - 1302 Right Side (inside unit) - M9
Models 502 - 1302 Rear View
7
The Power-fin - How it works... (continued)
Installation & Operation Manual
31
32
29
30
Page 8
Installation & Operation Manual
8
The Power-fin - How it works...
Models 1501 - 2001 Left Side (inside unit)
Models 1501 - 2001 Right Side (inside unit)
Models 1501 - 2001 Rear View
Models 1501 - 2001 Front View
31
32
29
28
30
Page 9
Installation & Operation Manual
9
1 Determine unit location
NOTICE
Clearances from combustible construction are noted on the appliance rating plate.
Location of unit
1. Locate the appliance so that if water connections should leak, water damage will not occur. When such locations cannot be avoided, it is recommended that a suitable drain pan, adequately drained, be installed under the unit. The pan must not restrict combustion airflow. Under no circumstances is the manufacturer to be held responsible for water damage in connection with this unit, or any of its components.
2. The appliance must be installed so that the ignition system components are protected from water (dripping, spraying, rain, etc.,) during appliance operation and service (circulator replacement, control replacement, etc.,).
3. Appliances located in a residential garage and in adjacent spaces that open to the garage and are not part of the living space of a dwelling unit must be installed so that all burners and burner ignition devices have a minimum clearance of not less than 18" (46 cm) above the floor. The appliance must be located or protected so that it is not subject to physical damage by a moving vehicle.
4. DO NOT install this appliance in any location where gasoline or flammable vapors are likely to be present.
5. The appliance must be installed on a level floor. Combustible floor locations may be used. Maintain required clearances from combustible surfaces.
6. The appliance must not be installed on carpet.
7. The appliance must be installed indoors where it is protected from exposure to wind, rain, and weather.
8. This appliance may condense the products of combustion when operating at water temperatures below 140°F (60°C). Ensure that the appliance is located near an acceptable drain where condensate that may form in the venting system may be properly collected and disposed.
9. Access to rear of appliance MUST be maintained.
Figure 1-1_Recommended Service Clearances
Recommended service clearances
TABLE - 1A
CLEARANCES FROM COMBUSTIBLE CONSTRUCTION
Location Clearances
Right Side 0"
Rear
6" (15cm) (Minimum 24" (0.61m) suggested for service to pump and components)
Left Side 0"
Front - Alcove* (Minimum 24" (0.61m) suggested for service)
To p
6" (15cm) (Minimum 24" (0.61m) suggested for service)
Flue 2" (51mm)
Hot Water Pipes 1" (25.4mm)
*An Alcove is a closet without a door.
Page 10
Installation & Operation Manual
10
1 Determine unit location
Figure 1-2_Combustion Air Direct from Outside
Combustion and ventilation air requirements for appliances drawing air from the equipment room
Provisions for combustion and ventilation air must be in accordance with Air for Combustion and Ventilation, of the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment, or applicable provisions of the local building codes.
The equipment room MUST be provided with properly sized openings to assure adequate combustion air and proper ventilation.
Maintain minimum specified clearances for adequate operation. All installations must allow sufficient space for servicing the vent connections, water pipe connections, piping and other auxiliary equipment, as well as the appliance. The clearance labels on each appliance note the same service and combustible clearance requirements as shown above.
Multiple appliances may be installed in a modular boiler or water heater installation. Multiple appliances may be installed side by side with no clearance between adjacent appliances because this appliance is approved for zero clearance from combustible surfaces and no service access is required from the sides.
Consult the Ve nt i ng section of this manual for specific installation instructions for the appropriate type of venting system that you will be using. Direct Vent and DirectAire venting systems require installation with Category IV flue pipe, sealed air inlet pipe, and air inlet caps, which must meet the manufacturer’s specifications.
1. If air is taken directly from outside the building with no duct, provide two permanent openings to the equipment room (see FIG. 1-2):
(a) Combustion air opening, with a minimum free
area of one square inch per 4000 Btu/hr input (5.5 cm
2
per kW). This opening must be located within 12" (30 cm) of the bottom of the enclosure.
(b) Ventilation air opening, with a minimum free
area of one square inch per 4000 Btu/hr input (5.5 cm
2
per kW). This opening must be located within 12" (30 cm) of the top of the enclosure.
Figure 1-3_Combustion Air Through Ducts
Page 11
Installation & Operation Manual
1 Determine unit location (continued)
11
2. If combustion and ventilation air is taken from the outdoors using a duct to deliver the air to the equipment room, each of the two openings should be sized based on a minimum free area of one square inch per 2000 Btu/hr (11 cm
2
per kW) of input (see FIG. 1-3).
Figure 1-5_Combustion Air from Outside - Single Opening
3. If air is taken from another interior space, each of the two openings specified above should have a net free area of one square inch for each 1000 Btu/hr (22 cm
2
per kW) of input, but not less than 100 square inches (645 cm
2
) (see FIG. 1-4).
4. If a single combustion air opening is provided to bring combustion air in directly from the outdoors, the opening must be sized based on a minimum free area of one square inch per 3000 Btu/hr (7 cm
2
per kW). This opening must be located within 12" (30 cm) of the top of the enclosure (see FIG. 1-5).
Figure 1-4_Combustion Air from Interior Space
TABLE - 1B
MINIMUM RECOMMENDED COMBUSTION
AIR SUPPLY TO EQUIPMENT ROOM
Model
Number
*Outside Air from
2 Openings Directly from
Outdoors
*Outside Air from 1 Opening Directly from Outdoors, in
2
Inside Air from
2 Ducts Delivered from
Outdoors
Inside Air from
2 Ducts Delivered from Interior
Space
To p
Opening, in
2
Bottom
Opening, in
2
To p
Opening, in
2
Bottom
Opening, in
2
To p
Opening, in
2
Bottom
Opening, in
2
502
125
(807 cm2)
125
(807 cm2)
167
(1077 cm2)
250
(1613 cm2)
250
(1613 cm2)
500
(3226 cm2)
500
(3226 cm2)
752
188
(1213 cm2)
188
(1213 cm2)
250
(1613 cm2)
375
(2420 cm2)
375
(2420 cm2)
750
(4839 cm2)
750
(4839 cm2)
1002
250
(1613 cm2)
250
(1613 cm2)
333
(2149 cm2)
500
(3226 cm2)
500
(3226 cm2)
1000
(6452 cm2)
1000
(6452 cm2)
1302
325
(2097 cm2)
325
(2097 cm2)
433
(2794 cm2)
650
(4194 cm2)
650
(4194 cm2)
1300
(8388 cm2)
1300
(8388 cm2)
1501
375
(2420 cm2)
375
(2420 cm2)
500
(3226 cm
2
)
750
(4839 cm2)
750
(4839 cm2)
1500
(9678 cm2)
1500
(9678 cm2)
1701
425
(2742 cm2)
425
(2742 cm2)
567
(3658 cm2)
850
(5484 cm2)
850
(5484 cm2)
1700
(10968 cm2)
1700
(10968 cm2)
2001
500
(3226 cm2)
500
(3226 cm2)
667
(4303 cm2)
1000
(6452 cm2)
1000
(6452 cm2)
2000
(12904 cm2)
2000
(12904 cm2)
*Outside air openings shall directly communicate with the outdoors. When combustion air is drawn from the outside through a duct, the net free area of each of the two openings must have twice (2 times) the free area required for Outside Air/2 Openings. The above requirements are for the boiler only; additional gas fired appliances in the equipment room will require an increase in the net free area to supply adequate combustion air for all appliances.
Page 12
Installation & Operation Manual
12
1 Determine unit location
The result is improper combustion and a non-warrantable, premature appliance failure.
EXHAUST FANS: Any fan or equipment which exhausts air from the equipment room may deplete the combustion air supply and/or cause a downdraft in the venting system. Spillage of flue products from the venting system into an occupied living space can cause a very hazardous condition that must be immediately corrected. If a fan is used to supply combustion air to the equipment room, the installer must make sure that it does not cause drafts which could lead to nuisance operational problems with the appliance.
Figure 1-6_Filter Access
Combustion air requirements are based on the latest edition of the National Fuel Gas Code, ANSI Z223.1; in Canada refer to the latest edition of CGA Standard CAN B149.1 or B149.2. Check all local code requirements for combustion air.
All dimensions based on net free area in square inches. Metal louvers or screens reduce the free area of a combustion air opening a minimum of approximately 25%. Check with louver manufacturers for exact net free area of louvers. Where two openings are provided, one must be within 12" (30cm) of the ceiling and one must be within 12" (30cm) of the floor of the equipment room. Each opening must have net free area as specified in the chart on page 11 (Table 1B). Single openings shall commence within 12" (30cm) of the ceiling.
CAUTION
Under no circumstances should the equipment room ever be under negative pressure. Particular care should be taken where exhaust fans, attic fans, clothes dryers, compressors, air handling units, etc., may take away air from the unit.
The combustion air supply must be completely free of any flammable vapors that may ignite or chemical fumes which may be corrosive to the appliance. Common corrosive chemical fumes which must be avoided are fluorocarbons and other halogenated compounds, most commonly present as refrigerants or solvents, such as Freon, trichlorethylene, perchlorethylene, chlorine, etc. These chemicals, when burned, form acids which quickly attack the heat exchanger finned tubes, headers, flue collectors, and the vent system.
Combustion air filter
This unit has a standard air filter located at the combustion air inlet as shown above in FIG. 1-6. This air filter is provided to help ensure clean air is used for the combustion process. Check this filter every month and replace when it becomes dirty. The filter size on Models 502 -1302 is 16" x 12" x 1" (40.6cm x 30.5cm x 2.5cm) and for Models 1501 - 2001 it’s 16" x 16" x 1" (40.6cm x 40.6cm x 2.5cm). You can find these commercially available filters at any home center or HVAC supply store. Follow the steps below when replacing the combustion air filter:
1. Locate the combustion air filter box mounted on the rear of the appliance.
2. Locate the flat thumb bolt at the top of the air filter box and turn it a 1/4 turn counterclockwise to align it with the slot in the air filter box.
3. Lift and remove the air filter box cover to gain access to the air filter.
4. Slide the air filter out the top of the air filter box.
5. Inspect the air filter for dirt and debris, replace if necessary.
6. Replace the air filter and the air filter box cover. Turn the thumb bolt clockwise a 1/4 turn to secure the air filter box cover to the air filter box.
CAUTION
During construction the air filter should be checked more frequently to ensure it does not become clogged with combustion dirt and debris.
NOTICE
Sustained operation of an appliance with a clogged burner may result in nuisance operational problems, bad combustion, and non-warrantable component failures.
Page 13
Installation & Operation Manual
13
2 Venting
BEFORE YOU BEGIN
Identify your appliance’s vent system:
This manual covers venting requirements for CAT II/IV and CAT I models. Be sure to correctly identify the type of vent system your appliance requires before proceeding.
Category II/IV Models: See page 15
Water PFN0502PM-M9 Heaters PFN0752PM-M9
PFN1002PM-M9 PFN1302PM-M9 PFN1501PM-M9 PFN1701PM-M9 PFN2001PM-M9
Boilers PBN0502-M9
PBN0752-M9 PBN1002-M9 PBN1302-M9 PBN1501-M9 PBN1701-M9 PBN2001-M9
A
D
B C
E F
CAT II requires vent increaser kit.
Venting options:
Category I Models: See page 19
Water PFN0502PM-F9 Heaters PFN0752PM-F9
PFN1002PM-F9 PFN1302PM-F9 PFN1501PM-B9(*) PFN1701PM-B9(*) PFN2001PM-B9(*)
Boilers PBN0502-F9
PBN0752-F9 PBN1002-F9 PBN1302-F9 PBN1501-B9(*) PBN1701-B9(*) PBN2001-B9(*)
G H I
Venting options:
DANGER
Failure to use correct venting materials can result in loss of life from flue gas spillage into working or living space.
Venting Category Definitions: (Reference National Fuel Gas Code ANSI Z223.1)
CAT IV: Positive pressure condensing
An appliance that operates with a positive vent static pressure with a vent gas temperature that may cause excessive condensate production in the vent.
CAT II: Negative pressure condensing
An appliance that operates with a non-positive vent static pressure with a vent gas temperature that may cause excessive condensate production in the vent.
CAT I: Negative pressure non-condensing
An appliance that operates with a non-positive vent static pressure with a vent gas temperature that avoids excessive condensate production in the vent.
*CAT I “B9” models require field supplied barometric dampers.
NOTICE
Category II venting is required when common venting multiple M9 models .
Page 14
Installation & Operation Manual
14
2 Venting
Vent Materials:
Category II/IV Vent Material Suppliers:
Category II/IV flue pipe materials and vent adapters (see FIG. 2-1) can be obtained from the following manufacturers:
Heat-Fab Inc., Saf-T CI Vent with AL29-4C stainless steel
Protech Systems Inc., Fas N Seal Vent with AL29-4C stainless steel
Flex-L International Inc., StaR 34 Vent with AL29-4C stainless steel
Metal-Fab Inc., Corr/Guard Vent with AL29-4C stainless steel
Z-Flex, Z-Vent with AL29-4C stainless steel
Or other listed Category IV vent systems suitable for a condensing, positive pressure, gas fired appliance.
A Category IV flue MUST have all vent joints and seams sealed gastight and have provisions for a drain to properly collect and dispose of condensate that may occur in the venting system.
Figure 2-1_Category IV Vent Adapter
Figure 2-2_Category IV to II Conversion Kit
TABLE - 2A
FLUE ADAPTER SIZES
MODEL FLUE ADAPTER SIZE
PB/FN0502-M9 4"
PB/FN0752-M9 5"
PB/FN1002-M9 6"
PB/FN1302-M9 8"
PB/FN1501-M9 6"
PB/FN1701-M9 7"
PB/FN2001-M9 8"
TABLE - 2B
CATEGORY IV TO CATEGORY II
CONVERSION KITS
MODEL FLUE SIZE KIT NUMBER
PB/FN0502-M9 4" to 7" KIT3131
PB/FN0752-M9 5" to 9" KIT3132
PB/FN1002-M9 6" to 10" KIT3133
PB/FN1302-M9 8" to 12" KIT3134
PB/FN1501-M9 6" to 8" KIT3106
PB/FN1701-M9 7" to 9" KIT3107
PB/FN2001-M9 8" to 10" KIT3108
Category I Vent Material Suppliers:
Category I venting materials are readily available from your local plumbing/HVAC supply houses.
*Note: The manufacturer of the selected vent material can also provide a vent adapter to connect the vent material to the Power-fin’s vent connection.
*
Increaser
Connector
Page 15
Installation & Operation Manual
2 Venting (continued)
15
Condensing Vent Options: CAT II & IV (CAT II vent options A, B, & C requires an adapter kit - see page 14)
A
CAT II requires an adapter kit.
See page 14.
Vertical vent with combustion air from equipment room - see page 16.
CAT II/IV
D
Sidewall termination with combustion air from equipment room - see page 17.
CAT IV
B
CAT II requires an adapter kit.
See page 14.
Vertical Direct Vent installation with rooftop combustion air inlet - see page 16.
CAT II/IV
E
Horizontal Direct Vent installation with sidewall combustion air inlet - see page 18.
CAT IV
C
CAT II requires an adapter kit.
See page 14.
Vertical DirectAire installation with sidewall combustion air inlet - see page 17.
CAT II/IV
F
Horizontal DirectAire installation with vertical combustion air inlet - see page 18.
CAT IV
Page 16
Installation & Operation Manual
16
2 Venting
A
CAT II requires an adapter kit.
See page 14.
CAT II/IV
Vertical vent with combustion air from equipment room - see page 15.
The flue outlet terminates on the rooftop.
The termination point for the flue products must follow the vertical vent termination clearance requirements on pages 27 and 28. These units can be identified by the Category IV and the control number M9 as noted on the unit’s rating plate.
The flue from this Category IV appliance must have all vent joints and seams sealed gastight. A Category IV vent system has specific vent material and installation requirements.
The flue products in the vent system may be cooled below their dew point and form condensate in the flue. The materials used for a Category IV vent must be resistant to any corrosive damage from flue gas condensate. The flue from a Category IV vent system must have a condensate drain with provisions to properly collect and dispose of any condensate that may occur in the venting system.
Follow all requirements in the General Venting and Category IV General Venting sections for proper installation and for venting flue products to the outdoors with a vertical termination (see pages 22 and 23).
Condensing vent options: CAT II & IV (CAT II vent options A, B, & C requires an adapter kit - see page 14)
TABLE - 2C
VENT TERMINATION SIZES
MODEL
CAT II
VENT SIZE
CAT IV
VENT SIZE
MODEL
CAT II
VENT SIZE
CAT IV
VENT SIZE
PB/FN0502-M9 7" 4" PB/FN1501-M9 8" 6"
PB/FN0752-M9 9" 5" PB/FN1701-M9 9" 7"
PB/FN1002-M9 10" 6" PB/FN2001-M9 10" 8"
PB/FN1302-M9 12" 8"
-- -- --
B
CAT II requires an adapter kit.
See page 14.
CAT II/IV
Vertical direct vent installation with rooftop combustion air inlet - see page 15.
The Vertical Direct Vent system is installed with a Category IV flue and a separate combustion air pipe to the outdoors. The flue outlet and combustion air intake must both terminate on the rooftop.
The termination point for the flue products must follow the vertical vent termination clearance requirements on pages 27 and 28. These units can be identified by the Category IV and the control number M9 as noted on the unit’s rating plate.
The optional Direct Vent system requires the installation of specific venting materials that are purchased locally.
Follow all requirements in the General Venting and Category IV General Venting sections for proper installation and for venting flue products to the outdoors with a vertical termination (see pages 22 and 23).
The Vertical Direct Vent system requires the installation of an additional pipe to supply combustion air from outdoors directly to the appliance. Follow all requirements under the Combustion Air Inlet section on pages 25 and 26.
TABLE - 2D
AIR & VENT TERMINATION SIZES
MODEL
CAT II CAT IV
MODEL
CAT II CAT IV
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
PB/FN0502-M9 5" 7" 5" 4" PB/FN1501-M9 6" 8" 6" 6"
PB/FN0752-M9 5" 9" 5" 5" PB/FN1701-M9 7" 9" 7" 7"
PB/FN1002-M9 6" 10" 6" 6" PB/FN2001-M9 8" 10" 8" 8"
PB/FN1302-M9 6" 12" 6" 8"
-- -- -- -- --
Page 17
Installation & Operation Manual
2 Venting (continued)
17
Condensing vent options: CAT II & IV (CAT II vent options A, B, & C requires an adapter kit - see page 14)
C
CAT II requires an adapter kit.
See page 14.
CAT II/IV
DirectAire Vertical installation with sidewall combustion air inlet - see page 15.
The DirectAire Vertical with a Sidewall Combustion Air Vent system terminates the flue at the rooftop and air inlet at the sidewall. The flue outlet and combustion air intake terminate in different pressure zones.
The optional DirectAire vent system requires the installation of specific venting materials that are purchased locally.
The termination point for the flue products must follow the vertical vent termination clearance requirements on pages 27 and 28. These units can be identified by the Category IV and the control number M9 as noted on the unit’s rating plate.
Follow all requirements in the General Venting and Category IV General Venting sections for proper installation and for venting flue products to the outdoors with a vertical termination (see pages 22 and 23).
The DirectAire Vertical system requires the installation of an additional pipe to supply combustion air from outdoors directly to the appliance. Follow all requirements under the Combustion Air Inlet section on pages 25 and
26.
Sidewall combustion air inlet: The air inlet cap for the sidewall air inlet must be purchased from the appliance manufacturer.
The part numbers for the required sidewall air inlet cap kit are listed by model. Each kit includes the special combustion air inlet cap for installation on an exterior sidewall. The sidewall air inlet cap supplied in the kit is sized to provide combustion air for a single appliance only.
TABLE - 2E
AIR INLET CAP TERMINATIONS
MODEL
CAT II
CAT IV
CAT IV
KIT
NUMBER
MODEL
CAT II CAT IV
CAT IV
KIT
NUMBER
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
PB/FN0502-M9 5" 7" 5" 4" SAK3003 PB/FN1501-M9 6" 8" 6" 6" SAK3004 PB/FN0752-M9 5" 9" 5" 5" SAK3003 PB/FN1701-M9 7" 9" 7" 7" SAK3005 PB/FN1002-M9 6" 10" 6" 6" SAK3004 PB/FN2001-M9 8" 10" 8" 8" SAK3006 PB/FN1302-M9 6" 12" 6" 8" SAK3004
-- -- -- -- -- --
Air Inlet Cap
D
CAT IV
Sidewall termination with combustion air from equipment room - see page 15.
The connection from the appliance flue outlet to the sidewall vent cap MUST be made with listed Category IV vent materials and accessories. The installer must supply suitable vent pipe material. The sidewall vent cap must be purchased from the appliance manufacturer.
The sidewall vent cap kit includes the wall penetration assembly and the discharge screen assembly. All required Category IV vent pipe and fittings must be purchased locally.
The termination point for the flue products must follow the sidewall vent termination clearance requirements on pages 28 and 29. These units can be identified by the Category IV and the control number M9 as noted on the unit’s rating plate. Note: PB/FN0502 - 1302 - F9 models with Category I sized vent connection can be sidewall vented with Category IV vent material using the vent decreaser included in the SVK Kit listed in Table 2F. This venting technique with corresponding vent decreasers is not available on the larger PB/FN1501 - 2001 models.
Follow all requirements in the General Venting and Category IV General Venting sections for proper installation and for venting flue products to the outdoors with a sidewall termination (see pages 22 and 23).
TABLE - 2F
FLUE VENT TERMINATION SIZES
MODEL
CAT IV
VENT SIZE
CAT IV
KIT
MODEL
CAT IV
VENT SIZE
CAT IV
KIT
MODEL
CAT IV
VENT SIZE
CAT IV
KIT
PB/FN0502-M9 4" SVK3069 PB/FN0502-F9 4" SVK3056 PB/FN1501-M9 6" SVK3018
PB/FN0752-M9 5" SVK3070 PB/FN0752-F9 5" SVK3057 PB/FN1701-M9 7" SVK3019
PB/FN1002-M9 6" SVK3018 PB/FN1002-F9 6" SVK3058 PB/FN2001-M9 8" SVK3068 PB/FN1302-M9 8" SVK3068 PB/FN1302-F9 8" SVK3059
--
-- --
Ven t C ap
Page 18
18
2 Venting
E
CAT IV
Condensing vent options: CAT IV
Horizontal direct vent installation with sidewall combustion air inlet - see page 15.
The horizontal direct vent system is installed with a Category IV flue and a separate combustion air pipe to the outdoors. The flue outlet and combustion air intake must both terminate on the same sidewall.
The connection from the appliance flue outlet to the sidewall vent cap MUST be made with listed Category IV vent materials and accessories. The installer must supply suitable vent pipe material. The horizontal direct vent must be purchased from the appliance manufacturer.
The termination point for the flue products must follow the sidewall vent termination clearance requirements on pages 28 and 29. These units can be identified by the Category IV and the control number M9 as noted on the unit’s rating plate. Note: PB/FN0502 - 1302 - F9 models with Category I sized vent connection can be sidewall vented with Category IV vent material using the vent decreaser included in the SVK Kit listed in Table 2H. This venting technique with corresponding vent decreasers is not available on the larger PB/FN1501 - 2001 models.
The horizontal direct vent kit includes the wall penetration assembly and the discharge screen assembly for the flue and a combustion air inlet cap. All required vent pipe and fittings must be purchased locally.
Follow all requirements in the General Venting and Category IV General Venting sections for proper installation and for venting flue products to the outdoors with a sidewall termination (see pages 22 and 23).
The horizontal direct vent system requires the installation of an additional pipe to supply combustion air from outdoors directly to the appliance. Follow all requirements under the Combustion Air Inlet section on pages 25 and 26.
TABLE - 2G
SIDEWALL AIR AND VENT TERMINATION SIZES
MODEL
CAT IV
CAT IV
KIT
MODEL
CAT IV
CAT IV
KIT
MODEL
CAT IV
CAT IV
KIT
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
PB/FN0502-M9 5" 4" HDK3052 PB/FN0502-F9 5" 4" HDK3040 PB/FN1501-M9 6" 6" HDK3049 PB/FN0752-M9 5" 5" HDK3053 PB/FN0752-F9 5" 5" HDK3041 PB/FN1701-M9 7" 7" HDK3050 PB/FN1002-M9 6" 6" HDK3049 PB/FN1002-F9 6" 6" HDK3042 PB/FN2001-M9 8" 8" HDK3051 PB/FN1302-M9 6" 8" HDK3054 PB/FN1302-F9 6" 8" HDK3043
-- -- -- --
Ven t C ap
Air Inlet Cap
F
CAT IV
Horizontal DirectAire installation with vertical or sidewall combustion air ­page 15.
The Horizontal DirectAire vent system terminates the flue at the sidewall and air inlet at either the rooftop or a sidewall opposite the vent termination. The flue outlet and combustion air intake terminate in different pressure zones.
The connection from the appliance flue outlet to the sidewall vent cap MUST be made with listed Category IV vent materials and accessories. The installer must supply suitable vent pipe material. The Horizontal DirectAire vent cap must be purchased from the appliance manufacturer.
The termination point for the flue products must follow the sidewall vent termination clearance requirements on pages 28 and 29. These units can be identified by the Category IV and the control number M9 as noted on the unit’s rating plate. Note: PB/FN0502 - 1302 - F9 models with Category I sized vent connection can be sidewall vented with Category IV vent material using the vent decreaser included in the SVK Kit listed in Table 2H This venting technique with corresponding vent decreasers is not available on the larger PB/FN1501 - 2001 models.
The Horizontal DirectAire vent system with a vertical air inlet requires a sidewall vent kit. The Horizontal DirectAire vent system with a sidewall air inlet requires a horizontal direct vent kit. All required vent pipe and fittings must be purchased locally.
Follow all requirements in the General Venting and Category IV General Venting sections for proper installation and for venting flue products to the outdoors with a sidewall termination (see pages 22 and 23).
The Horizontal DirectAire vent system requires the installation of an additional pipe to supply combustion air from outdoors directly to the appliance. Follow all requirements under the Combustion Air Inlet section on pages 24 and 25.
TABLE - 2H
SIDEWALL VENT TERMINATION SIZES
MODEL
CAT IV
CAT IV
KIT
MODEL
CAT IV
CAT IV
KIT
MODEL
CAT IV
CAT IV
KIT
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
AIR
SIZE
VENT
SIZE
PB/FN0502-M9
5"
4" SVK3069 PB/FN0502-F9 5" 4" SVK3056 PB/FN1501-M9 6" 6" SVK3018
PB/FN0752-M9
5"
5" SVK3070 PB/FN0752-F9 5" 5" SVK3057 PB/FN1701-M9 7" 7" SVK3019
PB/FN1002-M9
6"
6" SVK3018 PB/FN1002-F9 6" 6" SVK3058 PB/FN2001-M9 8" 8" SVK3068
PB/FN1302-M9
6"
8" SVK3068 PB/FN1302-F9 6" 8" SVK3059
-- -- --
--
Ven t C ap
Installation & Operation Manual
Page 19
Installation & Operation Manual
2 Venting (continued)
19
Non-Condensing Vent Options: CAT I
G
Vertical negative draft venting system - see pages 20 and 21.
H
DirectAire vertical venting with vertical air inlet
- see pages 20 and 21.
I
DirectAire vertical venting with sidewall inlet ­see pages 20 and 21.
3'
12"
A required field supplied barometric damper MUST BE installed in location shown.
Vertical negative draft venting system - see page 20.
CAT I - F9
CAT I - B9
DirectAire vertical venting with vertical air inlet - see page 20.
CAT I - F9
CAT I - B9
DirectAire vertical venting with sidewall inlet - see page 20.
CAT I - F9
CAT I - B9
INCORRECT
INSTALLATIONS
A required field supplied barometric damper MUST BE installed in location shown.
A required field supplied barometric damper MUST BE installed in location shown.
Page 20
Installation & Operation Manual
20
2 Venting
Non-Condensing vent options: CAT I
Vertical negative draft venting system - see page 19.
Units that may be vented with a Category I, Type “B” vent material operate with limited burner modulation. These units can be identified by the Category I and the control number F9 or B9 as noted on the unit’s rating plate. These are the only units that can be vented with standard double-wall vent material. See the General Venting and the Negative Draft General Venting on pages 21 and 22. The flue must terminate at the rooftop and follow the clearance requirements on pages 27 and 28. Combustion air is supplied from the equipment room. The installation of the vent must conform to the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment. The negative draft in a conventional vent installation must be within the range of 0.02 to 0.08 inches w.c. to ensure proper operation. Make all draft readings while the unit is in stable operation (approximately 2 to 5 minutes).
TABLE - 2I
FIELD PROVIDED TERMINATIONS
MODEL VENT SIZES MODEL VENT SIZES
PB/FN0502-F9 7" PB/FN1501-B9 12" PB/FN0752-F9 9" PB/FN1701-B9 14" PB/FN1002-F9 10" PB/FN2001-B9 14" PB/FN1302-F9 12"
-- --
G
CAT I
TABLE - 2J
FIELD PROVIDED TERMINATIONS
MODEL AIR SIZES
VENT SIZES MODEL AIR SIZES VENT SIZES
PB/FN0502-F9 5" 7" PB/FN1501-B9 6" 12" PB/FN0752-F9 5" 9" PB/FN1701-B9 7" 14" PB/FN1002-F9 6" 10" PB/FN2001-B9 8" 14" PB/FN1302-F9 6" 12"
-- -- --
DirectAire vertical venting with vertical air inlet - see page 19.
Units that may be vented with a Category I, Type “B” vent material operate with limited burner modulation. These units can be identified by the Category I and the control number F9 or B9 as noted on the unit’s rating plate. These are the only units that can be vented with standard double-wall vent material. See the General Venting and the Negative Draft General Venting sections on pages 21 and 22. The flue must terminate at the rooftop and follow the clearance requirements on pages 27 and 28. Combustion air is supplied vertically from the rooftop. The installation of the vent must conform to the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment. The negative draft in a conventional vent installation must be within the range of 0.02 to 0.08 inches w.c. to ensure proper operation. Make all draft readings while the unit is in stable operation (approximately 2 to 5 minutes).
TABLE - 2K
AIR INLET CAP
MODEL
AIR
SIZES
VENT
SIZES
KIT
NUMBER
MODEL
AIR
SIZES
VENT
SIZES
KIT
NUMBER
PB/FN0502-F9 5" 7" SAK3003 PB/FN1501-B9 6" 12" SAK3004 PB/FN0752-F9 5" 9" SAK3003 PB/FN1701-B9 7" 14" SAK3005 PB/FN1002-F9 6" 10" SAK3004 PB/FN2001-B9 8" 14" SAK3006 PB/FN1302-F9 6" 12" SAK3004
--
--
-- --
DirectAire vertical with sidewall air inlet - see page 19.
Units that may be vented with a Category I, Type “B” vent material operate with limited burner modulation. These units can be identified by the Category I and the control number F9 or B9 as noted on the unit’s rating plate. These are the only units that can be vented with standard double-wall vent material. See the General Venting and the Negative Draft General Venting sections on pages 21 and 22. The flue must terminate at the rooftop and follow the clearance requirements on pages 27 and 28. Combustion air is supplied horizontally from the outside. The installation of the vent must conform to the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment. The negative draft in a conventional vent installation must be within the range of 0.02 to 0.08 inches w.c. to ensure proper operation. Make all draft readings while the unit is in stable operation (approximately 2 to 5 minutes).
H
CAT I
I
CAT I
Air Inlet Cap
Page 21
Installation & Operation Manual
2 Venting (continued)
21
Common Venting CAT II:
Flues of multiple Power-fins may be combined by incorporating a vent increaser to change the Category IV appliance to a Category II vent system which can be common vented using an engineered vent system. The increaser kit must be provided by the manufacturer and the combined engineered vent system must be designed to ensure that flue products will be properly exhausted from the building at all times. Failure to use the correct vent increaser or a properly sized vent system may result in a hazardous condition where flue gases spill into an occupied living space. Consult a vent designer to determine the diameter of the common vent pipe required for combined vent installation. It is recommended that all vent joints and seams are sealed gastight. This vent system has specific vent material and installation requirements. The negative draft in a conventional vent installation must be within the range of 0.02 to 0.08 inches w.c. to ensure proper operation. Make all draft readings while the unit is in stable operation (approximately 2 to 5 minutes).
Common Venting CAT I - Venting options: G, H, & I (F9 / B9)
The negative draft in a conventional vent installation must be within the range of 0.02 to 0.08 inches w.c. to ensure proper operation. Make all draft readings while the unit is in stable operation (approximately 2 to 5 minutes).
As noted in the diagrams on page 19, F9 models do not require a barometric damper in a single stack installation as illustrated. However, common venting of multiple negative draft appliances requires that you MUST install a barometric damper on each unit to regulate draft. Install per the requirements of the latest edition of the National Fuel Gas Code, ANSI Z223.1 and/or CAN/CGA­B149 Installation Code.
Common Venting systems may be too large when an existing unit is removed. At the time of removal of an existing appliance, follow the steps below with each appliance remaining connected to the common venting system placed in operation, while other appliances remaining connected to the common venting system are not in operation:
a. Seal any unused opening in the common venting system.
b. Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction,
leakage, corrosion, and other unsafe condition.
c. Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances
remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any other appliances not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.
d. Place in operation the appliance being inspected. Follow the lighting (operating) instructions in this manual (see page 51).
Adjust thermostat so appliance will operate continuously.
e. Test for spillage at the draft hood / relief opening after five (5) minutes of main burner operation. Use the
flame of a match or candle, or smoke from a cigarette, cigar, or pipe.
f. After it has been determined that each appliance remaining connected to the common venting system vents properly when
tested as above, return doors, windows, exhaust fans, fireplace dampers, and other gas burning appliances to their previous conditions of use.
g. Any improper operation of the common venting system should be corrected so that the installation conforms to the latest
edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment.
When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment.
B9 Barometric Damper CAT I - Venting options: G, H, & I (Required for B9)
Category I B9 units require a field supplied barometric damper to be installed at the rear of the unit. The damper should be installed directly after the flue collar prior to going vertical with the flue pipe as shown in the figures on page 19. The damper position indicator should be visible after its installation. The damper should be sized appropriately for the flue pipe. 1501 B9 models require a 12" damper. 1701 and 2001 B9 models require a 14" damper. When using barometric dampers, make-up air must be supplied to the room in order for them to function. This location is important and specifically required for the B9 appliance and may not match suggested locations found in the damper manufacturer’s installation manual. Otherwise follow the manufacturer’s recommendations on damper installation and operation. The negative draft in a conventional vent installation must be within the range of 0.02 to 0.08 inches w.c. to ensure proper operation. Make all draft readings while the unit is in stable operation (approximately 2 to 5 minutes).
Note: Barometric dampers may also be required on 502, 752, 1002, and 1302 “F9” models for use in high draft areas and are required when common venting multiple negative draft Category I appliances (see Common Venting CAT I section).
Page 22
Installation & Operation Manual
22
2 Venting
CAT I, II, & IV General venting information- Vent options: All Categories
Vent installation for connection to gas vents or chimneys must be in accordance with “Venting of Equipment”, of the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CAN/CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment or applicable provisions of the local building codes.
All venting applications where combustion air is drawn from the equipment room must have adequate combustion and ventilation air supplied to the equipment room in accordance with the latest edition of CAN/CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment or applicable provisions of the local building codes.
The distance of the vent terminal from adjacent buildings, windows that open and building openings MUST comply with the minimum clearances stated in this manual and the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CAN/CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment.
The vent connection is made directly to the flue outlet opening on the rear of the unit. The connection from the appliance vent to the stack must be made as direct as possible with no reduction in diameter.
CAT IV Specific venting information: Vent Options A, B, C, D, E, & F
A Category IV venting system operates with a positive pressure in the vent. This positive pressure is generated by the internal combustion air blower which operates the combustion process and also exhausts the flue products from the building. The Category IV flue from this appliance cannot be combined with the vent from any other appliance. The Category IV flue from this appliance
must be a dedicated stack, there is one exception however. The Category IV flues from multiple Power-fin appliances may only be combined when using an engineered vent system incorporating an induced draft fan to ensure that flue products will be properly exhausted from the building at all times. Failure to use a properly sized induced draft fan on a combined Category IV vent installation may result in a hazardous condition where flue gases spill into an occupied living space. Consult the induced
draft fan manufacturer to size the induced draft fan and to determine the diameter of the common vent pipe required for a combined vent installation. The flue from this Category IV appliance must have all vent joints and seams sealed gastight. A Category IV vent system has specific vent material and installation requirements.
The flue products in the vent system may be cooled below their dew point and form condensate in the flue. The flue materials used for a Category IV vent must be resistant to any corrosive damage from flue gas condensate. The flue from a Category IV vent system must have a condensate drain with provisions to properly collect and dispose of any condensate that may occur in the venting system.
The connection from the appliance vent to the stack or vent termination outside the building must be made with listed Category IV vent material and must be as direct as possible. The Category IV vent and accessories such as firestop spacers, thimbles, caps, etc., must be installed in accordance with the vent manufacturer’s instructions. The vent connector and firestop must provide correct spacing to combustible surfaces and seal to the vent connector on the upper and lower sides of each floor or ceiling through which the vent connector passes.
Any vent materials specified must be listed by a nationally recognized test agency for use as a Category IV vent material.
The venting system must be planned so as to avoid possible contact with concealed plumbing or electrical wiring inside walls, floors, or ceilings. Locate the appliance as close as possible to a chimney or gas vent.
Horizontal portions of the venting system shall be supported to prevent sagging. Horizontal runs should slope upwards not less than a 1/4 inch per foot from the drain tee installed in the flue to the vertical portion of the flue or to the vent terminal on sidewall venting installations. This ensures proper removal of any condensate that may form in the flue. Follow the installation instructions from the vent material manufacturer.
NOTICE
Examine the venting system at least once a year. Check all joints and vent pipe connections for tightness. Also check for corrosion or deterioration. Immediately correct any problems observed in the venting system.
Page 23
Installation & Operation Manual
2 Venting (continued)
23
CAT IV Specific venting information (continued): Vent options A, B, C, D, E, & F
Do not use an existing chimney as a raceway if another appliance or fireplace is vented through the chimney. The weight of the venting system must not rest on the unit. Adequate support of the venting system must be provided in compliance with local codes and other applicable codes. All connections should be secured and sealed per the vent manufacturer’s specifications.
Vent connectors serving appliances vented by natural draft shall not be connected to any portion of the Category IV positive pressure vent system used by this appliance. Connection of a negative draft flue into the positive pressure stack from this appliance may cause flue products to be discharged into an occupied living space causing serious health injury.
When a Category IV vent system is disconnected for any reason, the flue must be reassembled and resealed according to the vent manufacturer’s instructions.
The flue may terminate either vertically at the rooftop or horizontally on a sidewall. Refer to the specific vent termination sections for information about recommended vent termination location and clearances.
Length of flue pipe
The installed length of the Category IV flue from the appliance to the point of termination, outside of the building, must not exceed a maximum of 50 equivalent feet (15.2m) in length. Subtract 5 feet (1.5m) of equivalent length for each 90° elbow installed in the vent. Subtract 2 1/2 feet (0.7m) of equivalent length for each 45° elbow installed in the vent.
CAT II/IV Drain Tee Requirements: Vent options A, B, C, D, E, & F
Drain tee installation
A drain tee must be installed in the Category II & IV vent pipe to collect and dispose of any condensate that may occur in the vent system. The drain tee should be installed at the point where the flue turns vertical for a rooftop termination or as one of the first fittings in a horizontal flue connector that will terminate on a sidewall. Ensure that horizontal portions of the vent are properly sloped to allow condensate to be evacuated at the drain tee. Plastic drain tubing, sized per the vent manufacturer’s instructions, shall be provided as a drain line from the tee. The drain tubing must have a trap provided by a 10" (25.4cm) diameter circular trap loop in the drain tubing. Prime the trap loop by pouring a small quantity of water into the drain hose before assembly to the vent. Secure the trap loop in position with nylon wire ties. Use caution not to collapse or restrict the condensate neutralization system or a suitable drain for disposal of condensate that may occur in the Category IV vent system. Ensure that the drain from the condensate tee is not exposed to freezing temperatures. See Section 7, Startup - Freeze Protection for more information.
Figure 2-3_Drain Tee Installation
CAT I Specific venting information:
Follow all requirements set forth in the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of the CAN/CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment or applicable provisions of the local building codes.
Page 24
Installation & Operation Manual
24
2 Venting
Vertical Air Inlet: Vent options B, F, & H
Vertical combustion air inlet
The air inlet cap for the vertical rooftop air inlet is assembled from components purchased locally. The air inlet cap consists of two 90° elbows installed at the point of termination for the air inlet pipe. The first 90° elbow is installed on the rooftop at the highest vertical point of the air inlet pipe and turned horizontal, the second 90° elbow is installed on the horizontal outlet of the first elbow and turned down.
A 90° elbow and a 90° street elbow may be used to make this assembly. If a straight piece of pipe is used between the two elbows, it should not exceed 6 inches (152mm) in length. The termination elbow on the air inlet must be located a minimum of 12 inches (0.30m) above the roof or above normal levels of snow accumulation.
Location of a vertical air inlet cap
Incorrect installation and/or location of the air inlet cap can allow the discharge of flue products to be drawn into the combustion process on the heater. This can result in incomplete combustion and potentially hazardous levels of carbon monoxide in the flue products. This will cause operational problems with the heater and possible spillage of flue products that can cause personal injury, death, or property damage.
The point of termination for the combustion air inlet cap MUST be at least 3 feet (0.91m) below the point of flue gas termination (vent cap) if it is located within a 10 foot (3.05m) radius of the flue outlet. Use care to ensure that the 90° elbow assembly is properly installed on the air inlet pipe.
The combustion air inlet cap must not be installed closer than 10 feet (3.05m) from an inside corner of an L-shaped structure.
The termination point of the combustion air inlet cap must be installed at least one foot (0.30m) above the rooftop and above normal snow levels.
The combustion air cap assembly used MUST adequately protect the combustion air inlet from wind and weather.
Combustion air supplied from outdoors must be free of contaminants (see Combustion and Ventilation Air, page 10). To prevent recirculation of flue products into the combustion air inlet, follow all instructions in this section.
The combustion air inlet caps for multiple appliance installations must maintain the minimum 3 foot (0.91m) clearance below the closest vertical flue outlet if within 10 feet (3.05m).
Figure 2-4_Vertical Air Inlet Clearances
Page 25
Installation & Operation Manual
2 Venting (continued)
25
Multiple horizontal or vertical direct vent installations
The combustion air inlet caps for multiple appliance installations must maintain the same minimum clearance from the closest vent cap installed within a 10 foot radius of the point of flue gas termination as specified in single appliance installations. Multiple flue outlet caps may be installed side by side and multiple air inlet caps may be installed side by side, but the minimum clearance of a 3 foot (0.91m) horizontal radius and 12 inches (0.30m) below the closest flue outlet to the air inlet cap must be maintained. All clearance and installation requirements in this section and the applicable portions of the Category IV General Venting section must be maintained on multiple appliance installations.
Horizontal Air Inlet: Vent options C, E, F, & I
Sidewall combustion air inlet
The sidewall termination caps for both the flue products and combustion air must be purchased from the appliance manufacturer.
The part numbers for the required sidewall termination kit are listed under each designated table. Each kit includes both the special combustion air inlet cap and the sidewall flue cap for installation on an exterior sidewall. The sidewall air inlet cap supplied in the kit is sized to provide combustion air for a single appliance only.
Location of a sidewall air inlet cap
Incorrect installation and/or location of the air inlet cap can allow the discharge of flue products to be drawn into the combustion process on the heater. This can result in incomplete combustion and potentially hazardous levels of carbon monoxide in the flue products. This will cause operational problems with the heater and possible spillage of flue products that can cause personal injury, death, or property damage.
The termination point of the sidewall air inlet must be installed a minimum of 12 inches (0.30m) above ground level and above normal levels of snow accumulation.
The point of termination for the sidewall combustion air inlet cap MUST be located a minimum of 3 feet (0.91m) horizontally and 12 inches (0.30m) below the point of flue gas termination (vent cap) if it is located within a 10 foot (3.05m) radius of the flue outlet.
The combustion air inlet caps for multiple appliance installations must maintain the same minimum clearance from the closest vent cap installed within a 10 foot radius of the point of flue gas termination as specified in single appliance installations.
Figure 2-5_Horizontal Air Inlet Clearances
The combustion air inlet cap must not be installed closer than 10 feet (3.05m) from an inside corner of an L-shaped structure.
The combustion air cap assembly used MUST adequately protect the combustion air inlet from wind and weather.
Combustion air supplied from outdoors must be free of contaminants (see Combustion and Ventilation Air, page 10). To prevent recirculation of flue products into the combustion air inlet, follow all instructions in this section.
Page 26
Installation & Operation Manual
26
2 Venting
Length of air inlet pipe for both vertical and horizontal - Vent options: All Categories
The maximum installed length of the air inlet pipe from the appliance to the air inlet cap is 50 equivalent feet (15.2m) in length. Subtract 5 feet (1.52m) of equivalent length for each 90° elbow installed in the air inlet pipe. Subtract 2 1/2 feet (0.7m) of equivalent length for each 45° elbow installed in the air inlet pipe.
Air inlet pipe materials:
The air inlet pipe(s) must be sealed. Choose acceptable combustion air inlet pipe materials from the following list:
PVC, CPVC or ABS Dryer Vent or Sealed Flexible Duct (not recommended for rooftop air inlet) Galvanized steel vent pipe with joints and seams sealed as specified in this section. Type “B” double-wall vent with joints and seams sealed as specified in this section.
*Plastic pipe may require an adapter (not provided) to transition between the air inlet connection on the appliance and the plastic air inlet pipe.
WARNING
Using vent or air intake materials other than those specified, failure to properly seal all seams and joints or failure to follow vent pipe manufacturer’s instructions can result in personal injury, death or property damage. Mixing of venting materials will void the warranty and certification of the appliance.
NOTICE
The use of double-wall vent or insulated material for the combustion air inlet pipe is recommended in cold climates to prevent the condensation of airborne moisture in the incoming combustion air.
Sealing of Type “B” double-wall vent material or galvanized vent pipe material used for air inlet piping on a sidewall or vertical rooftop Combustion Air Supply System:
a. Seal all joints and seams of the air inlet pipe using either Aluminum Foil Duct Tape meeting UL Standard 723 or 181A-P or a
high quality UL Listed silicone sealant such as those manufactured by Dow Corning or General Electric.
b. Do not install seams of vent pipe on the bottom of horizontal runs.
c. Secure all joints with a minimum of three sheet metal screws or pop rivets. Apply Aluminum Foil Duct Tape or silicone sealant
to all screws or rivets installed in the vent pipe.
d. Ensure that the air inlet pipes are properly supported.
The PVC, CPVC, or ABS air inlet pipe should be cleaned and sealed with the pipe manufacturer’s recommended solvents and standard commercial pipe cement for the material used. The PVC, CPVC, ABS, Dryer Vent or Flex Duct air inlet pipe should use a silicone sealant to ensure a proper seal at the appliance connection and the air inlet cap connection. Dryer vent or flex duct should use a screw type clamp to seal the vent to the appliance air inlet and the air inlet cap. Proper sealing of the air inlet pipe ensures that combustion air will be free of contaminants and supplied in proper volume.
When a sidewall or vertical rooftop combustion air supply system is disconnected for any reason, the air inlet pipe must be resealed to ensure that combustion air will be free of contaminants and supplied in proper volume.
DANGER
Failure to properly seal all joints and seams as required in the air inlet piping may result in flue gas recirculation, spillage of flue products and carbon monoxide emissions causing severe personal injury or death.
Combined combustion air inlet points - Category I, II, & IV
The air inlet pipes from multiple appliances can be combined to a single common connection if the common air inlet pipe has a cross sectional area equal to or larger than the total area of all air inlet pipes connected to the common air inlet pipe. [Example: two 8" (20.3cm) air inlet pipes (50.3 in
2
(324.5cm2) area each) have a total area of 100.6 in2(645.2cm2) requires a 12 inch (30.5cm) (113.1in2 area) (729.7cm2) common air inlet pipe.] The air inlet point for multiple boiler air inlets must be provided with an exterior opening which has a free area equal to or greater than the total area of all air inlet pipes connected to the common air inlet. This exterior opening for combustion air must connect directly to the outdoors. The total length of the combined air inlet pipe must not exceed a maximum of 50 equivalent feet (15.2m). You must deduct the restriction in area provided by any screens, grills, or louvers installed in the common air inlet point. These (screens, grills, or louvers) are common on the sidewall air inlet openings and some rooftop terminations. Screens, grills, or louvers installed in the common air inlet can reduce the free area of the opening from 25% to 75% based on the materials used.
Page 27
Installation & Operation Manual
2 Venting (continued)
27
Vertical Vent Termination Clearances - Venting options: A, B, C, G, H & I
Figure 2-6_Vent Termination from Peaked Roof - 10 ft. or Less From Ridge
Figure 2-7_Vent Termination from Peaked Roof - 10 ft. or More From Ridge
Figure 2-8_Vent Termination from Flat Roof - 10 ft. or Less From Parapet Wall
Figure 2-9_Vent Termination from Flat Roof - 10 ft. or
More From Parapet Wall
The vent terminal should be vertical and exhaust outside the building at least 2 feet (0.61m) above the highest point of the roof within a 10 foot (3.05m) radius of the termination.
The vertical termination must be a minimum of 3 feet (0.91m) above the point of exit.
A vertical termination less than 10 feet (3.05m) from a parapet wall must be a minimum of 2 feet (0.61m) higher than the parapet wall.
The vent cap should have a minimum clearance of 4 feet (1.22m) horizontally from and in no case above or below, unless a 4 foot (1.22m) horizontal distance is maintained from electric meters, gas meters, regulators, and relief equipment.
The venting system shall terminate at least 3 feet (0.9m) above any forced air inlet within 10 feet (3.05m).
The venting system shall terminate at least 4 feet (1.2m) below, 4 feet (1.2m) horizontally from, or 1 foot (30cm) above any door, window, or gravity air inlet into any building.
Do not terminate the vent in a window well, stairwell, alcove, courtyard, or other recessed area. The vent cannot terminate below grade. The bottom of the vent terminal shall be located at least 12 inches (30cm) above the roof or above normal snow levels.
To avoid a blocked flue condition, keep the vent cap clear of snow, ice, leaves, debris, etc.
Page 28
Installation & Operation Manual
28
2 Venting
Vertical Vent Termination Clearances - Venting options: A, B, C, G, H & I
Flue gases from this appliance may contain large amounts of water vapor that will form a white plume in winter. Plume could obstruct window view.
Flue gas condensate can freeze on exterior surfaces or on the vent cap. Frozen condensate on the vent cap can result in a blocked flue condition. Flue gas condensate can cause discoloration of exterior building surfaces. Adjacent brick or masonry surfaces should be protected with a rust resistant sheet metal plate.
The manufacturer shall NOT be held liable for any personal injury or property damage due to ice formation or dislodging of ice from the vent system or vent termination.
Masonry chimney installations
A standard masonry chimney must NOT be used to vent the products of combustion from the flue of a Category IV, positive pressure appliance. If a masonry chimney is to be used, the chimney MUST use a sealed, metallic, corrosion resistant liner system to vent flue products from this high efficiency appliance. Sealed, metallic, corrosion resistant liner systems (single-wall, double-wall, flexible or rigid metallic lines) must be rated for use with a high efficiency, Category IV, positive pressure vent system. Corrosion resistant chimney liner systems are typically made from a high grade of corrosion resistant stainless steel such as AL29-4C. The corrosion resistant liner must be properly sized and fully sealed throughout the entire length if the flue is contained within the masonry chimney. Both the top and the bottom of the masonry chimney must be capped and sealed to provide a dead air space around the sealed corrosion resistant metallic liner. Consult with local code officials to determine code requirements or the advisability of using a masonry chimney with a sealed corrosion resistant liner system.
CAUTION
Venting of a high efficiency Category IV appliance into a masonry chimney without a sealed stainless steel liner can result in operational and safety problems. Any breaks, leaks, or damage to the masonry flue/tile will allow spillage of the positive pressure flue products from the chimney. These flue products can easily escape into an occupied living space causing a health hazard. If there is any doubt about the condition of a masonry chimney, or its acceptability for use after insertion of a corrosion resistant liner system, consult with local code officials.
Location of a sidewall vent termination - Venting options: D, E, & F
The vent cap shall terminate at least 3 feet (0.91m) above any forced air inlet within 10 feet (3.05m).
The vent shall terminate at least 4 feet (1.22m) below, 4 feet (1.22m) horizontally from or 1 foot (0.30m) above and 2 feet (0.60m) horizontally from any door, window, or gravity air inlet to the building.
The sidewall vent termination must be at least 8 feet (2.4m) horizontally from any combustion air intake located above the sidewall termination cap.
Do not terminate the vent in a window well, stairwell, alcove, courtyard, or other recessed area. The vent cap cannot terminate below grade.
The vent shall not terminate directly above a public walkway due to the normal formation of water vapor in the combustion process. Horizontal terminations must not be located over areas of pedestrian or vehicular traffic.
The vent system shall terminate at least 1 foot (0.30m) above grade, above normal snow levels and at least 7 feet (2.13m) above grade when located adjacent to public walkways.
The vent terminal shall not be installed closer than 3 feet (0.91m) from an inside corner of an L-shaped structure.
The vent cap should have a minimum clearance of 4 feet (1.22m) horizontally from and in no case above or below, unless a 4 foot (1.22m) horizontal distance is maintained from electric meters, gas meters, regulators, and relief equipment.
Flue gas condensate can freeze on exterior walls or on the vent cap. Frozen condensate on the vent cap can result in a blocked flue condition. Some discoloration to exterior building surfaces can be expected. Adjacent brick or masonry surfaces should be protected with a rust resistant sheet metal plate.
The sidewall vent system MUST use the sidewall vent cap kit provided by the appliance manufacturer for installation on a sidewall termination.
The sidewall vent cap MUST be purchased as a kit from the appliance manufacturer to ensure proper operation. Locally purchased or fabricated sidewall vent caps should not be used.
Page 29
Installation & Operation Manual
2 Venting (continued)
29
Sidewall Vent Termination Clearances - Venting options: D, E, & F
Figure 2-10_Vent to Forced Air Inlet
Figure 2-11_Vent to Doors and Windows
Figure 2-12_Vent Above Window
Figure 2-13_Direct Vent Clearance
Page 30
30
Installation & Operation Manual
Gas supply
Verify that the appliance is supplied with the type of gas specified on the rating plate. This appliance is configured for operation up to 4000 feet altitude. Consult factory for installations above 4000 feet elevation.
Inlet gas pressure: Measured at the inlet pressure tap on the appliance gas manifold. The pressure tap is located upstream of the redundant gas valve and downstream of the field installed gas cock.
TABLE 3A
INLET GAS PRESSURE
MODEL CODE
NATURAL LP
Max.
w.c.
Min.
w.c.
Max.
w.c.
Min.
w.c.
502 - 1302 F9 10.5 4.2 13.0 11.0
502 -1302 M9 14.0 4.0 13.0 11.0
1501 - 2001 B9 14.0 4.0 14.0 8.0
1501 - 2001 M9 14.0 4.0 14.0 8.0
Gas pressure test
1. The appliance must be disconnected from the gas
supply piping system during any pressure testing of that system at a test pressure in excess of 1/2 PSIG (3.5 kPa).
2. The appliance must be isolated from the gas supply
piping system by closing a manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 PSIG (3.5 kPa).
3. The appliance and its gas connection must be leak
tested before placing it in operation.
Checking manifold gas pressure
Reference the Power-fin Service Manual for information regarding manifold gas pressure.
Gas connection
Safe operation of the appliance requires properly sized gas supply piping. See gas line sizing data:
1. Gas pipe size may be larger than appliance connection.
2. Installation of a union at the appliance gas line connection is required for ease of service and removal of the gas train.
3. If an additional manual shutoff valve is required by local codes, install the valve on the outside at the gas supply to the appliance as shown in FIG. 3-1.
4. A sediment trap (drip leg) MUST be provided in the inlet of the gas connection to the appliance, see FIG. 3-1.
5. Optional gas controls may require routing of bleeds and vents to the atmosphere, outside the building when required by local codes.
Maximum inlet gas pressure must not exceed the value specified. Minimum value listed is for the purposes of input adjustment.
TABLE - 3B
FITTINGS TO EQUIVALENT STRAIGHT PIPE
Diameter Pipe
(inches)
1 1/2 2 3 4 5
Equivalent
length of
Straight Pipe
(feet)
4 5 10 14 20
NOTICE
If an inline high gas pressure regulator is used, it MUST BE of the lockup type and be located a minimum of 10 feet from the appliance. Failure to do so may result in insufficient gas volume supplied to the appliance.
3 Gas connections
Page 31
31
Installation & Operation Manual
TABLE - 3C
GAS PIPING SIZE CHART
Nominal
Iron Pipe
Size
Inches
Length of Pipe in Straight Feet
Maximum Capacity of Pipe in Thousands of
Btu/hr per hour
for gas pressures
of 14 Inches
Wate r C o lumn
(0.5 PSIG) or less
and a pressure
drop of 0.5 Inch
Wate r C o lumn
(Based on NAT GAS, 1025 Btu/hr per Cubic Foot of
Gas and 0.60
Specific Gravity)
10 20 30 40 50 60 70 80 90 100 125 150 175 200
3/4 369 256 205 174 155 141 128 121 113 106 95 86 79 74
1 697 477 384 328 292 267 246 256 210 200 179 164 149 138
1 1/4 1,400 974 789 677 595 543 502 472 441 410 369 333 308 287
1 1/2 2,150 1,500 1,210 1,020 923 830 769 707 666 636 564 513 472 441
2 4,100 2,820 2,260 1,950 1,720 1,560 1,440 1,330 1,250 1,180 1,100 974 871 820
2 1/2 6,460 4,460 3,610 3,100 2,720 2,460 2,310 2,100 2,000 1,900 1,700 1,540 1,400 1,300
3 11,200 7,900 6,400 5,400 4,870 4,410 4,000 3,800 3,540 3,300 3,000 2,720 2,500 2,340
4 23,500 16,100 13,100 11,100 10,000 9,000 8,300 7,690 7,380 6,870 6,150 5,640 5,130 4,720
Gas piping
Install piping to control
1. The gas line should be a separate line direct from the meter unless the existing gas line is of sufficient capacity. Verify pipe size with your gas supplier.
2. Use new, properly threaded black iron pipe free from chips. If tubing is used, make sure the ends are square, deburred and clean. All tubing bends must be smooth and without deformation. Avoid flexible gas connections. Internal diameter of flexible gas lines may not provide appliance with proper volume of gas.
3. Run pipe or tubing to the unit’s gas inlet. If tubing is used, obtain a tube to pipe coupling in order to connect the tubing to the unit’s gas inlet.
4. Install a sediment trap in the supply line to the unit’s gas inlet (see FIG. 3-1).
5. Remove seal over gas inlet to the appliance.
6. Apply a moderate amount of good quality pipe compound (DO NOT use Teflon tape) to pipe only, leaving two end threads bare.
7. Connect gas pipe to inlet of appliance. Use a wrench to support the gas manifold on the appliance.
8. For LP gas, consult your LP gas supplier for expert installation.
Figure 3-1_Gas Line Connection with Sediment Trap (Drip Leg) and Manual Main Gas Shutoff Valve
All gas connections must be made with pipe joint compound resistant to the action of liquefied petroleum and natural gas. All piping must comply with local codes and ordinances. Tubing installations must comply with approved standards and practices.
3 Gas connections (continued)
Page 32
32
Installation & Operation Manual
Figure 3-2_Gas Supply Pressure Measurement
14. Turn on the gas supply at the manual valve, turn on LP gas at the tank if required.
15. Turn the power switch to the “ON” position.
16. Adjust the temperature set point on the display of the SMART SYSTEM control module to the desired water temperature so the appliance will call for heat.
17. Check burner performance by cycling the system while you observe burner response. The burner should ignite promptly. Flame pattern should be stable, see “Maintenance - Normal Flame Pattern” in the Power-fin Service Manual. Turn system off and allow burner to cool, then cycle burner again to ensure proper ignition and flame characteristics.
Checking gas supply pressure
1. Turn the main power switch to the “OFF” position.
2. Shut off the gas supply at the manual gas cock in the gas piping to the appliance. If fuel supply is LP gas, shut off gas supply at the tank.
3. Remove the 1/8" hex plug from the gas pressure test port located on the manual shutoff valve at the rear of the appliance. Install a fitting in the inlet pressure tapping suitable to connect to a manometer or magnahelic gauge. Range of scale should be 14 inches water column or greater to check inlet pressure.
4. Turn on gas supply at the field installed manual gas cock, turn on LP gas at tank if required.
5. Turn the power switch to the “ON” position.
6. Adjust the temperature set point on the display to call for heat.
7. Observe the gas supply pressure as the burner fires at 100% of rated input. Percent of burner input will be shown on the display of the SMART SYSTEM control module.
8. Ensure inlet pressure is within specified range. Minimum and maximum gas supply pressures are specified in the Gas Supply section of this manual.
9. If gas pressure is out of range, contact the gas utility, gas supplier, qualified installer or service agency to determine necessary steps to provide proper gas pressure to the control.
10. If gas supply pressure is within normal range, proceed to remove gas manometer and replace pressure tap fittings in the gas piping to the appliance.
11. Turn the power switch to the “OFF” position.
12. Shut off gas supply at the manual gas cock in the gas piping to the appliance. If fuel supply is LP gas, shut off gas supply at the tank.
13. Remove the manometer and related fittings from the gas pressure test port at the inlet gas supply connection to the appliance. Replace the 1/8" plug in the gas pressure test port and tighten.
NOTICE
If a pressure drop of more than 2" w.c. occurs between Standby (Static) Mode and Operating (Dynamic) Mode, a gas volume problem exists. Contact the gas utility, gas supplier, qualified installer, or service agency to determine the necessary steps to provide the proper gas volume to the appliance.
High and low gas pressure switches
1. Manual reset high and low gas pressure switches are supplied to meet M13 firing code for Factory Mutual, GE GAP, and CSD-1.
2. In the Commonwealth of Massachusetts, gas appliances over 1,000,000 BTU must be equipped with manual reset high and low gas pressure switches when required to meet the Massachusetts requirements.
NOTE: Massachusetts code requires a pressure regulator to be installed upstream of the low gas pressure switch. Lochinvar requires any inline regulator used MUST BE of the lockup type and be located a minimum of 10 feet from the appliance. Failure to do so may result in insufficient gas volume supplied to the appliance. Massachusetts also requires a shutoff valve be installed ahead of the regulator for replacement or service. When required, both regulator and shutoff valve are to be “field provided”.
3. Figures 3-3A, B, and C on page 33 show piping connections for high and low gas pressure switches for respective Power­fin models.
3 Gas connections
Page 33
33
Installation & Operation Manual
High and low gas pressure switches (continued)
Figure 3-4_Gas Train Assembly F9 - Models 502 - 1302
F9 gas train
The combination gas valve on this appliance uses line (120 VAC) voltage for operation. These two valves satisfy the requirement for the safety shutoff and operating valves required on boilers and water heaters. The combination valve also regulates the amount of gas mixed with the air delivered to the burner for proper combustion. Both the combination valve and diaphragm valve have threaded vents - see the Venting of Gas Train Components section, this page.
There are no serviceable parts on the combination gas valve.
Venting of gas train components - F9/B9/M9 and optional gas train components
Local codes may require the routing component bleeds and vents to the atmosphere outside the building. Components (valves, pressure switches) having vents which would require external vent lines are provided with threaded vent line connections. These vent line connection points may be accessed by removing the top jacket panels. Proper routing of vent lines to the atmosphere from the factory supplied termination points is the responsibility of the installing contractor.
GAS COCK
REGULATING
GAS VALVE
GAS VALVE
BALL VALVE
W/PRESSURE TAP
ALUMINUM
TUBING .25 X .03
HIGH GAS
PRESSURE
SWITCH
LOW GAS
PRESSURE
SWITCH
*SEE REGULATOR
INSTALLATION
NOTE ON PAGE 33
ROUTING MAY VARY
TYPICAL PRESSURE REGULATOR
STYLE MAY VARY FROM SHOWN
“FIELD PROVIDED”
(IF REQUIRED BY LOCAL CODES)
TYPICAL SHUTOFF
VALVE
“FIELD PROVIDED”
(IF REQUIRED BY LOCAL CODES)
Figure 3-3A_PB/PF 502 - 1302 F9 High & Low Gas Pressure Switches
Figure 3-3B_PB/PF 502 - 1302 M9 High & Low Gas Pressure Switches
Figure 3-3C_PB/PF 1501 - 2001 M9 & B9 High & Low Gas Pressure Switches
NOTICE
The gas train and controls assembly provided on this unit have been tested under the applicable American National Standard to meet minimum safety and performance criteria such as safe lighting, combustion, and safety shutdown operation.
M9/B9 gas train
The ratio gas valve on this appliance uses line (120 VAC) voltage for operation. The valve contains the safety shutoff and operating valves required on boilers and water heaters. The ratio valve uses the negative pressure signal generated by the venturi to modulate the amount of gas, so that the proper mixture of air and gas is delivered to the burner throughout the full range of burner operation. The ratio gas valve does not require installation of a vent line - see the Venting of Gas Train Components section below.
There are no serviceable parts on the combination gas valve.
DOWNSTREAM
TEST VALVE
MANUAL SHUTOFF VALVE
VENTURI
RATIO VALVE
Figure 3-5_Gas Train Assembly M9/B9 - Models 1501
- 2001
3 Gas connections (continued)
TYPICAL PRESSURE REGULATOR
STYLE MAY VARY FROM SHOWN
“FIELD PROVIDED”
(IF REQUIRED BY LOCAL CODES)
TYPICAL SHUTOFF
VALVE
“FIELD PROVIDED”
(IF REQUIRED BY LOCAL CODES)
W/PRESSURE TAP
*SEE REGULATOR
INSTALLATION
NOTE ON PAGE 33
TYPICAL PRESSURE REGULATOR
STYLE MAY VARY FROM SHOWN
“FIELD PROVIDED”
(IF REQUIRED BY LOCAL CODES)
TYPICAL SHUTOFF
VALVE
“FIELD PROVIDED”
(IF REQUIRED BY LOCAL CODES)
GAS
VALVE
BALL VALVE
GAS VALVE
BALL VALVE
W/PRESSURE TAP
ALUMINUM
TUBING
.25 X .03
ROUTING MAY VARY
GAS COCK
PRESSURE
BALL VALVE
PRESSURE
SWITCH
LOW
SWITCH
PRESSURE
LOW
HIGH
SWITCH
DOWNSTREAM
TEST VALVE
VENTURI
MANUAL SHUTOFF VALVE
DIAPHRAM VALVE
COMBINATION VALVE
*SEE REGULATOR
INSTALLATION
NOTE ON PAGE 33
ALUMINUM
TUBING .25 X .03
ROUTING MAY VARY
HIGH
PRESSURE
SWITCH
Page 34
Figure 4-1_Water Connections
Heat exchanger
This appliance uses a finned copper tube heat exchanger to maximize the heat transfer process. The heat exchanger is mounted in the inner jacket on the front side of the appliance. The heat exchanger is composed of two circular, glass lined, and cast iron headers with either 20 or 24 (depending on the model) vertical finned copper tubes (FIG. 4-2). A series of “V” shaped baffles are installed between the individual tubes to control the movement of the flue products over the finned copper surface and increase heat transfer. Water enters the heat exchanger and makes four passes over the area exposed to direct heat from the burner. A circulating pump MUST be installed to ensure proper water flow over the heat transfer surfaces during burner operation. Water temperatures in the heat exchanger are determined by water flow.
Figure 4-2_Heat Exchanger(s)
Initial set-up of maximum water flow
On initial start-up of the Power-fin, the maximum water flow to the heat exchanger must be checked and manually limited with a valve or bypass before normal operation begins.
Minimum water temperatures
A minimum return water temperature of 140°F (60°C) has been established to control condensate formation based on the Btu/hr output at rated burner input. Maintaining inlet water temperatures to the appliance equal to or higher than the specified minimum temperature ensures proper operation of the appliance and prevents condensate formation on the heat exchanger. An appliance allowed to sustain operation at water temperatures lower than the specified minimum temperature may not provide enough heat from the burner to maintain water temperature in the heat exchanger above the 140°F (60°C) dew point of flue products. Operation of the appliance at a temperature below the specified minimum set point will result in non-warrantable operational problems from the condensate formation on the primary heat exchanger (see the Low Temperature Bypass Requirements section on page 41 of this manual).
CAUTION
An appliance allowed to operate at return temperatures below the specified minimum setting may experience problems with the operating controls, safety switches, obstruction of the flue gas passages on the heat exchanger, incomplete combustion and possible flue gas spillage. Sustained operation at lower than specified water temperatures may cause hazardous conditions that may result in personal injury or non-warrantable damage to the appliance.
Inlet and outlet connections
For ease of service, install unions on the inlet and outlet of the appliance. The connection to the appliance marked “Water Inlet” on the header should be used for return from the system. The connection on the header marked “Hot Water Outlet” is to be connected to the supply side of the system. Minimum water pipe connections to this appliance are 2 1/2 inches (63.5mm) pipe. See the piping requirements in the heating boiler or water heater section of this manual for multiple appliance installations.
4 Water connections
34
Installation & Operation Manual
Page 35
Water flow switch
A water flow switch is factory installed in the outlet piping on all heating boilers and water heaters. The flow switch must prove water flow before a trial for ignition can begin. The flow switch requires a minimum flow of 26 GPM to make the flow switch and start burner operation. A water flow switch meets most code requirements for a low water cutoff device on boilers requiring forced circulation for operation. A fault message, Flow Sw/LWCO will be indicated in the Operator Interface on a low water flow condition as sensed by the flow switch.
Low water cutoff
If this boiler is installed above radiation level, a low water cutoff device must be installed at the time of boiler installation. An electronic low water cutoff is available as a factory supplied option on all models. The low water cutoff should be inspected every 6 months. A fault message, Flow Sw/LWCO will be indicated in the Operator Interface on a low water condition as sensed by the low water cutoff.
Relief valve
This unit is supplied with a relief valve(s) sized in accordance with ASME Boiler and Pressure Vessel Code, Section IV (“Heating Boilers”). The relief valve(s) is installed in the vertical position and mounted in the hot water outlet. No valve is to be placed between the relief valve and the unit. To prevent water damage, the discharge from the relief valve shall be piped to a suitable floor drain for disposal when relief occurs. No reducing couplings or other restrictions shall be installed in the discharge line. The discharge line shall allow complete drainage of the valve and line. Relief valves should be manually operated at least once a year.
CAUTION
Avoid contact with hot discharge water.
Heating boiler installations
Piping of the boiler system
The drawings in this section show typical boiler piping installations, see FIG.’s 4-3 through 4-6. Before beginning the installation, consult local codes for specific plumbing requirements. The installation should provide unions and valves at the inlet and outlet of the boiler so it can be isolated for service. An air separation device must be supplied in the installation piping to eliminate trapped air in the system. Locate a system air vent at the highest point in the system. The system must also have a properly sized expansion tank installed. Typically, an air charged diaphragm-type expansion tank is used. The expansion tank must be installed close to the boiler and on the suction side of the system pump to ensure proper operation.
CAUTION
The boiler system should not be operated at less than 12 PSIG.
Hot water piping must be supported by suitable hangers or floor stands, NOT by the boiler. Copper pipe systems will be subject to considerable expansion and contraction. Rigid pipe hangers could allow the pipe to slide in the hanger resulting in noise transmitted into the system. Padding is recommended on rigid hangers installed with a copper system. The boiler pressure relief valve must be piped to a suitable floor drain. See the Relief Va lv e section on this page.
CAUTION
A leak in a boiler “system” will cause the “system” to intake fresh water constantly, which will cause the tubes to accumulate a lime/scale build up. This will cause a non­warrantable failure.
Water connections (heating boilers only)
All boilers have 2 1/2 inch copper pipe inlet and outlet connections. Installed piping to and from the boiler must be a minimum of 2 1/2 inch diameter.
CAUTION
Field installed reducing bushings must not be used.
Any reduction in pipe size may decrease flow resulting in high water temperatures, boiler noise, flashing to steam, and non­warrantable heat exchanger damage.
The boiler may be installed with either a primary/secondary piping system or with full system flow provided to the boiler. It is important to guarantee that adequate flow is provided to properly dissipate heat from the boiler and also ensure that flow through the boiler does not exceed the maximum recommended flow rate of 75 GPM for Models 502 - 1302 and 90 GPM for Models 1501 - 2001 for a boiler equipped with a copper heat exchanger.
Boiler circulator requirements
This is a low mass, high efficiency hot water boiler which must have adequate flow for quiet, efficient operation. Pump selection is critical to achieve proper operation. A pump should be selected to achieve proper system design water temperature rise. A system pump may provide full flow through the boiler or a separate pump may be installed in a secondary loop to the boiler. Pipe diameter and length are critical to ensure proper flow through the boiler. A System Temperature Rise Chart (Table 4B on page 42) is provided to assist in proper pump selection. This table provides GPM and boiler head-loss at various temperature rises for each model based on Btu/hr input. Temperature rise is the difference in boiler inlet temperature and boiler outlet temperature while the boiler is firing at full rate.
Example: The boiler inlet temperature is 160°F (71.1°C) and the boiler outlet temperature is 180°F (82.2°C). This means that there is a 20°F (11.1°C) temperature rise across the boiler. The boiler temperature rise is visible in the Operator Interface on the boiler’s front control panel.
35
4 Water connections (continued)
Installation & Operation Manual
Page 36
The boiler primary piping system must have a circulator installed in the main system loop to carry the heated boiler water to the point of use in the main system.
Multiple boilers may also be installed with a primary/secondary manifold system. Multiple boilers should be connected to the common manifold in reverse return to assist in balancing flow to multiple boilers.
The installer must ensure that the boiler has adequate flow without excessive temperature rise. Low system flow can result in overheating of the boiler water which can cause short burner cycles, system noise, relief valve discharge and in extreme cases, a knocking flash to steam. These conditions indicate the need to increase boiler flow to and from the boiler. This is generally accomplished by either increasing the size of the boiler pump or by increasing the diameter of the piping that connects the boiler to the primary system. A larger diameter pipe reduces head loss and increases flow.
Circulator pump specifications
1. Maximum operating pressure for the pump must exceed system operating pressure.
2. Maximum water temperature should not exceed the nameplate rating.
3. Cast iron circulators may be used for closed loop systems.
4. A properly sized expansion tank must be installed near the boiler and on the suction side of the pump.
Circulator pump operation (heating boilers only)
The boiler pump must run when the boiler is firing. Separate supply circuits can be provided or the two circuits (pump and controls) can be combined for connection to one circuit, properly sized for both.
CAUTION
At no time should the system pressure be less than 12 PSIG.
Intermittent pump operation
An intermittent pump operation feature is provided. The boiler’s circulating pump will cycle on at each call for heat, before the burner fires. The pump will continue to operate while the burner is firing. The pump will run for a minimum 30 second period after the temperature set point is satisfied. This timing is selectable from the Operator Interface. This timing will remove any of the residual heat from the combustion chamber before turning the pump off. See the wiring diagram in Section 11 of this manual.
Pump Maintenance: Inspect the pump every six (6) months and oil as necessary. Use SAE 30 non-detergent oil or lubricant specified by the pump manufacturer.
The boiler is recommended for installation in a primary/secondary piping system. This type of system uses a
separate boiler circulating pump to supply flow to and from the boiler only. The secondary pump is sized based on the head loss of the boiler and related pipe and fittings in the secondary loop only.
A properly sized primary system pump provides adequate flow to carry the heated boiler water to radiation, air over coils, etc. The fittings that connect the boiler to the primary system should be installed a maximum of 12 inches (0.30m) (or 4 pipe diameters) apart to ensure connection at a point of zero pressure drop in the primary system. There should be a minimum of 10 pipe diameters of straight pipe before and after the boiler secondary loop connections to prevent turbulent flow at the secondary loop connections. The secondary loop piping to and from the boiler must have a fully ported ball valve installed in both the supply and return side piping. The ball valves must be fully ported having the same inside diameter as the installed piping. The ball valve in the piping supplying water to the boiler will only be used as a service valve. The ball valve installed in the discharge from the boiler back to the primary system will be used to adjust boiler flow and temperature rise to ensure proper performance.
Low system water volume
System run time is very important to the overall operating efficiency of the boiler. Short cycling of the boiler creates problems with condensation in the vent stack, condensation on the heat exchanger, system temperature spikes, and mechanical component failures. To prevent short cycling of the boiler, it is important to limit the boiler cycles to six or fewer per hour.
A buffer tank is an effective way to enhance a small system load and increase heating system efficiency (see FIG. 4-6 on page 40 of this manual). Buffer tanks add water volume to the system and act as a flywheel to absorb the additional Btu’s provided by the boiler when only a single zone of a large system is calling for heat.
To calculate the proper buffer tank size for a multiple zone system:
(Run Cycle) (Output - Minimum System Load)
(Temp. Rise) (8.33) (60 Min.)
PBN2001-B9 ( 1.7:1 Turndown)
Min. Load = 100,000 Btu/Hr
Min. Boiler Output = 850,000 Btu/Hr
Cycle Time = 10 Min
Temp. Rise = 38
(10)(850,000 – 100,000) / (38)(8.33)(60) = 395 Gallons
4 Water connections
36
Installation & Operation Manual
Page 37
Figure 4-3_Primary/Secondary Piping of a Single Boiler
COMMON MANIFOLD SIZE (Min.)
Models: 502, 752, 1002, & 1302
Number of Units GPM
Diameter
(in.)
1 75 2 1/2
COMMON MANIFOLD SIZE (Min.)
Models: 1501, 1701, & 2001
Number of Units GPM
Diameter
(in.)
1 90 2 1/2
37
4 Water connections (continued)
Installation & Operation Manual
Page 38
Figure 4-4_Primary/Secondary Piping of Multiple Boilers
COMMON MANIFOLD SIZE (Min.)
Models: 502, 752, 1002, & 1302
Number of Units GPM
Diameter
(in.)
2 150 3 1/2
3 225 4
4 300 5
5 375 6
6 450 6
7 525 6
8 600 8
COMMON MANIFOLD SIZE (Min.)
Models: 1501, 1701, & 2001
Number of Units GPM
Diameter
(in.)
2 180 4
3 270 5
4 360 6
5 450 6
6 540 6
7 630 8
8 720 8
4 Water connections
38
Installation & Operation Manual
Page 39
Figure 4-5_Boiler with Low Temperature Bypass Piping - Using a Thermostatic Mixing Valve Required for Systems Operating at less than 140°F (60°C) Return Water Temperatures from the Heating Return Loop
COMMON MANIFOLD SIZE (Min.)
Models: 502, 752, 1002, & 1302
Number of Units GPM
Diameter
(in.)
1 75 2 1/2
COMMON MANIFOLD SIZE (Min.)
Models: 1501, 1701, & 2001
Number of Units GPM
Diameter
(in.)
1 90 2 1/2
39
4 Water connections (continued)
Installation & Operation Manual
Page 40
Figure 4-6_Primary/Secondary Piping with Buffer Tank
NOTICE
The Inlet/Outlet System tappings are shown in the optional location on the side of the tank for pictorial purposes. The standard location for the system tappings is 180° from the recirculation tappings.
COMMON MANIFOLD SIZE (Min.)
Models: 502, 752, 1002, & 1302
Number of Units GPM
Diameter
(in.)
2 150 3 1/2
3 225 4
4 300 5
5 375 6
6 450 6
7 525 6
8 600 8
COMMON MANIFOLD SIZE (Min.)
Models: 1501, 1701, & 2001
Number of Units GPM
Diameter
(in.)
2 180 4
3 270 5
4 360 6
5 450 6
6 540 6
7 630 8
8 720 8
4 Water connections
40
Installation & Operation Manual
Page 41
For Example: Night Setback of the system loop water temperature, Night Shutdown and Weekend Shutdown of the entire boiler / heating system, and Indoor / Outdoor Air Reset of the system loop water temperature. If any of these Building Management System control functions are being utilized on the hydronic heating system, some type of low return water protection MUST BE provided.
If the boiler heating system will be used on a Water Source Heat Pump System, Radiant Floor Heating System, Snow Melting Heating System, etc., some type of low return water protection must be provided.
Condensation can cause operational problems, bad combustion, sooting, flue gas spillage and reduced service life of the vent system and related components.
To prevent the system return water temperature below 140°F (60°C) from entering the boiler inlet, an electrically actuated 3-way mixing valve is available, consult manufacturer for kit availability (see FIG. 4-5 on page 39). By using this valve, the SMART SYSTEM control will bypass outlet water back into the inlet of the boiler to maintain the inlet temperature above 140°F (60°C).
A fast acting, self contained mixing valve, set to 140°F (60°C), may also be used. The installation of this valve must be done as shown in FIG. 4-5. This arrangement will maintain the required flow through the boiler.
When a mixing valve is used, an optional system return sensor should be installed into the system return piping. This will allow the display of the actual system return temperature, and will also allow control of the system return temperature when the SMART SYSTEM control is programmed for inlet temperature control. As always, installation of the system supply sensor is strongly recommended as well. This will reduce the potential for short cycling of the boiler, and provide more responsive temperature regulation, even when the SMART SYSTEM control is programmed for inlet temperature control.
CAUTION
A boiler allowed to operate at set point temperatures below the specified minimum settings may experience operational problems with the operating controls and safety switches, obstruction of the flue gas passages on the heat exchanger, incomplete combustion and possible flue gas spillage. Operation at lower than specified water temperatures may cause hazardous conditions that result in non-warrantable damage to the appliance.
Three way valves in system
The installation of a three way valve on this boiler is not generally recommended because most piping methods allow
the three way valve to vary flow to the boiler. This boiler is a low mass, high efficiency appliance which requires a constant water flow rate for proper operation. Low flow rates can result in overheating of the boiler water which can cause short burner cycles, system noise, relief valve discharge and in extreme cases, a knocking flash to steam. These conditions can cause operational problems and non-warrantable failures of the boiler.
Radiant floor and snow melt heating systems
This type of heating boiler application operates in a low temperature range which requires a boiler bypass as described under the Low Temperature Bypass Requirements section. A non-metallic rubber or plastic tubing installed in a radiant (in floor) system must have an oxygen barrier to prevent oxygen from entering the system through the walls of the installed tubing. Excessive oxygen absorption into the system will result in an accelerated rate of corrosion causing a sludge buildup. This excessive corrosion will also damage the boiler and system components. Sludge formed as the result of excessive oxygen in the system can restrict water flow resulting in a premature boiler failure. Any boiler damage due to excessive oxygenation is non-warrantable.
TABLE - 4A
MAXIMUM FLOW FOR HEATING BOILER
The maximum flow rate through the boiler with a copper
heat exchanger must not exceed the following:
Model Maximum Flow
502, 752, 1002, and 1302 75 GPM
1501, 1701, and 2001 90 GPM
If higher flow rates are required through the boiler, an optional Cupro-Nickel heat exchanger is available. Consult the factory for specific application requirements.
Minimum boiler water temperatures
Inlet water temperatures below the specified minimum of 140°F (60°C) can excessively cool the products of combustion resulting in condensation on the heat exchanger. Condensation on the heat exchanger can cause operational problems, bad combustion, sooting, flue gas spillage and reduced service life of the related components. See the Low Temperature Bypass Requirements section for boiler system applications below the minimum specified temperature.
Low temperature bypass requirements
To prevent condensation problems, a boiler MUST NOT be operated (other than for brief periods during initial system startup) with an inlet water temperature of less than 140°F (60°C). If normal system return temperatures are less than the required 140°F (60°C) boiler inlet requirement, a method of low return water temperature protection MUST BE provided to protect the boiler.
41
4 Water connections (continued)
Installation & Operation Manual
Page 42
42
Installation & Operation Manual
The installer must ensure that the boiler is supplied with adequate flow without excessive temperature rise. It is recommended that this boiler be installed with a bypass in the piping if the maximum recommended flow rate is exceeded. The bypass will help to ensure that the boiler can be supplied with adequate water flow. Flow rates exceeding the maximum recommended flow will result in erosion of the boiler tubes. A typical bypass with a valve as shown in FIG. 4-5 will allow control of boiler flow.
TABLE - 4C
BOILER TEMPERATURE RISE AT MAXIMUM FLOW
Temperature Rise at Full Rate Fire, 75 and 90 GPM
Maximum Flow
Model Temperature Rise
502 11°F (6.1°C) 752 17°F (9.4°C)
1002 23°F (12.8°C)
1302 30°F (16.7°C)
1501 28°F (15.6°C)
1701 32°F (17.8°C)
2001 38°F (21.1°C)
Boiler bypass requirements
TABLE - 4B
SYSTEM TEMPERATURE RISE CHART
Temperature Rise and Head Loss Based on Boiler Output in Btu/hr
Btu/hr 30°F ΔT 35°F ΔT 40°F ΔT 45°F ΔT 50°F ΔT 55°F ΔT 60°F ΔT
Input Output GPM Ft/hd GPM Ft/hd GPM Ft/hd GPM Ft/hd GPM Ft/hd GPM Ft/hd GPM Ft/hd
500,000 435,000 29.0 0.9 24.9 0.7 21.8 0.5 19.3 0.4 17.4 0.3 15.8 0.2 14.5 0.1
750,000 652,500 43.5 2.1 37.3 1.8 32.6 1.3 29.0 1.0 26.1 0.8 23.7 0.7 21.8 0.6
1,000,000 870,000 58.0 4.8 49.7 3.3 43.5 2.4 38.7 2.0 34.8 1.6 31.6 1.2 29.0 1.1
1,300,000 1,131,000 75.4 9.8 64.7 6.9 56.6 4.6 50.3 3.6 45.3 2.9 41.1 2.2 37.7 1.9
1,500,000 1,275,000 87.9 9.8 75.3 7.7 65.9 6.3 58.6 5.2 52.9 4.2 47.9 3.3 43.9 2.7
1,700,000 1,445,000 99.6* 14.1 85.4 10.2 74.7 7.9 66.4 6.5 59.8 5.3 54.3 4.6 49.8 3.9
2,000,000 1,700,000 117.2* 20.2 100.4* 14.9 87.9 11.9 78.1 9.2 70.3 7.2 63.9 6.4 58.6 5.2
*Cupro-Nickel Heat Exchanger Required at Flows Above 75 GPM on Models 502 - 1302 and above 90 GPM on Models 1501 - 2001.
Temperature / pressure gauge
This boiler is equipped with a dial type temperature / pressure gauge. This gauge is factory installed in the outlet side of the boiler piping. The gauge has one scale to read system pressure and a separate scale to read water temperature in degrees Fahrenheit. The temperature / pressure gauge is provided to meet code requirements. Water temperatures can be more accurately monitored from the data provided in the digital display in the Operator Interface.
Typical heating boiler installations
General plumbing rules:
1. Check all local codes.
2. For serviceability of boiler, always install unions.
3. Always pipe pressure relief valve to an open drain.
4. Locate system air vents at highest point of system.
5. Expansion tank must be installed near the boiler and on the suction side of the system pump.
6. Support all water piping.
Installation with a chilled water system
Pipe refrigeration systems in parallel. Install duct coil downstream at cooling coil. Where the hot water heating boiler is connected to a heating coil located in the air handling units which may be exposed to refrigeration air circulation, the boiler piping system must be equipped with flow control valves or other automatic means to prevent gravity circulation of the boiler water during the cooling cycle.
The coil must be vented at the high point and hot water from the boiler must enter the coil at this point. Due to the fast heating capacity of the boiler, it is not necessary to provide a ductstat to delay circulator operation. Also, omit thermostat flow checks as the boiler is cold when heating thermostat is satisfied. This provides greater economy over maintaining standby heat.
4 Water connections
Page 43
5 Electrical connections
Boiler operating control module
The operating temperature control for the appliance is the SMART SYSTEM control module. It is located on the inside of the control panel, behind the front access door. Access to adjust the temperature set point and other user adjustable points is made through the Operator Interface located on the right front access door. The outlet sensor is placed in a bulbwell installed in the outlet side of the heat exchanger top header. The inlet sensor is located in a bulbwell on the inlet side of the heat exchanger top header.
The operating sensor, inlet or outlet, is selectable from the screen in the Operator Interface.
The exact temperature set point is based on your system’s requirements. Set the control set point(s) to the desired operating water temperature.
The maximum temperature set point that can be programmed into the standard control module from the Operator Interface on a heating boiler is 220°F (104.4°C). The manual reset high limit control for a heating boiler is adjustable up to a fixed maximum setting of 230°F (110°C).
The maximum temperature set point for a water heater is 190°F (88°C). The auto reset high limit is fixed at 200°F (93°C), and the adjustable manual reset high limit has a maximum setting of 230°F (110°C).
A 120 VAC, 15 Amp, 1 ph, 60 Hz circuit is required for operation of the appliance controls.
The appliance, when installed, must be electrically grounded in accordance with the requirements of the authority having jurisdiction or in the absence of such requirements, with the latest edition of the National Electrical Code ANSI/NFPA No.
70. When the unit is installed in Canada, it must conform to the CAE C22.1, Canadian Electrical Code, Part I and/or local Electrical Codes. Multiple units connected in a Cascade must be grounded to the same ground connection.
1. All wiring between the appliance and field installed devices shall be made with type T wire [63°F (35°C) rise].
2. All line voltage wire exterior to the appliance must be enclosed in approved conduit or approved metal clad cable.
3. The circulating pump must run continuously when the appliance is being fired.
4. To avoid serious damage, DO NOT energize the appliance until the system is full of water. Ensure that all air is removed from the heat exchanger and piping before beginning initial operation. Serious damage may result if the appliance is operated without proper flow.
5. Provide the appliance with proper overload protection.
TABLE - 5A
AMP DRAW DATA
Model
Blower &
Controls
Pump FLA*
Approximate Total
Amps @ 120 VAC
502 6.7 8.8 15.5
752 6.7 8.8 15.5 1002 6.7 8.8 15.5 1302 6.7 8.8 15.5 1501 6.5 8.8 15.3 1701 6.5 8.8 15.3 2001 6.5 8.8 15.3
*Standard Pump Supplied with Water Heaters Only
ELECTRICAL SHOCK HAZARD – For your safety, turn off electrical power supply before making any electrical connections to avoid possible electric shock hazard. Failure to do so can cause severe personal injury or death.
Wiring must be N.E.C. Class 1.
If original wiring as supplied with the boiler must be replaced, use only type 105°C wire or equivalent.
Boiler must be electrically grounded as required by National Electrical Code ANSI/NFPA 70 – latest edition.
Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.
WARNING
NOTICE
CAUTION
Installation must comply with:
1. National Electrical Code and any other national, state, provincial, local codes, or regulations.
2. In Canada, CSA C22.1 Canadian Electrical Code Part 1, and any local codes.
Line voltage connections
1. Connect 120 VAC power wiring to the line voltage terminal strip in the junction box, as shown in FIG. 5-1.
2. Provide and install a fused disconnect or service switch (15 AMP recommended) as required by the code (see FIG. 5-1).
3. To activate a system pump, wire as shown in FIG. 5-1. If the motor is larger than 1 HP, you must install a contactor.
4. When connecting power to units which are to be cascaded, each unit must be connected to the same ground connection.
43
Installation & Operation Manual
Page 44
44
Installation & Operation Manual
5 Electrical connections
Figure 5-1_Line Voltage Field Wiring Connections
Low voltage connections
1. Route all low voltage wires through the knockouts in the rear of the heater, as shown in FIG. 5-2.
2. Connect low voltage wiring to the low voltage connection board as shown in FIG. 5-4 on page 46 of this manual and the heater wiring diagram.
Figure 5-2_Routing Field Wiring
EMS or remote thermostat
connection
An EMS, remote thermostat or other remote temperature control may be connected to the boiler (see FIG. 5-3). Follow the manufacturer’s instructions supplied with the remote temperature control for proper installation and adjustment. Connection of a set of dry switching contacts or a remote on/off thermostat to the low voltage connection board will allow the unit to be switched on and off by making or breaking a 24 VAC control circuit. Remove the factory jumper between the enable terminals on the low voltage connection board and connect the remote temperature control in its place, see FIG. 5-4 on page 46.
Figure 5-3_Remote ON/OFF Wire Connection
Ensure that all wiring used to connect the switching contacts of the remote temperature controller to the connection board are a minimum of 18 gauge and have a maximum installed length of 300 feet (91.4m). Set the SMART SYSTEM control to a set point temperature slightly higher than the setting of the remote temperature control. This will ensure that the remote temperature controller functions as the operating control for the heater.
DHW (Domestic Hot Water) thermostat
1. Connect the DHW tank thermostat (FIG. 5-4) to the tank thermostat terminals on the connection board.
DHW tank sensor
If a tank sensor is used, it must be connected to the tank sensor terminals on the low voltage connection board. The correct Lochinvar sensor (TST2032) MUST BE USED.
Page 45
Installation & Operation Manual
5 Electrical connections (continued)
45
Louver proving switch
1. When the operation of a louver proving switch needs to be verified before the boiler fires, remove the jumper wire from these terminals and connect them to the normally open contacts on its proving switch (FIG. 5-4).
System supply sensor
1. By installing the system supply sensor into the supply of the primary loop, the temperature of the primary supply can be controlled. The SMART SYSTEM control automatically detects the presence of this sensor, and controls the boiler firing rate to maintain the system supply temperature to the set point (if the outlet sensor control is currently selected).
2. Connect these terminals to the system supply sensor (FIG. 5-4).
System return sensor
1. By installing the system return sensor into the return of the primary loop, the temperature of the primary return can be sensed when a 3-way valve or other device is installed ahead of the heater inlet. The SMART SYSTEM control automatically senses the presence of this sensor. If the inlet sensor is selected as the controlling sensor, the SMART SYSTEM control will adjust the firing rate to hold the system return temperature to the set point. It is strongly recommended that the system supply sensor be installed as well.
2. Connect these terminals to the system return sensor (FIG. 5-4).
Boiler Management System (BMS)
1. An external control may be connected to control either the firing rate or the set point of the appliance. Connect the 0 ­10 VDC terminals to the 0 - 10 VDC output of the external control. The SMART SYSTEM control can be programmed to use the enable output of the Boiler Management System, or use the voltage signal to enable the heater. Connect the enable terminals to the enable output of the BMS, when used.
2. Make sure the ground terminal is connected to the ground output terminal of the external control, and the 0 - 10 VDC terminal is connected to the 0 - 10 VDC terminal of the external control.
Runtime contacts
The SMART SYSTEM control closes a set of dry contacts whenever the burner is running. This is typically used by Building Management Systems to verify that the boiler is responding to a call for heat.
Alarm contacts
The SMART SYSTEM control closes another set of contacts whenever the heater is locked out or the power is turned off. This can be used to turn on an alarm, or signal a Building Management System that the boiler is down.
Wiring of the cascade
When wiring the heaters for Cascade operation, select one heater as the Leader heater. The remaining heaters will be designated as Members. See page 52 Configuration of the Cascade for a detailed explanation of this procedure.
On boilers, connect the system supply sensor and outdoor air sensor (if used) to the Leader boiler. The location of the system supply sensor should be downstream of the boiler connections in the main system loop (FIG.’s 4-3 and 4-6). The system supply sensor should be wired to the low voltage connection board at the terminals marked for the system supply sensor (see FIG. 5-4). The Leader control will use the water temperature at the system supply sensor to control the operation of the Cascade.
If outdoor air reset is desired, the outdoor air sensor should be wired to the low voltage connection board at the terminals marked for the outdoor air sensor (FIG. 5-4). If the outdoor air sensor is connected, the Leader control will calculate the water temperature set point based on the programmed reset curve parameters. If the outdoor air sensor is not connected, the Leader control will maintain the space heating (SH) set point that is programmed into the control.
If a Thermostat, Zone Control enable output, or Building Management System enable output are available, it should be wired to the low voltage connection board on the Leader boiler at the enable terminals. If the boilers are to run continuously, leave the jumper wire between the enable terminals. This will initiate a call for heat on the Cascade. Also, leave the jumpers on the enable terminals of all the Member heaters. This will allow them to run independently should the Leader heater fail.
On water heaters, connect the tank thermostat or BMS enable output to the low voltage connection board on the Leader heater, at the terminals marked for the tank thermostat. If a tank sensor is used, connect this sensor to the low voltage connection board on the Leader heater, at the terminals marked for the tank sensor.
Communication between the Leader heater and the Member heaters is accomplished by using shielded, 2-wire twisted pair communication cable. Connect one of the twisted pair wires to terminal A on each of the low voltage connection boards, and the other wire of the twisted pair to terminal B on each of the low voltage connection boards. Connect the shield wire to the shield ground terminal on all of the heaters. If more than two heaters are on the Cascade, daisy chain the wiring from the Cascade terminals on the second heater to the Cascade terminals on the third heater, then from the third to the forth, and so on. The connections can be made in any order, regardless of the addresses of the heaters. Try to keep each cable as short as possible.
Page 46
Figure 5-4_Low Voltage Field Wiring Connections
5 Electrical connections
46
Installation & Operation Manual
Page 47
47
Condensate trap installation
1. Locate the condensate trap kit shipped loose with the
appliance. The kit includes a sheet metal mounting base, two (2) nuts and the condensate trap.
2. Install the condensate trap mounting base on the rear
of the appliance in the lower left-hand corner as depicted in FIG. 6-1. Use the pre-drilled holes on the appliance to secure the mounting base to the appliance.
3. Secure the condensate trap to the base using the two (2)
nuts supplied with the kit. The trap should be oriented so that the barb connections are pointing toward the appliance (FIG. 6-1).
4. Use a level to ensure that the condensate trap is level on
its base. Failure to keep the condensate trap level can result in the spillage of flue products from the condensate trap.
5. Locate the two hoses exiting the back of the appliance.
Attach the larger hose on the appliance to the lower barb connection on the condensate trap. Secure the hose to the barb with a field supplied hose clamp (FIG. 6-1).
6. Attach the smaller hose on the unit to the upper barb
connection on the condensate trap. Secure the hose to the barb connection with a field supplied hose clamp (FIG. 6-1).
7. Route the 3-pin wiring harness from the condensate
trap to the matching connector on the lower back of the appliance as shown in FIG. 6-1. This is the blocked drain safety switch. This switch will shut the appliance off if the condensate trap becomes too full of liquid.
8. Remove the four (4) screws securing the top cover to
the condensate trap and remove the cover (FIG. 6-1).
9. Locate the plastic ball inside the float tube. Verify there
is nothing under the ball causing it to not seat properly (FIG. 6-1).
10. Fill with fresh water until the water begins to pour out
of the drain.
11. Replace the cover.
12. Replace the four (4) screws removed in Step 8.
13. A 1/2" pipe connection is supplied on the condensate
trap. Connect a suitable pipe or tube to this connection (see FIG. 6-1).
Figure 6-1_Install Condensate Trap
14. Slope the condensate line down and away from the appliance into a drain or condensate neutralizing filter. Do not expose the condensate line to freezing temperatures.
Use a level to ensure that the condensate trap is level on its base. Failure to keep the condensate trap level can result in the spillage of flue products from the condensate trap.
Failure to follow this warning could result in product damage or improper operation, personal injury, or death.
WARNING
NOTICE
Use materials approved by the authority having jurisdiction. In the absence of other authority, PVC and CPVC pipe must comply with ASTM D1785 or D2845. Cement and primer must comply with ASME D2564 or F493. For Canada use CSA or ULC certified PVC or CPVC pipe, fittings, and cement.
NOTICE
The condensate line must remain unobstructed, allowing free flow of condensate. If condensate is allowed to freeze in the line or if the line is obstructed in any other manner, the blocked drain safety switch will prevent the appliance from firing.
6 Condensate disposal
Installation & Operation Manual
Page 48
48
Check/control water chemistry
Do not use petroleum-based cleaning or sealing compounds in the boiler system. Damage to elastomer seals and gaskets in the system could occur, resulting in substantial property damage.
Hardness less than 7 grains
1. Consult local water treatment companies for hard water areas (above 7 grains hardness).
Chlorine concentration less than 200 ppm
1. Do not fill boiler or operate with water containing chlorine in excess of 200 ppm.
2. Filling with chlorinated fresh water should be acceptable since drinking water chlorine levels are much lower.
3. Do not use the boiler to directly heat swimming pool or spa water.
Test/replace freeze protection fluid
1. For systems using freeze protection fluids, follow fluid manufacturer’s instructions.
2. Freeze protection fluid must be replaced periodically due to degradation of inhibitors over time. Follow all fluid manufacturer’s instructions.
Freeze protection (when used)
1. Determine freeze protection fluid quantity using system
water content, following fluid manufacturer’s instructions. Appliance water content is listed on page 5. Remember to include expansion tank water content.
2. Local codes may require a backflow preventer or actual
disconnect from city water supply.
3. When using freeze protection fluid with automatic fill,
install a water meter to monitor water makeup. Freeze protection fluid may leak before the water begins to leak, causing concentration to drop, reducing the freeze protection level.
Fill and test water system
1. Fill system only after ensuring the water meets the requirements of this manual.
2. Close manual and automatic air vents and boiler drain valve.
3. Fill to correct system pressure. Correct pressure will vary with each application.
a. The minimum cold water fill pressure should be
12 PSI.
b. Pressure will rise when boiler is turned on and
system water temperature increases.
Eliminate all system leaks. Continual fresh makeup water will reduce boiler life. Minerals can build up in the heat exchanger, reducing heat transfer, overheating the heat exchanger, and causing heat exchanger failure.
Purge air from water system
1. Purge air from system: a. Connect a hose to the purge valve (see purge/drain
valves, in the piping diagrams on pages 37 -40). Route the hose to an area where water can drain and be seen.
b. Close the boiler or system isolation valve between
the purge valve and fill connection to the system. c. Close zone isolation valves. d. Open quick-fill valve on cold water makeup line. e. Open purge valve. f. One zone at a time, open the isolation valves. Allow
water to run through the zone, pushing out the air.
Run until no noticeable air flow is present. Close the
zone isolation valves and proceed with the next zone.
Follow this procedure until all zones are purged. g. Close the quick-fill water valve and purge valve and
remove the hose. Open all isolation valves. Watch
that system pressure rises to correct cold-fill
pressure. h. After the system has operated for a while, eliminate
any residual air by using the manual air vents located
throughout the system. i. If purge valves are not installed in the system, open
the manual air vents in the system one at a time,
beginning with the lowest floor. Close the vent when
water squirts out. Repeat with remaining vents.
2. Open automatic air vent (diaphragm-type or bladder-type expansion tank systems only) one turn.
3. Open other vents: a. Starting on the lowest floor, open air vents one at a
time until water squirts out.
b. Repeat with remaining vents.
4. Refill to correct pressure.
4. At initial fill and during boiler startup and testing, check system thoroughly for any leaks. Repair all leaks before proceeding further.
WARNING
CAUTION
7 Start-up
Installation & Operation Manual
Page 49
49
Check for gas leaks
Before starting the boiler, and during initial operation, smell near the floor and around the boiler for gas odorant or any unusual odor. Remove the front access panel and smell the interior of the boiler enclosure. Do not proceed with startup if there is any indication of a gas leak. Use an approved leak detection solution. Repair any leaks at once.
WARNING
Figure 7-1_Condensate Trap
Propane boilers only – Your propane supplier mixes an odorant with the propane to make its presence detectable. In some instances, the odorant can fade, and the gas may no longer have an odor. Before startup (and periodically thereafter), have the propane supplier verify the correct odorant level in the gas.
WARNING
Inspect/fill condensate system
Inspect/check condensate lines and fittings
1. Inspect the condensate drain line, condensate PVC fittings and condensate trap.
Fill condensate trap with water
1. Remove the four (4) screws securing the top cover to the condensate trap and remove the cover (FIG. 7-1).
2. Locate the plastic ball inside the float tube. Verify there is nothing under the ball causing it to not seat properly.
3. Fill with fresh water until the water begins to pour out of the drain.
4. Replace the cover.
5. Replace the four (4) screws removed in Step 1.
The condensate trap (FIG. 7-1) must be filled with water during all times of boiler operation to avoid flue gas emission from the condensate drain line. Failure to fill the trap could result in severe personal injury or death.
WARNING
Check thermostat circuit(s)
1. Disconnect the two external wires connected to the enable terminals on the connection board.
2. Connect a voltmeter across these two incoming wires. Close each thermostat, zone valve, and relay in the external circuit one at a time and check the voltmeter reading across the incoming wires.
3. There should NEVER be a voltage reading.
4. If a voltage does occur under any condition, check and correct the external wiring. (This is a common problem when using 3-wire zone valves.)
5. Once the external thermostat circuit wiring is checked and corrected if necessary, reconnect the external thermostat circuit wires to the connection board. Allow the boiler to cycle.
7 Start-up (continued)
Check vent and air piping
1. Inspect vent piping and air piping for signs of deterioration from corrosion, physical damage or sagging. Verify air piping and vent piping are intact and correctly installed per this manual.
Placing the boiler in operation
Boiler operational checks
2. Turn the boiler main power switch to the “ON” position.
3. Verify operation of the SMART SYSTEM control module and Operator Interface.
4. Program the adjustable points from the Operator Interface.
5. Push the reset for the low water cutoff (if equipped).
6. Ensure that maximum flow to the boiler does not exceed 75 GPM on Models 502 - 1302 and 90 GPM on Models 1501- 2001. Verify by checking temperature rise while burner is firing at 100% of rated input.
7. Install a manometer on the gas supply to the boiler and verify minimum gas supply pressure as the burner fires at 100% of rated input.
8. Verify operation of safeties as necessary (low water cutoff, high limit, gas pressure, etc.,).
9. Verify that all adjustable points in the Operator Interface are set as required.
Installation & Operation Manual
Page 50
50
Boiler operation
10. Boiler should begin the start-up process for the sequence of operation.
11. The boiler will ignite at the proper ignition speed and will then modulate (B9/M9 models only) to meet the system demand.
12. Ensure that inlet water temperature does not fall below the specified minimum for the boiler.
13. Based on system demand, B9/M9 boilers may run for an extended period of time at a reduced rate of input to maximize efficiency.
14. As system demand is satisfied, the burner will cycle off and the combustion air blower will run for a post purge operation before the boiler shuts down.
Start the boiler
1. Read and follow the Operating instructions in FIG. 7-2, on
page 51.
If boiler does not start correctly
1. Check for loose connections, blown fuse or service switch
off?
2. Is external limit control (if used) open? Is boiler water
temperature above 200°F (93.3°C)?
3. Is thermostat set below room temperature?
4. Is gas turned on at meter or boiler?
5. Is incoming gas pressure less than 4 inches water column?
If none of the above corrects the problem, refer to the Troubleshooting section of the Power-fin Service Manual.
The venting system must be installed so that it will prevent flue gas spillage and carbon monoxide emissions, which will result in severe personal injury or death.
WARNING
7 Start-up
Verify space heat circulator mode
The Space Heating Mode controls both the system (primary) pump (if connected), and the boiler (secondary) pump. When the SMART SYSTEM control receives a space heating call for heat, it turns on the system pump. If the boiler is not heating an indirect DHW (Domestic Hot Water) tank, it also turns on the boiler pump. After the space heating call for heat ends, the system pump continues to run for a short period of time. If the boiler pump was running, it continues to run for a short period of time as well. These pump delays are factory set to 30 seconds. If different delays are desired, the appropriate parameters in the control must be changed. See the Power-fin Service Manual for a detailed explanation of this procedure.
Set space heating set point temperature
The UP and DOWN keys may be used during normal operation to adjust the space heating set point temperature (see FIG. 8-1 on page 58 of this manual). Once the desired temperature is displayed, press the ENTER/RESET key to save the new setting. If the ENTER/RESET key is not pressed, the new setting will be used for the current heating cycle only. The old setting will become active after the current heating cycle ends.
Set space heating operation (boiler only)
Determine controlling sensor
For space heating systems, the temperature control can be based on one of four sensors; the inlet, outlet, system supply sensor, or system return sensor. The SMART SYSTEM control is programmed at the factory to control the temperature of the outlet sensor. The control will automatically switch to the system supply sensor once it is connected. If it is desired to base the temperature control on the inlet sensor, the appropriate parameter must be changed in the control. See the Power-fin Service Manual for a detailed explanation of this procedure. The control will automatically switch to the system return sensor once it is connected. It is recommended that a system supply sensor be installed even when using the inlet sensor as the controlling sensor.
Set DHW operation
Verify DHW circulator mode (boiler only)
The DHW Mode is programmed to heat an indirect domestic hot water tank. When the tank thermostat or tank sensor calls for heat, the SMART SYSTEM control will turn on the DHW pump and turn off the boiler pump (if running). If the system pump is running, it will remain on. When the DHW call for heat ends, and there is no space heating call for heat, the DHW pump will continue to run for a period of time. This pump delay is set at the factory to 30 seconds. If a shorter or longer delay is desired, the appropriate parameter in the control must be changed. See the Power-fin Service Manual for a detailed explanation of this procedure. If there is an active space heating call for heat, then the boiler pump will be turned on and the DHW pump will be turned off.
Set outlet target temperature (boiler only)
When in the DHW Mode, the control will modulate to maintain the outlet temperature to a set point. This set point is set at the factory to 180°F (82.2°C). If a different set point is desired, the appropriate parameter in the control must be changed. See the Power-fin Service Manual for a detailed explanation of this procedure.
Set tank target temperature
If a tank sensor is used, the tank set point can be adjusted by pressing either the UP or DOWN key. A menu will appear on the LCD display. Press the DOWN key to select the tank set point, and press ENTER. Use the UP and DOWN keys to adjust the set point. Press the ENTER key again to save the new set point and return to the normal display.
Installation & Operation Manual
Page 51
Figure 7-2_Operating Instructions
51
7 Start-up (continued)
Installation & Operation Manual
Page 52
52
Configuration of the cascade
When installed in a Cascade system, the individual controls must be programmed for cascade operation. This is accomplished by accessing the control parameters.
Input the Installer code as described in the Power-fin Service Manual. Once the control parameters have been accessed, use the DOWN arrow key to select the H Control Mode parameters. Press the ENTER key to access these parameters. Use the UP arrow key to access parameter H4 Cascade. Press the ENTER key to access this parameter. Use the DOWN arrow key to select Enable. Press the ENTER key to program this into the control. Press the EXIT key, then press the DOWN key until I Cascade is selected.
Press the ENTER key to select the parameter I1 BLR Address. Press the ENTER key to access this parameter. Each unit in the Cascade system must be programmed with its own address. The unit designated as the Leader will have an address of 0. The remaining units in the Cascade will be Members and have addresses from 1 - 7. Use the UP and DOWN arrow keys to select the appropriate address. Press the ENTER key to program this into the control.
Press the MENU key twice to exit the control parameters. Repeat this procedure for all appliances in the Cascade, designating the Leader control and the Member controls.
Set clock
The SMART SYSTEM control has a built-in clock that it uses for its night setback feature and for logging events. This clock must be set when the appliance is installed, and anytime the appliance has been powered off for more than one month. Use the following procedure to set the clock:
1. Press and hold the MENU key (FIG. 8-1) for at least 5 seconds.
2. The display changes to ready “ENTER MENU CODE”, with four (4) zeros below it.
3. Change the zeros to match the user code (factory set at “0704”). Use the UP and DOWN keys to increment or decrement the flashing digit, and the NEXT and PREVIOUS keys to select which digit flashes.
4. Press the ENTER key.
5. The display changes to read USER CODE for a few seconds, then displays a menu.
6. Press the ENTER key.
7. Press the UP key twice to display “A3 DATE AND TIME”.
8. Press the ENTER key once.
9. The date and time are displayed as “YY:MM:DD W hh:mm”, where: mm: minutes hh: hour (24 hour time; e.g., 2:00 PM = 14:00) W: day of the week (1 = Sunday, 2 = Monday,
3 = Tuesday, etc.,) YY: year MM: month DD: date
NOTICE
The internal clock does not adjust for Daylight Savings Time and therefore, will require a manual adjustment.
Use the UP and DOWN keys to increment or decrement the flashing number, and the NEXT and PREVIOUS keys to select which number flashes.
10. Press the ENTER key to save the setting.
11. Press the MENU key twice to exit the Programming Mode.
7 Start-up
Installation & Operation Manual
Page 53
53
General
How the appliance operates
The Power-fin uses a copper finned tube heat exchanger to transfer heat from the flue products to the water. An electronic control module monitors various inputs to initiate a call for heat. The blower provides both primary and secondary air to the burner and forces the flue products out of the combustion chamber and into the vent system. The control module regulates the blower speed to control the firing rate of the unit. The modulating gas valve monitors the amount of combustion air being pulled into the blower and regulates the amount of gas supplied, which then mixes with the combustion air and is supplied to the burner.
0 - 10V input (set point or power)
The Power-fin can be controlled by a Building Management System (BMS) using a 0 - 10 VDC signal. The control can be configured by the installer to use this signal to either control set point or firing rate.
DHW priority (boiler only)
The SMART SYSTEM control module allows connection of a DHW thermostat or tank sensor to the low voltage connection board. When the DHW thermostat or tank sensor calls for heat, the module activates the DHW pump, shuts down the boiler pump, and immediately sets the target outlet water temperature to 180°F (82.2°C). This provides automatic priority heat allocation to the indirect water heater for maximum response and recovery. The DHW pump continues for 30 seconds after the heating cycle to deliver the most possible heat.
DHW / SH (space heating) cycling (boiler only)
If an indirect DHW call for heat is received while a space heating call is in progress, the control will start the DHW pump and shut the boiler pump off. The system pump will remain on. If the space heating call is still active while the DHW call is in operation, the control will wait for 30 minutes (time adjustable by installer) then it will switch back to the space heating demand. The control will switch back and forth until one of the heat demands end.
Programmable controlling sensor (boiler only)
The control module is programmed to use the outlet sensor as the control sensor by default. If a system supply sensor is connected, the control automatically uses it as the control sensor. The control sensor can be changed by the installer to the inlet sensor. In this case, if a system return sensor is installed, the control automatically uses it as the control sensor. If the inlet sensor is chosen as the controlling sensor, it is recommended that the system supply sensor be installed for the best system performance.
Anti-cycling (boiler only)
After the set point has been satisfied, the control will delay the next burner cycle for a set time period (time is adjustable by the installer). The time delay will be bypassed if the system return temperature drops too far during the delay.
Boiler, system, and DHW pump control
When a space heating call for heat starts and no DHW call is on, the system and boiler pumps are turned on. As long as the space heating call for heat is on, the system pump will remain on. If a DHW call for heat is on, the boiler pump will wait to turn on until just before the DHW pump turns off. After the space heating call for heat ends, both pumps will run for an additional period of time.
When a DHW call for heat starts, the DHW pump is turned on. If a space heating call for heat was on, the boiler pump will turn off a few seconds after the DHW pump turns on.
NOTICE
If an inline high gas pressure regulator is used, it MUST BE of the lockup type and be located a minimum of 10 feet from the appliance. Failure to do so may result in insufficient gas volume supplied to the appliance.
NOTICE
If a pressure drop of more than 2" water column occurs between Standby (static) Mode and Operating (dynamic) Mode, a gas volume problem exists. Contact the gas utility, gas supplier, qualified installer, or service agency to determine the necessary steps to provide the proper gas volume to the appliance.
How the control module operates
The SMART SYSTEM control module receives input from appliance sensors and external devices. The control module activates and controls the blower and gas valve to regulate heat input and switches the boiler, Domestic Hot Water (DHW), and system pumps on and off as needed. The user programs the module to meet system needs by adjusting control parameters. These parameters set operating temperatures and appliance operating modes. Boiler operation can be based on boiler outlet water temperature, boiler inlet water temperature, system supply temperature, or system return temperature, depending on the parameter setting. Water heater operation can be based on a tank sensor or a tank thermostat.
Control inputs and outputs
Enable
This input tells the boiler to provide water for space heating.
Tank thermostat
This input tells the boiler to provide water for heating a domestic hot water tank.
8 Operating information (continued)
Installation & Operation Manual
Page 54
54
Temperature control
Modulation
The Power-fin is capable of modulating its firing rate from a minimum of 20% (M9) or 60% (B9) to a maximum of 100%. The F9 model can only fire at 100%. The firing rate is dictated by the call for heat (i.e., space heating or domestic hot water), the heating load, ramp delay (if enabled), and various other temperature limitations.
Ramp delay (boiler only)
For systems with lower flow, the SMART SYSTEM can limit the firing rate (when enabled) when a space heating call for heat starts, or when switching from a DHW call for heat to a space heating call for heat. There are six (6) limits that can be programmed, as well as six (6) time intervals corresponding to each limit. The sixth limit will also limit the firing rate for the rest of the call for heat.
Gradient limiting
If during operation of the heater the outlet water temperature is rising too quickly, the control will reduce the firing rate to its lowest setting.
Outdoor air reset (boiler only)
With the outdoor air sensor connected, the control module will calculate the set point based on the programmed reset curve. The installer can change the slope of the reset curve by several adjustable parameters. The user can limit the maximum set point for the system using the space heating set point.
Boost function (boiler only)
If outdoor air reset is active, and a space heating demand has been active continuously for a set period of time (time adjustable by installer) and there has been no DHW demands, the control may be programmed to increase the set point by a fixed number of degrees (adjustable by installer). This process will repeat until the space heating demand ends, the set point reaches the programmed set point or a maximum of 20 increases has occurred. Once the system heat demand is satisfied, the set point will revert to the value determined by the reset curve.
Night setback
The controller may be programmed to reduce the space heating (boilers) and tank (water heaters) set points during a certain time each day. A start and stop time can be programmed for each day of the week.
Flame current support
To prevent nuisance shutdowns when the boiler is firing at minimum rates, the control will increase fan speed when the flame signal drops too low.
This feature of the SMART SYSTEM control module does not eliminate the possibility of freezing. The installer must still use recognized design, installation and maintenance practice to prevent freeze potential for the appliance and system.
CAUTION
Protection features
Outlet temperature, flue temperature, and temperature rise limiting
The outlet temperature is monitored by the boiler outlet temperature sensor. When the outlet temperature exceeds 215°F (85°C) (boilers) or 185°F (85°C) (water heaters), the unit will reduce the fan speed. If the outlet water temperature exceeds 225°F (107°C) (boilers) or 195° (90.6°C) (water heaters) the control will shut the unit down until it cools off.
The control module monitors the flue temperature by a sensor located in the flue exhaust. If the flue temperature exceeds 400°F (204°C) the control will reduce the maximum fan speed. If the flue temperature exceeds 450°F (232°C) the control will shut the unit down. The unit will restart automatically once the flue temperature drops 100°F (56°C) and the minimum off time has expired.
The control monitors the temperature difference between the inlet and the outlet sensor. If this difference exceeds 55°F (31°C) the control will reduce the fan speed. If the temperature difference exceeds 65°F (36°C) the control will shut the unit down. The unit will restart automatically once the temperature difference has dropped 10°F (6°C) and the minimum off time has expired.
Freeze protection
DO NOT install the appliance in a room likely to freeze.
The following integral feature of the SMART SYSTEM control module provides some protection for the appliance only -- not for the system.
• The SMART SYSTEM control module provides freeze-up protection as follows when the appliance water temperature drops below 45°F (7.2°C):
Below 45°F (7.2°C), the appliance and system pumps operate constantly.
Below 37°F (2.7°C), the appliance turns on.
Appliance and pumps turn off if appliance water temperature rises above 45°F (7.2°C).
High limit operations
When outlet temperature exceeds 230°F (110°C) (boilers) or 200°F (93°C) (water heaters), high limit action occurs. The appliance shuts down until the outlet water cools down and the RESET button on the Operator Interface is pressed.
8 Operating information
Installation & Operation Manual
Page 55
55
Run-time and alarm outputs
The appliance provides dry contacts for indicating when the appliance is running, and when it is unable to operate.
Run-time and cycle counting
The control uses two timers to monitor the total hours of burner operation. One timer monitors the time the appliance is firing under 50% of rate. The other timer monitors the time the appliance is firing over 50% rate.
The control uses four (4) ignition counters to monitor the amount of appliance cycles. The first counter counts all ignitions of the control. The second counter counts only ignition attempts that have failed. The third and fourth counters are the same as the first and second respectively, but can be reset by the installer.
Service reminder
The control can be programmed for service reminder notification. This notification will become active when either a set time frame has expired, or a set amount of running hours or cycles has expired (all adjustable by the installer). The display will alternate the standard text on the display screen with Service Due every 5 seconds. The service reminder notification can be reset by the installer.
Error logging
The control will hold in memory the last 10 error codes as well as the last 10 turn-off functions. The date and time of the occurrence will be recorded as well. Only the 10 most current occurrences will be held in memory.
Boiler temperature regulation
Operating temperature (target)
The SMART SYSTEM control module senses water temperature and regulates appliance firing and firing rate to achieve a target temperature. The target temperature can be set between 70°F (21°C) and 220°F (104°C) (boilers) or between 60°F (16°C) and 190°F (88°C) (water heaters).
• Target temperature is fixed when the outdoor
sensor is not installed (boilers).
• Target temperature is calculated as described
under “Outdoor Air Reset Operation” and “Boost Function” when the outdoor sensor is connected (boilers).
Outdoor reset operation, if used (boilers only)
Target temperature with outdoor reset
This feature improves the system’s efficiency as the outdoor temperature warms up.
See the Power-fin Service Manual to change the settings.
Reset curve
The reset curve looks at outdoor air temperature and adjusts the set point.
Cascade
When multiple appliances are installed, they can be wired together in a cascade sequence. A maximum of eight appliances can be controlled from a single control. In this application one appliance would be designated as the Leader control and all others would be designated as Member controls. The set point or firing rate can be controlled by the 0 - 10V input as well.
Once the Leader appliance receives a call for heat from a BMS, tank sensor, or external thermostat, the control will determine what the set point will be. A fixed temperature set point can be programmed into the control. See page 50 of this manual to program the set point.
On boilers, if the water temperature at the system sensor is less than the set point + the turn-off offset - the off-on differential, then the control will initiate a call for heat on the Cascade (see the Power-fin Service Manual for an explanation of the offset and differential). The Leader will energize the lead appliance on the Cascade. For a new startup this will be the Leader appliance.
On water heaters, if the water temperature at the tank sensor is less than the tank set point - the off differential, then the control will initiate a call for heat on the Cascade.
Monitor external limits
Connections are provided on the connection board for external limits such as a louver proving switch. The SMART SYSTEM will shut off the burner and inhibit relighting whenever any of these external limits open.
Low water cutoff protection
1. The SMART SYSTEM control module uses temperature sensing of both inlet and outlet areas of the heat exchanger. If the flow rate is too low or the outlet temperature too high, the control module modulates and shuts the appliance down. This along with the flow switch, ensures appliance shutdown in the event of low water or low flow conditions.
2. Some codes and jurisdiction may accept these integral features of the control in lieu of requiring an additional limit control or low water cutoff. Consult local jurisdiction to determine. Contact manufacturer for low water cutoff kit availability.
8 Operating information (continued)
Installation & Operation Manual
Page 56
56
The appliance will fire at its ignition speed and will then modulate its firing rate to maintain the set point (M9 and B9 only). If the first appliance reaches 100% of its firing rate, the Leader will calculate at what point the second appliance could fire at its minimum firing rate. At this point, the Leader will fire the second appliance on the Cascade. For a new startup, this would be the first Member appliance. The appliance will fire at its ignition speed and will then modulate its firing rate to maintain the set point (M9 and B9 only).
If the set point still cannot be met, the Leader will continue firing more Members until either the heat demand is met or all appliances on the Cascade are firing. As the heat demand decreases, the last appliance on will modulate down to its minimum firing rate (M9 and B9 only). Once the demand for that appliance is 0% it will shut down. As the heat demand decreases further, the second to last appliance will modulate down and shut off. This will continue until the demand is satisfied and all appliances are shut off.
Sequence of the cascade
To equalize the run time of all appliances on the Cascade, the firing sequence will automatically be changed at set intervals.
For the first 24 hours after initializing the Cascade, the sequence will be changed every hour. After that the sequence will be changed once every 24 hours. The switching on/off sequence will be as follows:
DAY SWITCHING ON SEQUENCE
Day 1 L-M1-M2-M3-M4-M5-M6-M7
Day 1 + 1 hour M1-M2-M3-M4-M5-M6-M7-L
Day 1 + 2 hour M2-M3-M4-M5-M6-M7-L-M1
DHW, Night Setback, and Ramp Delay operation with cascade
For indirect DHW operation any boiler(s) in the Cascade can be selected to provide heat for a DHW call. Select a boiler to be designated as the DHW boiler. Connect the tank thermostat or tank sensor to the corresponding terminals on the low voltage connection board. When the boiler receives a DHW call, the Leader control will take that boiler out of the Cascade sequence. If another boiler is available, the Leader will start it up to take its place.
The DHW boiler will adjust its set point to the programmed outlet set point and will adjust its firing rate to maintain this (M9 and B9 only). Once the DHW call has been satisfied, the Leader control will place that boiler back into the Cascade sequence.
Switching of the boiler between DHW operation and SH operation when there is a call for both does not occur. The boiler will provide heat for the DHW demand until it is satisfied.
Night Setback operation of the boilers or water heaters within the Cascade is available. Programming of the Night Setback will be done through the Leader boiler. Refer to the Power-fin Service Manual for information regarding Night Setback.
Ramp Delay operation of the boilers as described in the Power-fin Service Manual is not active when the boilers are part of a Cascade system.
8 Operating information
Installation & Operation Manual
Page 57
57
OPERATION DISPLAY
1. The manual reset high limit must be closed before any action will take place.
HTR: Standby OUT: 123.8F(129)
2. Upon a call for heat the control turns on the appropriate pumps (system and boiler pumps for space heating; DHW pump for DHW call). The flow switch and low water cutoff (if equipped) must close.
HTR: Standby OUT: 123.8F(129)
3. • If the unit is equipped with a proof of closure valve, the proof of closure
switch must be closed. The proof of closure valve is then energized. The gas pressure switch(es) (if equipped) must close.
• If the contact for the louvers is closed, the louver proving, blocked drain
switch, and auto reset high limit (water heater only) inputs must close.
• If the air pressure switch is open, the prepurge cycle then begins by
starting the combustion blower. Once started, the air pressure switch must close.
HTR: Standby OUT: 123.8F(129)
4. After the 10 second prepurge, the blower slows down and the hot surface igniter (HSI) is energized. The HSI is heated for at least 15 seconds.
HTR: PREPURGE OUT: 123.9F(129)
5. Once the HSI is hot, the trial for ignition begins with the opening of the gas valve.
HTR: IGNITION OUT: 123.9F(129)
6. If the SMART SYSTEM control does not sense flame within 7 seconds of the opening of the gas valve, then it will lock out.
HTR: POSTPURGE, LOCKOUT OUT: 123.9F(129)
7. If the SMART SYSTEM control senses flame within 7 seconds, it will fire the burner to maintain the set point. On B9 and M9 models, the firing rate will modulate as required to hold the actual temperature at the set point. If the boiler lights due to a space heating call for heat, and the ramp delay function is active (default is disabled), the modulation will be held to a series of increasing limits after the burner has lit.
HTR: SH 20% RATE OUT: 124.8F(129)
8. If the space heating call for heat is active, and the DHW thermostat closes,
the control will turn on the DHW pump, wait 2 seconds, and then turn off the boiler pump. This will divert the hot water away from the heating zone(s) and send it to the DHW tank instead. The control will then modulate (B9 and M9 models only) to maintain the outlet temperature to the DHW boiler set point.
HTR: DHW 85% RATE OUT: 177.8(180)
9. If the DHW thermostat remains on for more than 30 minutes, and the space heating call for heat is also on, then the control will turn on the boiler pump, turn off the DHW pump after 2 seconds, and resume firing based on the space heating set point. As long as both the space heating and DHW calls for heat remain active, the control will switch back and forth between the two modes until one of them is satisfied.
HTR: SH 41% RATE OUT: 123.0F(129)
10. Once both calls for heat are satisfied, the control will turn off the burner. The blower will remain on for the 30 second postpurge cycle. Any pumps that are running will continue to run for their respective pump delay times, then turn off.
HTR: POSTPURGE OUT: 127.4F(129)
11. Boiler pump off, system pump continues its delay if longer.
HTR: Standby OUT: 124.7F(129)
12. System pump off.
HTR: Standby OUT: 122.9F(129)
Sequence of operation
8 Operating information (continued)
Installation & Operation Manual
Page 58
58
Power-fin control module
Figure 8-1_Control Panel - Operator Interface
Use the control panel (FIG. 8-1) to set temperatures, operating conditions, and monitor appliance operation.
8 Operating information
Access modes
User
The user can adjust the space heating target temperature and the tank target temperature (if a tank sensor is used) by using the UP and DOWN buttons (FIG. 8-1) at any time during normal operation. By entering the USER code (0704), the user can also change temperature units, time and date, and night setback settings. In User Mode, the following parameters can be viewed but not changed:
• Boiler outlet water target temperature in DHW Mode
• Appliance model number
• Software version
• Total operating hours
• Total cycles
Installer
Most parameters are available only to the installer, accessible only by entering the installer access code, see the Power-fin Service Manual.
Saving parameters (reference the
Parameter Table in the Power-fin Service Manual)
To save parameters and exit programming:
Press the ENTER/RESET button, then the MENU/EXIT button 3 times.
To keep parameter settings only for a current operating cycle:
Press the MENU/EXIT button 3 times after making all desired parameter changes.
To enter a parameter and continue programming:
Press the MENU/EXIT button 1 time to return to the parameter listings; press again to return to the menu listings. Remember to press the ENTER/RESET button when finished programming in order to save the changes made.
See the Power-fin Service Manual for a detailed description of parameters and access modes.
Installation & Operation Manual
Page 59
8 Operating information (continued)
Installation & Operation Manual
59
Status Display Screens
By using the Previous/Next (, ) arrow keys on the SMART SYSTEM display panel, you can navigate through the nine (9) display screens. Each screen will contain two (2) viewable items. The following is a description of the individual items and what they can display:
Screen Display shows: Description
#1
HTR: OFF
The unit has been turned OFF by the Enter/Reset button on the SMART SYSTEM display panel.
Standby
The unit has not received a call for heat from a remote thermostat nor has it received a call for heat from a DHW thermostat.
Set Point Met
The unit has met the water temperature set point, but is still receiving a call for heat from either a remote thermostat, a DHW thermostat, or a BMS.
Prepurge
The unit has initiated the 10 second purge and 15 second HSI warm­up periods on a call for heat.
Ignition
The unit has begun a 5 second trial for ignition.
SH***% Rate DHW***% Rate
The unit has fired and is running at the displayed percentage.
Postpurge
The call for heat has been satisfied and the unit runs the fan for an additional 10 seconds to clear the combustion chamber and vent system of residual flue products.
Service
The unit has been placed in a temporary mode that will allow the unit to fire for the purpose of combustion analysis.
OUT: ***F(***)
When the outlet sensor has been selected as the control sensor (default), the control will display the outlet temperature as well as the set point in parenthesis.
***F
If the outlet sensor has not been selected as the control sensor or a system supply sensor is connected, only the outlet temperature will be displayed.
Open
The control does not detect the outlet sensor.
Shorted
The outlet sensor wires or the sensor itself has become shorted.
Press the Next arrow key on the SMART SYSTEM display to access Screen #2.
#2
IN: ***F
If the inlet sensor has not been selected as the control sensor or a system return sensor is installed, only the inlet temperature will be displayed.
***F (***)
When the inlet sensor has been selected as the control sensor, the control will display the inlet temperature as well as the set point in parenthesis.
Open
The control does not detect the inlet sensor.
Shorted
The inlet sensor wires or the sensor itself has become shorted.
RISE: ***F
The difference between the inlet temperature and the outlet temperature.
Press the Next arrow key on the SMART SYSTEM display to access Screen #3.
Status display screens
Page 60
60
Status Display Screens (cont’d)
By using the Previous/Next (, ) arrow keys on the SMART SYSTEM display panel, you can navigate through the nine (9) display screens. Each screen will contain two (2) viewable items. The following is a description of the individual items and what they can display:
Screen Display shows: Description
#3
SYS: ***F
If the system sensor has not been selected as the control sensor, only the system temperature will be displayed.
***F (***)
When the system sensor has been selected as the control sensor, the control will display the system temperature as well as the set point in parenthesis.
Open
The control does not detect the system sensor.
Shorted
The system sensor wires or the sensor itself has become grounded.
OUTDOOR: ***F
The control will display the outdoor air temperature as sensed by the outdoor air sensor.
Open
The control does not detect the outdoor air sensor.
Shorted
The outdoor air sensor wires or the sensor itself has become grounded.
Press the Next arrow key on the SMART SYSTEM display to access Screen #4.
#4
SYSRT: ***
The control will display the system return temperature if the system return sensor is connected. If not connected, the display will skip this screen and display screen #5.
VALVE: ***%
The control will display the position of the 3-way valve; 100% indicates that no outlet water is being bypassed into the inlet.
Press the Next arrow key on the SMART SYSTEM display to access Screen #5.
#5
FLUE: ***F
The control will display the flue temperature.
Open
The control does not detect the flue sensor.
Shorted
The flue sensor wires or the sensor itself has become grounded.
TANK: ***F
The control will display the temperature.
Open
The control does not detect the auxiliary sensor.
Shorted
The auxiliary sensor wires or the sensor itself has become grounded.
Press the Next arrow key on the SMART SYSTEM display to access Screen #6.
#6
FAN SPD: ****RPM
The control will display the actual fan motor RPM.
FLAME SIG: **.*uA
The control will display the flame signal in dc microamps.
Press the Next arrow key on the SMART SYSTEM display to access Screen #7.
8 Operating information
Installation & Operation Manual
Page 61
Status Display Screens (cont’d)
By using the Previous/Next (, ) arrow keys on the SMART SYSTEM display panel, you can navigate through the nine (9) display screens. Each screen will contain two (2) viewable items. The following is a description of the individual items and what they can display:
Screen Display shows: Description
#7
SH CFH: OFF
The control has not received a call for heat from a SH remote thermostat.
ON
The control has received a call for heat from a SH remote thermostat.
DHW CFH: OFF
The control has not received a call for heat from a tank sensor or tank thermostat.
ON
The control has received a call for heat from a tank sensor or tank thermostat.
Press the Next arrow key on the SMART SYSTEM display to access Screen #8.
#8
DHW PUMP: OFF
The control has not received a DHW call for heat and has not powered the DHW pump.
ON
The control has received a DHW call for heat and has powered the DHW pump.
Delay
The DHW call for heat has been satisfied and the DHW pump is running for a fixed time to remove any residual heat.
0-10V IN: **.VDC
The control will display a 0-10 VDC signal received from a Building Management System (BMS) connected to the unit.
Press the Next arrow key on the SMART SYSTEM display to access Screen #9.
#9
SYS PUMP: OFF
The control has not received a call for heat from a remote thermostat and has not powered the system pump.
ON
The control has received a call for heat from a remote thermostat and has powered the system pump.
Delay
The system call for heat has been satisfied and the system pump is running for a fixed time to remove any residual heat.
BLR PUMP: OFF
The control has either not received a call for heat from a remote thermostat, a remote thermostat is not connected to the unit and the water temperature has not dropped below the temperature set point of the control to initiate a call for heat, or the control has received a DHW call for heat from a DHW thermostat.
ON
The control has received a call for heat from a remote thermostat or a remote thermostat is not connected and the water temperature has dropped below the temperature set point of the control to initiate a call for heat.
Delay
The call for heat has been satisfied and the boiler pump is running for a fixed time to remove any residual heat.
Press the Next arrow key on the SMART SYSTEM display to access Screen #10.
61
8 Operating information (continued)
Installation & Operation Manual
Page 62
62
Status Display Screens (cont’d)
Operation of the cascade
The boiler designated as the Leader will have two additional display screens that can be viewed. These screens will provide information regarding the operation of the Cascade. Each screen will contain two viewable items. The following is a description of the individual items and what they can display:
Screen Display shows: Description
#10
Cas: Off
The Leader control has been turned off by the Enter/Reset button on the Smart System display.
Cas: Standby
The Leader boiler has not received a call for heat from a remote thermostat.
Cas: ***F(***)
The Cascade is now active. The system temperature will be displayed. The Cascade set point will be displayed in parenthesis.
Cas: Setpoint Met
The Cascade has met the water temperature set point, but is still receiving a call for heat from a remote thermostat.
Cas: No Members
The Leader control could not detect any Member controls to participate in the Cascade.
Cas: S6 Not Present The system sensor is not connected to the Leader boiler.
PMP: Off
The Leader control has not received a call for heat from a remote thermostat and has not powered the system pump.
PMP: On
The Leader control has received a call for heat from a remote thermostat and has powered the system pump.
PMP: Delay
The system call for heat has been satisfied and the system pump is running for a fixed time to remove any residual heat.
Press the Next arrow key on the SMART SYSTEM display to access Screen #11.
#11
Cas PWR: ***% ***%
The first percentage shows the firing rate that is being sent to the last boiler called on. The second percentage shows the total power available to the Cascade.
Present: 01234567
Example: Present: 23----d1
Shows the number of boilers connected to the Cascade. The Leader is designated as 0. Members will be designated 1 - 7. If a “-“ is used in place of a number, that boiler is either not connected, or in a lockout mode and not available for the Cascade. If a “d” is used in place of a number, that boiler is handling a DHW demand and is not available for the Cascade. If the number is flashing, then that boiler is providing heat to the Cascade. As the lead boiler is changed from day to day, that boiler’s address will be shown first in the string of numbers. In the example, boilers 0 - 3 are present, boiler 2 is the lead boiler, and boiler 0 is heating an indirect DHW tank.
Press the Next arrow key on the SMART SYSTEM display to roll back to Screen #1. At any point if you wish to access an earlier screen, press the Previous arrow key on the SMART SYSTEM display.
8 Operating information
Installation & Operation Manual
Page 63
63
This section applies only to those appliances used to supply domestic hot water, installed with a storage tank(s). A circulating pump MUST be installed in the piping assembly to the storage tank and valves used to control water velocity through the appliance. Proper water velocity is important for correct operation of your water heater.
This section contains specific instructions for those appliances used to supply domestic hot water. All warnings, cautions, notes and instructions in the general installation and operation sections apply to these instructions. Water heaters are designed for installation with a storage tank. The operation of the circulating pump, proper sizing of the piping between the tank and heater and the control of water velocity, as explained in this section, are important for correct operation of your water heater.
NOTICE
To ensure proper velocity through the heat exchanger, it is necessary to regulate the temperature rise across the heat exchanger from inlet to outlet. This must be done on initial installation and periodically rechecked. With the correct temperature rise across the heat exchanger when the water heater is firing at 100% of rated input, you may be assured of the proper velocity in the tubes. This will yield long life and economical operation from your water heater.
Excessive lime/scale build-up in the heat exchanger tubes is a result of restricted flow and too little velocity in the tubes. Excessive pitting or erosion in the tube is caused by high water flow and too much velocity through the tubes. Care should be taken to measure temperature rise and maintain velocity as follows:
Initial set-up of maximum water flow
On initial start-up of the Power-fin the maximum water flow through the heat exchanger must be manually set before normal operation begins.
TABLE 9A
MAXIMUM WATER FLOW
CAUTION: The maximum flow rate through a Power-fin water heater with a copper heat exchanger must be set to provide and not exceed the following flow:
Model Maximum Flow
502, 752, 1002, and 1302 75 GPM
1501 - 1701 - 2001 90 GPM
If higher flow rates are required through the water heater, an optional Cupro Nickel heat exchanger is available. Consult the factory for specific application requirements.
The heat exchanger is capable of operating within the design flow rates required for the water heater, storage tank(s), and connecting piping. Erosion of the finned copper tubes may occur if the flow rate exceeds the maximum allowable flow rate through the water heater. The maximum flow rate through the water heater must be adjusted. Maximum flow on Models 502 ­1302 is 75 GPM and 90 GPM on Models 1501 - 2001. Flow rate can be determined by measuring the temperature rise through the water heater when it is firing at full rate input.
1. The pump must run continuously when the burner is firing.
2. With the pump running and the burner in the water heater in the off cycle, the inlet water temperature and outlet water temperature readings on the Operator Interface should read approximately the same temperatures. Water Temperature Rise on the Operator Interface should read near zero.
3. Turn the water heater on and allow time for the temperature to stabilize. The Service Mode can be used to force the water heater to run at full fire. See the Power-fin Service Manual for a detailed explanation of the Service Mode. Check the water temperature rise in the Operator Interface when the burner is firing at 100% of rated input.
4. Compare the water temperature rise in the Operator Interface with the required temperature rise. Should adjustment be needed, proceed as follows.
TABLE - 9B
TEMPERATURE RISE AT FULL RATE FIRE
75 AND 90 GPM FLOW
Model Temperature Rise
502 11°F (6.1°C)
752 17°F (9.4°C)
1002 23°F (12.8°C)
1302 30°F (16.7°C)
1501 28°F (15.6°C)
1701 32°F (17.8°C)
2001 38°F (21.1°C)
9 Domestic water heaters
Installation & Operation Manual
Page 64
64
If the temperature rise is too low, the water velocity is too high, adjust as follows:
1. Temperature rise can be increased by slowly closing the field-installed ball valve in the outlet piping from the water heater to the storage tank to achieve the proper temperature rise.
2. Sustained high water velocity and low temperature rise may result in pitting or erosion of the copper tubes in the heat exchanger. This is a non-warrantable failure. Temperature rise must be properly adjusted to achieve the specified flow rate.
3. Once temperature rise has been properly set, return to normal operation.
CAUTION
Temperature rise cannot be adjusted when the burner is firing at less than 100% of rated input.
Water chemistry
NOTICE
Water temperature rise and maximum flow data is based on heating potable water with a hardness of 5 to 25 grains per gallon and total dissolved solids not exceeding 350 ppm.
The required temperature rise and the standard circulating pump are sized based on the heating of potable water with a hardness of 5 to 25 grains per gallon and a total dissolved solids not exceeding 350 ppm. Consult the manufacturer when heating potable water exceeding these specifications. Heating of high hardness and/or high total dissolved solids water may require a larger circulating pump, an optional Cupro Nickel heat exchanger and a revised temperature rise specification based on the water chemistry of the water to be heated. Water with a hardness of less than 5 grains per gallon will usually have a pH which can be aggressive and corrosive causing non-warrantable damage to the heater, pump, and associated piping. Corrosion due to water chemistry generally shows up first in the hot water system because heated water increases the rate of corrosive chemical reactions.
If the temperature rise is too high, the water velocity is too low, adjust as follows:
1. Check for restrictions in the outlet of the water heater.
2. Be sure all valves are open between the water heater and the storage tank. Ensure that all ball valves are fully ported.
3. Check the pump to be sure it is running properly and that the pump motor is running in the proper direction.
4. Check diameter and length of the piping between the storage tank and water heater against the head capacity of the circulating pump.
5. Be sure the pipes between the water heater and storage tank are not less than 2 1/2 inch (63.5mm) diameter. To increase flow and decrease temperature rise, increase the piping to 3 inch (76.2mm) diameter to decrease head loss in the piping to the storage tank.
6. Common manifold piping for multiple unit installations will require larger minimum pipe sizes and tank circulating tappings to ensure proper flow.
9 Domestic water heaters
Installation & Operation Manual
Page 65
65
Figure 9-1_Typical Water Heater Piping with Storage Tank
COMMON MANIFOLD SIZE (Min.)
Models: 502, 752, 1002, & 1302
Number of Units GPM
Diameter
(in.)
1 75 2 1/2
COMMON MANIFOLD SIZE (Min.)
Models: 1501, 1701, & 2001
Number of Units GPM
Diameter
(in.)
1 90 2 1/2
9 Domestic water heaters (continued)
Installation & Operation Manual
BUILDING HOT
WATER SUPPLY
COLD WATER SUPPLY
POWER-FIN WATER HEATER
RELIEF VALVE
MIXING VALVE
RELIEF VALVE
LOCK-TEMP
STORAGE TANK
DRAIN
OUTLET
INLET
BUILDING RETURN
Page 66
66
Figure 9-2_Single Water Heater Piping with Two Storage Tanks
BUILDING HOT
WATER SUPPLY
MIXING VALVE
POWER-FIN WATER HEATER
OUTLET
COLD WATER SUPPLY
INLET
RELIEF VALVE
LOCK-TEMP
STORAGE TANK
DRAIN
BUILDING RETURN
COMMON MANIFOLD SIZE (Min.)
Models: 502, 752, 1002, & 1302
Number of Units GPM
Diameter
(in.)
1 75 2 1/2
COMMON MANIFOLD SIZE (Min.)
Models: 1501, 1701, & 2001
Number of Units GPM
Diameter
(in.)
1 90 2 1/2
9 Domestic water heaters
Installation & Operation Manual
Page 67
67
Figure 9-3_Multiple Water Heater Piping with a Single Storage Tank
COMMON MANIFOLD SIZE (Min.)
Models: 502, 752, 1002, & 1302
Number of Units GPM
Diameter
(in.)
2 150 3 1/2
3 225 4
4 300 5
5 375 6
6 450 6
7 525 6
8 600 8
COMMON MANIFOLD SIZE (Min.)
Models: 1501, 1701, & 2001
Number of Units GPM
Diameter
(in.)
2 180 4
3 270 5
4 360 6
5 450 6
6 540 6
7 630 8
8 720 8
9 Domestic water heaters (continued)
Installation & Operation Manual
BUILDING HOT
WATER SUPPLY
RELIEF VALVE
LOCK-TEMP
STORAGE TANK
MIXING VALVE
COLD WATER SUPPLY
MIN. 4” COMMON
MANIFOLD SIZE
DRAIN
BUILDING RETURN
Page 68
68
Installation & Operation Manual
Figure 9-4_Multiple Water Heater Piping with Multiple Storage Tanks
COMMON MANIFOLD SIZE (Min.)
Models: 502, 752, 1002, & 1302
Number of Units GPM
Diameter
(in.)
2 150 3 1/2
3 225 4
4 300 5
5 375 6
6 450 6
7 525 6
8 600 8
COMMON MANIFOLD SIZE (Min.)
Models: 1501, 1701, & 2001
Number of Units GPM
Diameter
(in.)
2 180 4
3 270 5
4 360 6
5 450 6
6 540 6
7 630 8
8 720 8
9 Domestic water heaters
MIXING
VALV E
COLD WATER SUPPLY
POWER-FIN WATER HEATER
BUILDING HOT
WATER SUPPLY
RELIEF VALVE
DRAIN
MIN. 4” COMMON
MANIFOLD SIZE
BUILDING RETURN
Page 69
69
Installation & Operation Manual
Pump operation
1. The water heater must have a properly sized circulating pump. This pump is sized to circulate water between the heater and the storage tank only.
2. The pump is sized to the heater input and water chemistry specifications noted in the Water Chemistry section on page 64.
3. The diameter and length of the piping installed between the storage tank(s) and water heater must be properly sized based on the capacity of the circulating pump.
4. The pump must run continuously when the water heater is energized. This is the standard operating system for a water heater.
An intermittent pump control function with an all bronze pump is installed as standard equipment on all water heater systems. The pump will operate only while there is a “Call for Heat” and for a timed period after the water temperature set point is satisfied to remove any residual heat from the combustion chamber.
5. Lubricate pump to manufacturer’s recommendations. Pump damage due to inadequate lubrication is non-warrantable.
The tank sensor must be installed in the tapping provided in the lower 25% of the storage tank to achieve proper operation. As shipped from the factory, the tank sensor is in the literature package shipped with the unit. Placing the sensor in the tapping provided on the storage tank will improve temperature response and prevent short cycles of operation.
TABLE 9D
MINIMUM PUMP PERFORMANCE
Based on heating potable water with a hardness of 5 to 25 grains per gallon and total dissolved solids not exceeding 350 ppm. See Water Chemistry section on page 64.
Model GPM Ft. Hd.
502 - 752 - 1002 - 1302 75 15
1501 - 1701 - 2001 90 15
When installing multiple water heaters and/or multiple storage tanks, the diameter of the inter-connecting pipe and all fittings must be increased. An increase in pipe diameter will decrease head loss in the system piping and ensure proper flow. Proper pipe size between the heater and storage tank MUST be maintained to ensure that the standard pump supplied on the water heater will maintain desired flow.
Heat exchanger
This is a highly sophisticated heat exchanger designed to carry water in such a way that it generates a scouring action which keeps all interior surfaces free from build-up of impurities. The straight-line, four pass design of the copper finned tubes send water into the headers at a properly rated velocity. The configuration of the headers, in turn, creates a high degree of turbulence which is sufficient to keep all contaminants in suspension. This “scouring action” provides greater cost savings for owners. Tubes are always able to transfer heat at peak efficiency. Every surface within this water containing section is of a non-ferrous material, providing clear, clean, rust-free hot water. Straight copper tubes-finned on the outside for maximum heat transfer and glass lined, cast iron, one piece, cored headers make up an entirely rust-proof unit. On all models, header inspection plugs in the heat exchanger can be removed for field inspection and cleaning of copper tubes. The heat exchanger may be removed from the unit.
TABLE 9C
COMMON WATER MANIFOLD SIZE FOR
MULTIPLE WATER HEATER INSTALLATIONS
Pipe sizing chart provides minimum pipe size for common manifold piping to ensure adequate flow.
Number of Water Heaters
Common Manifold Size (Min.)
Models
502 - 1302 1501 - 2001
1 2 1/2" 2 1/2"
2 3 1/2" 4"
3 4" 5"
4 5" 6"
5 6" 6"
6 6" 6"
7
6" 8"
8
8" 8"
The standard circulating pump on this water heater is sized based on installation of a single storage tank and heater in close proximity. If the number of fittings and straight pipe exceeds the specified maximum equivalent number of straight feet for a specified diameter of pipe, non-warrantable operational problems may be experienced.
500,000 - 1,300,000 Btu/hr Models
1/2 HP, 120 VAC, 9.8 Amps
1,500,000 - 2,000,000 Btu/hr Models
3/4 HP, 120 VAC, 8.8 Amp
The standard pump selection is based on the following pipe and fittings from the water heater to the storage tank:
6 - 90° elbows 2 - ball valves 2 - unions 1 - cold water tee
Not more than 45 feet of straight pipe.
For every elbow and tee in excess of those shown above, DEDUCT 6.5 FEET from the maximum allowable straight pipe in the heater to tank circulating loop.
9 Domestic water heaters (continued)
Page 70
70
Failure to press the ENTER key after changing the display value will result in the set point reverting back to its previous value after the current heat demand ends.
The control may be adjusted any time regardless of call for heat status. When pressing the UP or DOWN key to enter any new set points, the control module will immediately begin controlling based on the new set point.
Minimum water temperatures (domestic hot water use)
Domestic water temperatures:
This high efficiency water heater should be operated at a temperature setting high enough to prevent condensing of the products of combustion on the unit’s heat exchanger or in the attached venting system. Use extreme caution when storing water at elevated temperatures. A water temperature setting maintained above the dew point of the products of gas combustion should prevent condensate formation and ensure proper performance of the venting system. The manufacturer recommends the use of a properly sized thermostatic mixing valve to supply domestic hot water at temperatures less than 140°F (60°C). Storing the water at a higher temperature and thermostatically mixing the water will increase the available quantity of mixed hot water, greatly reducing the possibility of condensate formation on the heat exchanger or in the venting system and help prevent the growth of water borne bacteria.
NOTICE
Adequate care MUST be taken to prevent a potential scald injury when storing water at elevated temperatures for domestic use.
CAUTION
An appliance allowed to operate at return temperatures below the specified minimum setting may experience problems with the operating controls, safety switches, obstruction of the flue gas passages on the heat exchanger, incomplete combustion, and possible flue gas spillage. Sustained operation at lower than specified water temperatures may cause hazardous conditions that may result in personal injury or non-warrantable damage to the appliance.
The maximum temperature set point that can be programmed into the control module from the Operator Interface for water heater operation is 190°F (88°C). The control is factory pre-set at approximately 120°F (49°C). Facilities with small children or invalids may require 120°F (49°C) or a lower temperature setting to reduce risk of scald injury. Some states may require a lower temperature setting. Check with your gas supplier for local requirements governing the temperature setting. Remember, no water heating system will provide exact temperature at all times. Allow a few days of operation at this setting to determine the correct temperature setting consistent with your needs.
NOTICE
1. This water heater, when set at the lower temperature setting, is not capable of producing hot water of sufficient temperature for sanitizing purposes.
2. Higher stored water temperature increases the ability of the water heater to supply desired quantities of hot water, however remember --
CAUTION
Hotter water increases the risk of scald injury.
Thermostat adjustment procedure
1. Press the UP or DOWN key to view the set point setting.
2. Press either the UP or DOWN key to increase or decrease the displayed set point value.
3. Press the ENTER key to permanently store the new set point into the control module’s memory.
Inlet water temperatures below the specified minimum recommendations can excessively cool the products of combustion resulting in condensation on the heat exchanger. Condensation on the heat exchanger can cause operational problems, bad combustion, sooting, flue gas spillage and reduced service life of the related components.
9 Domestic water heaters
Figure 9-5_Danger Warning
Installation & Operation Manual
Page 71
71
Location of Cold Water Supply Piping Connections
Incorrect piping of the cold water supply to the system may result in excessive low temperature operation causing condensate formation on the primary heat exchanger and operational problems. The cold water supply piping must be installed in the discharge piping from the heater to the storage tank. This allows the cold water to be tempered in the storage tank before entering the heater. See typical installation drawings provided in this manual for correct piping (FIG.’s 9-1 thru 9-4). Higher water temperatures reduce the volume of condensate formed.
CAUTION
Setting the temperature selector to higher settings provides hotter water, which increases the risk of scald injury.
WARNING
Should overheating occur or the gas supply fail to shut off, do not turn off or disconnect the electrical supply to the pump. Instead, shut off the gas supply at a location external to the appliance.
Adjustable high water temperature limit control
Figure 9-6_Adjustable High Water Temperature Limit Control
A high limit control is located on the inside of the left front panel, as shown in FIG. 9-6. The setting of this control knob limits maximum discharge water temperature. The water heater temperature limit control is adjustable up to a maximum setting of 210°F (99°C). This water heater also includes a fixed high water temperature limit control set to 200° (93.3°C). The RESET key on the display must be pushed whenever water temperature has exceeded the set point of the limit. The temperature of the water in the heat exchanger must drop a minimum of 15°F (8.3°C) below the setting of the high limit control before the reset function can be activated. A high limit message will be shown in the Operator Interface when water temperature exceeds the high water temperature limit control set point.
Optional relief valve
This water heater is normally supplied with a temperature and pressure relief valve sized in accordance with applicable codes. Units may be supplied with an optional pressure only relief valve. When a water heater is equipped with this optional relief valve and is piped to a separate storage vessel, the storage vessel must have a properly installed temperature and pressure relief valve which complies with local codes.
Thermal expansion
A relief valve that discharges periodically may be due to thermal expansion in a closed system. A water heater installed in a closed system, such as one with a backflow preventer or check valve installed in the cold water supply, shall be provided with means to control expansion. Contact the water supplier or local plumbing inspector on how to correct this situation. Do not plug or cap the relief valve discharge.
Cathodic protection
Hydrogen gas can be produced in a hot water system that has not been used for a long period of time (generally two weeks or more). Hydrogen gas is extremely flammable. To prevent the possibility of injury under these conditions, we recommend the hot water faucet be open for several minutes at the kitchen sink before you use any electrical appliance which is connected to the hot water system. If hydrogen is present, there will be an unusual sound such as air escaping through the pipe as the hot water begins to flow. There should be no smoking or open flames near the faucet at the time it is open.
NOTICE
The high limit control will not reset until the water temperature has dropped below the set point of the high limit.
9 Domestic water heaters (continued)
Installation & Operation Manual
The following chart (Table 9E) details the relationship of water temperature and time with regard to scald injury and may be used as a guide in determining the safest water temperature for your applications.
TABLE 9E
APPROXIMATE TIME / TEMPERATURE
RELATIONSHIPS IN SCALDS
120°F More than 5 minutes
125°F 1 1/2 to 2 minutes
130°F About 30 seconds
135°F About 10 seconds
140°F Less than 5 seconds
145°F Less than 3 seconds
150°F About 1 1/2 seconds
155°F About 1 second
Page 72
72
10 Maintenance
Maintenance and annual startup
Service technician
(see the following pages for instructions)
General:
• Address reported problems
• Inspect interior; clean and vacuum if necessary;
• Inspect condensate system and flush with fresh water
• Check for leaks (water, gas, flue, condensate)
• Examine venting system
• Check system water pressure/system piping/expansion tank
• Check control settings
• Check igniter
• Check wiring and connections
• Check flue gas passageways
• Flame inspection (stable, uniform)
• Inspect and clean the burner
• Clean the heat exchanger if flue temperature is more than 54°F (30°C) above return water temperature.
• Perform start-up checkout and performance verification per Section 7 - Start-up.
If combustion or performance indicate need:
• Clean heat exchanger
• Remove and clean burner using compressed air only
• Clean the blower wheel
ANNUAL START-UP
Owner maintenance
(see the Power-fin User’s Information Manual for
instructions)
Daily
• Check appliance area
• Check pressure/temperature gauge
Monthly
• Check vent piping
• Check air piping
• Check relief valve
• Check condensate drain system
Periodically
• Test low water cutoff (if used)
• Reset button (low water cutoff)
Every
6 months
• Check appliance piping (gas and
water) for leaks
• Operate relief valve
End
of season
months
• Shut appliance down (unless boiler used for domestic hot water)
Table 10A_Service and Maintenance Schedules
Installation & Operation Manual
Page 73
73
10 Maintenance (continued)
Follow the service and maintenance procedures given throughout this manual and in component literature shipped with the appliance. Failure to perform the service and maintenance could result in damage to the appliance or system. Failure to follow the directions in this manual and component literature could result in severe personal injury, death, or substantial property damage.
The appliance should be inspected annually only by a qualified service technician. In addition, the maintenance and care of the appliance designated in Table 10A and explained on the following pages must be performed to assure maximum appliance efficiency and reliability. Failure to service and maintain the appliance and system could result in equipment failure.
Electrical shock hazard – Turn off power to the appliance before any service operation on the appliance except as noted otherwise in this instruction manual. Failure to turn off electrical power could result in electrical shock, causing severe personal injury or death.
Address reported problems
1. Inspect any problems reported by the owner and correct before proceeding.
Inspect appliance area
1. Verify that appliance area is free of any combustible materials, gasoline and other flammable vapors and liquids.
Inspect appliance interior
1. Remove the outer access panels and inspect the interior of the appliance.
2. Vacuum any sediment from inside the appliance and components. Remove any obstructions.
Inspect condensate system
1. Inspect the condensate drain line, condensate PVC fittings, and condensate trap on an annual basis.
Eliminate all system or appliance leaks. Continual fresh makeup water will reduce appliance life. Minerals can build up in sections, reducing heat transfer, overheating heat exchanger, and causing heat exchanger failure. Leaking water may also cause severe property damage.
1. Inspect all water and gas piping and verify to be leak free.
2. Look for signs of leaking lines and correct any problems found.
3. Check gas line using the procedure found in Section 3 - Gas Connections.
Check all piping for leaks
WARNING
WARNING
WARNING
WARNING
Figure 10-1_Condensate Trap
Flush condensate trap with water
1. Remove the four (4) screws securing the top cover to the condensate trap and remove the cover (reference FIG.10-1).
2. Locate the plastic ball inside the float tube. Verify there is nothing under the ball causing it to not seat properly.
3. If necessary, flush with fresh water until the water begins to pour out of the drain.
4. Replace the top cover on the condensate trap.
5. Replace the four (4) screws removed in Step 1.
Installation & Operation Manual
Page 74
74
10 Maintenance
Flue vent system and air piping
1. Check for gastight seal at every connection, seam of air piping, and vent piping periodically inspected by a qualified service agency.
Check water system
1. Verify all system components are correctly installed and operational.
2. Check the cold fill pressure for the system. Verify it is correct (must be a minimum of 12 PSI).
3. Watch the system pressure as the boiler heats up (during testing) to ensure pressure does not rise too high. Excessive pressure rise indicates expansion tank sizing or performance problem.
4. Inspect automatic air vents and air separators. Remove air vent caps and briefly press push valve to flush vent. Replace caps. Make sure vents do not leak. Replace any leaking vents.
Check expansion tank
1. Expansion tanks provide space for water to move in and out as the heating system water expands due to temperature increase or contracts as the water cools. Tanks may be open, closed, diaphragm or bladder type. See Section 4 - Water Connections for suggested best location of expansion tanks and air eliminators.
Check relief valve
1. Inspect the relief valve and lift the lever to verify flow. Before operating any relief valve, ensure that it is piped with its discharge in a safe area to avoid severe scald potential. Read Section 4 - Water Connections before proceeding further.
Safety relief valves should be re-inspected AT LEAST ONCE EVERY THREE YEARS, by a licensed plumbing contractor or authorized inspection agency, to ensure that the product has not been affected by corrosive water conditions and to ensure that the valve and discharge line have not been altered or tampered with illegally. Certain naturally occurring conditions may corrode the valve or its components over time, rendering the valve inoperative. Such conditions are not detectable unless the valve and its components are physically removed and inspected. This inspection must only be conducted by a plumbing contractor or authorized inspection agency – not by the owner. Failure to re-inspect the boiler relief valve as directed could result in unsafe pressure buildup, which can result in severe personal injury, death, or substantial property damage.
Following installation, the valve lever must be operated AT LEAST ONCE A YEAR to ensure that waterways are clear. Certain naturally occurring mineral deposits may adhere to the valve, rendering it inoperative. When manually operating the lever, water will discharge and precautions must be taken to avoid contact with hot water and to avoid water damage. Before operating lever, check to see that a discharge line is connected to this valve directing the flow of hot water from the valve to a proper place of disposal. Otherwise severe personal injury may result. If no water flows, valve is inoperative. Shut down the appliance until a new relief valve has been installed.
2. After following the above warning directions, if the relief valve weeps or will not seat properly, replace the relief valve. Ensure that the reason for relief valve weeping is the valve and not over-pressurization of the system due to expansion tank waterlogging or undersizing.
WARNING
WARNING
Venting system must be sealed gastight to prevent flue gas spillage and carbon monoxide emissions, which will result in severe personal injury or death.
WARNING
Installation & Operation Manual
Page 75
75
Inspect/replace hot surface igniter
1. Turn off main electrical power to the appliance.
2. Turn off main manual gas shutoff to the appliance.
3. Carefully pull back the insulation flaps to expose the burner mounting flange.
4. Locate the hot surface igniter. Disconnect the two power leads to the hot surface igniter.
5. Loosen and remove the two wing nuts that mount the igniter.
6. Lift the igniter vertically out of the burner mounting flange. Use care, do not hit or break the silicon carbide igniter. Do not contaminate the igniter by handling with oily or dirty hands.
7. Check the replacement igniter for cracks or damage before installing.
8. Ensure that the fiber gasket used to seal the base of the igniter to the burner flange is reinstalled to seal the base of the replacement igniter.
9. Carefully insert the igniter into the mounting point on the burner flange and position on the mounting studs.
10. Reinstall the two wing nuts and tighten by hand only. Over tightening the wing nuts may break the ceramic mounting flange.
11. Ensure that the igniter gasket is properly installed and seals the point of contact between the igniter and burner mounting flange.
12. Reconnect the power leads to the igniter.
13. Replace the insulation blanket flaps.
14. Turn on main gas supply and main power.
15. Test fire the appliance to ensure proper operation.
Check burner flame
Visually check main burner flames at each start-up after long shutdown periods or at least every six months. A burner viewport is located on the burner mounting flange.
Perform start-up and checks
1. Start appliance and perform checks and tests specified in Section 7 - Start-up.
2. Verify cold fill pressure is correct and that operating pressure does not go too high.
The area around the burner viewport is hot and direct contact could result in burns.
WARNING
Figure 10-2_Flame Pattern Illustration
Normal Flame: A normal flame at 100% of burner input is blue, with slight yellow tips, a well defined flame and no flame lifting.
Ye l lo w Ti p : Yellow tipping can be caused by blockage or partial obstruction of air flow to the burner.
Yellow Flames: Yellow flames can be caused by blockage of primary air flow to the burner or excessive gas input. This condition MUST be corrected immediately.
Lifting Flames: Lifting flames can be caused by over firing the burner, excessive primary air or high draft.
If improper flame is observed, examine the venting system, ensure proper gas supply and adequate supply of combustion and ventilation air.
Check all wiring
1. Inspect all wiring, making sure wires are in good condition and securely attached.
Check control settings
1. Set the SMART SYSTEM control module display to Parameter Mode and check all settings. See Section 1 of the Power-fin Service Manual. Adjust settings if necessary. See Section 1 of the Power-fin Service Manual for adjustment procedures.
2. Check settings of external limit controls (if any) and adjust if necessary.
10 Maintenance (continued)
Installation & Operation Manual
Page 76
76
10 Maintenance
Check flue gas passageways
Any sign of soot around the inner jacket, outer jacket, flue pipe connections, burner or in the areas between the fins on the copper heat exchanger indicates a need for cleaning. The following cleaning procedure must only be performed by a qualified serviceman or installer. Proper service is required to maintain safe operation. Properly installed and adjusted units seldom need flue cleaning.
All gaskets/sealants on disassembled components or jacket panels must be replaced with new gaskets/sealants on reassembly. Gasket and sealant kits are available from your distributor.
NOTICE
CAUTION
When a Category IV vent system is disconnected for any reason, the flue must be reassembled and resealed according to the vent manufacturer’s instructions.
Access to the burner will require the following steps:
1. Turn off main electrical power to the appliance.
2. Turn off main manual gas shutoff to the appliance.
3. Remove the front outer control panel covers. Slide out the inner control panel to increase service clearances and carefully remove the multi-pin wiring connectors on the back of the control panel. Remove the screws along the front and rear edge of the top outer jacket panel to remove top. Remove the control panel to allow access to the components in the top of the appliance.
4. Remove the sensing tubes from the low air pressure switch to the combustion air blower.
5. Disconnect the wiring connections on the top of the combustion air blower.
6. Remove the six (6) hex head bolts attaching the gas/air venturi to the inlet of the combustion air blower.
7. Remove the four (4) nuts holding the combustion air blower to the top of the burner and remove the combustion air blower assembly.
8. Use care when removing the combustion air blower assembly to prevent damage to the venturi and burner gaskets.
9. Disconnect the power wires to the hot surface igniter.
10. Remove the hot surface igniter. The hot surface igniter is fragile. Use care to prevent impact damage to the silicone carbide igniter surface when removing the igniter.
11. Remove the eight (8) nuts holding the burner to the heat exchanger.
12. The burner can now be lifted vertically out of the heat exchanger chamber.
13. Use care when removing the burner to prevent damage to the woven burner port surface or gaskets on removal.
14. Remove any visible dust or dirt blockage from the surface of the burner with a vacuum. Compressed air may also be blown across the burner surface to clean the “pores” of the woven burner port material.
15. Reassemble in reverse order.
Inspect and clean burner
The burner should be removed for inspection and cleaned on an annual basis. An appliance installed in a dust or dirt contaminated environment may require cleaning of the burner on a 3 to 6 month schedule or more often, based on severity of the contamination. The fan assisted combustion process may force airborne dust and dirt contaminants, contained in the combustion air, into the burner. With sustained operation, non-combustible contaminants may reduce burner port area, reduce burner input or cause non-warrantable damage to the burner.
Use extreme care when operating an appliance for temporary heat during new construction. Airborne contaminants such as dust, dirt, concrete dust or drywall dust can be drawn into the burner with the combustion air and block the burner port area. An external combustion air filter is provided with the appliance. This filter helps ensure clean air is used for the combustion process. Check this filter every month and replace when it becomes dirty. The burner of an appliance used for temporary heat without a combustion air filter installed will probably require a thorough cleaning before the unit is placed into normal service.
Installation & Operation Manual
Page 77
77
10 Maintenance (continued)
Inspect and clean the heat exchanger
Figure 10-3_Location of the Heat Exchanger Inside Jacket
1. Turn off all power to the appliance.
2. Turn off main gas to appliance.
3. Remove the front outer jacket panel.
4. Remove the inner jacket panel (see FIG. 10-3).
5. Check the heat exchanger surface for soot. If soot is present, the heat exchanger must be cleaned and the problem corrected.
6. Remove the burner as described in the Inspect and Clean Burner section of the Power-fin Service Manual.
7. Check the “V” baffles on the heat exchanger. Remove and clean if necessary.
8. Remove soot from the heat exchanger with a stiff bristle brush. Use a vacuum to remove loose soot from surfaces and inner chamber.
9. The heat exchanger can be removed by disconnecting all water piping to the heat exchanger, removing the screws holding the heat exchanger to the top of the inner jacket and sliding the heat exchanger towards the front of the appliance. Once the heat exchanger is removed, a garden hose can be used to wash the tubes to ensure that all soot is removed from the heat exchanger surfaces. Note: Do not wet the insulation
blankets on the inside of the outer jacket panels.
10. Ensure that any soot present on the burner is removed. See Inspect and Clean Burner section of the Power-fin Service Manual.
11. Carefully reinstall the heat exchanger and “V” baffles if removed from the appliance.
12. Reinstall the inner jacket panel, burner, manifolds, wires, and hoses. Use new gasket material to ensure a proper air seal.
13. Reassemble all gas and water piping. Test for gas leaks.
Upon completion of any testing on the gas system, leak test all gas connections with a soap and water solution while main burners are operating. Do not spray soap and water solution on the SMART SYSTEM control module housing. The use of an excessive amount of soap and water solution can damage the control. Immediately repair any leak found in the gas train or related components. Do not operate an appliance with a leak in the gas train, valves, or related piping.
NOTICE
14. Reassemble outer jacket panels.
15. Cycle unit and check for proper operation.
Review with owner
1. Review the Power-fin User’s Information Manual with the owner.
2. Emphasize the need to perform the maintenance schedule specified in the Power-fin User’s Information Manual (and in this manual as well).
3. Remind the owner of the need to call a licensed contractor should the appliance or system exhibit any unusual behavior.
4. Remind the owner to follow the proper shutdown procedure and to schedule an annual start-up at the beginning of the next heating season.
Oiled bearing circulators
Inspect the pump every six (6) months and oil as necessary. Use SAE 30 non-detergent oil or lubricant specified by the pump manufacturer.
Installation & Operation Manual
Page 78
11 Wiring diagram
78
11 Wiring diagram
Installation & Operation Manual
LO-GAS PRESSURE SWITCH
HI-GAS PRESSURE SWITCH
VENTILATION
120VAC ALARM
SWITCH
SILENCE
DOTTED BOX DEPICTS
COLOR DESIGNATIONS
W = WHITE
BK = BLACK
PR = PURPLE
BL = BLUE
P = PINK
O = ORANGE
EXAMPLE OF STRIPED WIRE R/O = RED WITH ORANGE TRACER
LWCO
JUMPER
MANUAL RESET
PR
123
LOW WATER CUTOFF – 24V
BLOWER RELAY
DHW PUMP RELAY
SYSTEM PUMP RELAY
BOILER PUMP RELAY
BR
PR
P
BR
PR
PK
FAN
W
W
O/R
O/ BK
ALARM RELAY
OPTIONAL OR FIELD
SUPPLIED ITEMS
T = TAN
Y = YELLOW
BR = BROWN
G = GREEN
GY = GRAY
R = RED
6
3
5
2
O
4
1
O/BK
TEST
T
G
PR
6
3
5
2
4
1
ON/OFF POWER SWITCH
BK
O
BL/W
BK
P
W
O/R
BL
PR
W
O/W
Y
BR
W
BR/W
R
Notes:
1. All wiring must be installed in accordance with: local, state, provincial and national code requirements per either N.E.C. in USA or C.S.A. in Canada.
2. If any original equipment wire as supplied with the appliance must be replaced, it must be replaced with wire having same wire gauge (AWG) and rated for a minimum of 105°C
3. Actual connector block locati ons may vary from those shown on diagrams. Refer to actual components for proper connector block locations when using diagrams to trouble shoot unit.
O/R
1
W
O/
6
5
4
O
O/BK
1
1
BR
2
2
2
3
BR/W
1
2
3
W
BK/R
BL
3
2
1
T
235
BK/R
P
O/PR
PR/
3
3
BK
BL
T
AIR SWITCH
2
W
121
BK/R
BK/R
W
O
4
1
4
1
2
5
6
3
ALARM JUMPER
4
5
6
O/BK
O/BR
O/PR
1
2
3
2
5
6
3
T
Y
6
41
BL/
BL
BK
HI-LIMIT
WARNING:
To avoid possible
shock hazard,
disconnect power
OO/BK
before servicing.
GY
O
GY GY
IGNITER
BK/R
BL/BK
O/R
W
T/
Y/
W
BL
R
P
1 2 3 4 5 123
120V
COMBUSTION
BLOWER
13 14
GY
BK/W
W/BK
R/BK
O/BK
O
R/O
W
G
O/BK
R/BK
15
10 11
12
9
7 8
456
123
BR
BK
10 11 12
7 8 9
45
6
G
3
2
1
R
CHASSIS GROUND
INTEGRATED CONTROL
10 12
BL
789
456
O/W
BK/R
GY
GY
O
1
456
1
DEPENDENT
BR/W
BK/W
W/BK
BL/W
R/O
W
G
O
P
PR
BL
Y
11
3
2
87 9
3
2
X2
4
3
X3
2
1
"X5"
BLOCK'S
WIRING IS
MODEL
BK BL Y
BK/W
P
PR
BL
Y
X1
GAS
VALV E
15 14 13
12 11
987
654
321
BR
11 1012
3
2
X8
X7
X6
X5
T
~~~~~ ~~~~~ ~~~~~
LWCO
PROBE
W/BK
10
79 8
456
1
R
2 8 4
3 11 16 14 13
1 12 15
5 18 17
7
6 19 20 10
9
1
2
3
4
8
9
17 18
4
13
6
14
5
10 16
7
11
2
1
15 12
3
1
5
2
6
3
7
4
8
G
GY
GY
O
R/BK
BK/R
O/BK
BK
O
R/O
W
G
CHASSIS GROUND
W
O
BL
G
P/BK
BK
W/R
Y
R/W
O/R
PR
Y/BL
BR/W
BR
P
Y/W
T
R
GY
n/a n/a
n/a n/a
Y/BL
P
T/W
R
BL/BK
PR
BL/W
BL/R
PR/BK
Y
R/W
BR
W/BK
W
BL
GY
T
O
OPERATOR INTERFACE
1
PR
2
O/R
3
Y
2
W
1
O
CONNECTIONS FOR FIELD INSTALLED
ITEMS. SEE I&O MANUAL FOR DETAILS.
LOUVER
PR/ BK
Y
O/PR
BL
O/BK
X4
PROOF OF CLOSURE
2
W
1
O
1
PR
2
O/R
3
Y
NOTE
RELAY
O/BK
O
O/BR
R/BK
R/O
P
BL
PR
Y
BR
R
W
BK
G
WARNING:
This appliance may be connected to one or more branch circuits. To prevent electrical shock, ensure all circuits are de-energized before attempting to service this equipment.
AUTO-RESET HIGH-LIMIT
WATER HEATER ONLY
GY
BL/W
1
1
BL/R
BL/W
PR/BK
BR/W
W/BK
T
FLOW
SWITCH
~~~~~ ~~~~~ ~~~~~
R/W
2 3
PR
R/W
P
T
BL/R
W/R
GY
BL
Y/BL
Y
GY
O
P/BK
BK
O/R
BR
Y/W
BR
W
2
3
W
Y
O
Y
BL
Y
G
2
4 1
9
Y
3 10 11 12 13 14 15
5 16
8
R
7
6
8
9 10
11 12
6
5
4
3
7
2
1
CONNECTION
VALVE RELAY
OUT
LINE
OUT
LINE
OUT
LINE
PUMP
LINE
PUMP
LINE
PUMP
LINE
NEUTRAL
LINE
GROUND
BOARD
WIRING LEGEND
PROOF CLOSE
VALVE
O/BK
PR
O/R
LOUVER
CONTACTS
ALARM
CONTACTS
RUN-TIME
CONTACTS
DHW
PUMP
SYSTEM
PUMP
BOILER
PUMP
120VAC BOILER
SUPPLY
branch
BLOCKED
DRAIN
SWITCH
OUTLET
SENSOR
FLUE
SENSOR
INLET
SENSOR
28
OUTDOOR
27
26 25
24 23
22 21 20
(-)
19
(+)
18 17
CASCADE
16
CABLE
15 14
(-)
13
Tx
12
Rx
11
(+)
10
9
PROVING
8 7 6 5 4 3 2 1
LOW VOLTAGE
120 VAC
GROUNDING
SENSOR
SYSTEM SUPPLY
SENSOR
SYSTEM RETURN
SENSOR
TANK
SENSOR
0-10VDC
RS232C
LOUVER
3-WAY VALVE
BOILER
TANK
T'STAT
REMOTE
ENABLE
1
2
3
1
2
3
O/BK
BR
BL
Y
O
W
BK
LBL2365 REV A
Page 79
79
12 Ladder diagram
L
BOILER SUPPLY
LOUVER
CONTACTS
BLOWER
RELAY
LOUVER
RELAY
PROOF OF
CLOSURE RELAY
PROOF OF
CLOSURE VALVE
BLOWER
1
2
3
N
G
BOILER
SUPPLY
PUMP
SUPPLY
L
IN
SYSTEM
PUMP RELAY
OUT
SYSTEM
PUMP
BOILER
PUMP
DWH PUMP
IN
OUT
IN
OUT
BOILER
PUMP RELAY
DWH
PUMP
RELAY
PUMP
SUPPLY
N
ON/OFF
SWITCH
SILENCE
SWITCH
ALARM
ALARM
CONTACTS
X3-4X3-3
X1-6
F5
5A
F3
3.15A
X1-1
SYSTEM PUMP
RELAY
BOILER PUMP RELAY
DHW PUMP RELAY
BLOWER RELAY
X1-2
X1-4
X2-7
X1-3
X1-12
HSI
X2-2
X2-1
F2
5A
F2
X2-6
GAS VALVE
X2-3
X3-1
X3-2
RUN-TIME
CONTACTS
F7
1.6A
X1-7 X1-5 X1-8 X1-10
X6-18
X6-17
X6-9
X6-8
1
2
4
5
BLOWER
X6-1
X6-3
LOW PRESSURE
AIR SWITCH
X6-10
CN2-1
CN2-2
220
Ω
,5W
220
Ω
,5W
X6-12
MANUAL RESET
HIGH LIMIT
X6-4
X6-13
PROOF OF
CLOSURE RELAY
PROOF OF CLOSURE
SWITCH
LOW GAS
PRESSURE SWITCH
HIGH GAS
PRESSURE SWITCH
LOUVER
RELAY
X6-5
X6-14
CN2-8
10
9
CN2-9
LOUVER
PROVING
SWITCH
CONNECTION
BOARD
BLOCKED
DRAIN
SWITCH
AUTO-RESET
HIGH LIMIT
X6-15
X8-9
X8-10
X8-20
X8-19
CN1-7
CN1-6
11
12
13
14
RS232 PORT
220
Ω
,5W
X5-1
X5-5
X5-2
X5-6
X5-3
X5-7
X5-4
X5-8
X6-6
X6-16
X6-7
X6-11
X6-2
CN2-11
CN2-12
CN2-6
CN2-5
2
4
5
6
21
22
23
24
25
26
27
28
ENABLE
TANK
THERMOSTAT
3-WAY VALVE
COM
OP
CL
24V
7
3
1
CN2-4
CONNECTION
BOARD
CN1-10
CN1-9
CN1-1
CN1-2
CN1-3
X8-12
X8-13
X8-14
X8-11
X8-1
TANK
SENSOR
SYSTEM RETURN SENSOR
SYSTEM SUPPLY SENSOR
OUTDOOR
SENSOR
CONNECTION
BOARD
X8-2
X8-3
X8-4
OUTLET SENSOR
INLET
SENSOR
FLUE
SENSOR
INTERGRATED
CONTROL
BOARD
BOX DEPICTS
OPTIONAL ITEMS
120 VAC
LOW VOLTAGE
8
TERMINAL
STRIP
1
2
3
3
1
CONNECTION
BOARD
21 3
CN1-8
CN1-16
CN2-7
1
2
CHASSIS
4
X8-5
X8-15
CN1-12
CN1-11
X8-7
X8-17
CN1-15
CN1-14
X8-18 CN 1-13
15
16
17
18
MODEL DPENDENT
CASCADE
0-10VDC
20
19
ALARM RELAY
VENTILATION FAN
ALARM
CONTACTS
ALARM RELAY
CHASSIS
CONNECTION
BOARD
CN2-10
FLOW
SWITCH
6
4
5
J3-6
J3-4
J3-5
J3-2
J3-3
J2-3
J2-2
J2-1
TEST
RESET
2
3
LWCO
PROBE
LOW WATER
CUTOFF
1.6A
24VAC
(
(((
(
WHERE POSSIBLE, SWITCHES ARE SHOWN WITHOUT UTILITIES (GAS,
WATER OR ELECTRICITY) CONNECTED TO THE UNIT. AS SUCH, ACTUAL
SWITCH STATES MAY VARY FROM THOSE SHOWN ON DIAGRAMS
DEPENDING UPON WHETHER UTILITIES ARE CONNECTED OR A FAULT
CONDITION IS PRESENT. SEE WIRING DIAGRAM FOR ADDITIONAL NOTES.
LBL2366 REV A
Installation & Operation Manual
Page 80
Revision Notes: Revision B (PBX-PFX-I&O-Rev B) reflects the addition of Models 502 - 1302 to the manual.
Revision C (PBX-PFX-I&O-Rev C) reflects the changes made to the Venting, LWCO, and Gas Connections sections.
Revision D (ECO #C02751) reflects the addition of the Maintenance Section to the manual.
Revision E (ECO #C02870) reflects changes made to the scald section, page 71 and the addition of the mixing valve to FIG’s 9-1 thru 9-4, pages 65 - 68.
PBX-PFX-I&O Rev E
CP-5M-1/09
Loading...