
INSTALLATION INSTRUCTIONS FOR 4167
Junction
Box
Mounting
Screw
Box
Screw
Crossbar
A
B
D
E
F
C
G
White or
HOUSE
Black
WIRES
(Hot)
Smooth
FIXTURE
WIRES
Black or
Ribbed
WIRES
FIXTURE
Bare Copper(Ground)
FIXTURE
WIRES
Copper
(Ground)
HOUSE
(Neutral)
WIRES
White
Bare
Green or
WIRES
HOUSE
Listed
U
L
R
For Flush Mount Ceiling Fixtures
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER .
MOUNTING
MOUNTING
MOUNTING
MOUNTING THE
1. Shut off the power at the circuit breaker box. Remove old
fixture and all hardware from Junction Box.
2. Carefully unpack your new fixture and lay out all the parts
on a clear area. Take care not to lose any small parts
necessary for installation.
3. Attach the mounting screw part way into the side hole of the
crook cross bar , then lock it securely with hex nut until
becoming .
4. Attach the cross bar to the Junction Box with the two Box
screws as shown. The side of the cross bar marked " GND "
must face out.
5. While holding the column assembly towards the ceiling,
connect the electrical wires as Shown in Fig.2, making
sure that all wire nuts are secured.
the connections with electrical tape. If your outlet has a
ground wire (green or bare copper) , connect the fixture
ground wire to it . Otherwise connect fixture’s ground wire
directly to the Mounting strap with the green screw
provided. After wires are connected, tuck them carefully
inside the Junction Box.
6. P ut fixture body (A) onto the junction box, aligning screws
on mounting strap with mounting holes in canopy and lock
it securely with the ball nut(G).
7. Thread pipe frame ( C ) into the nipple bottom of fixture
body,then fix it tightly with hex nut (B) .
8.
8.
8.
8. Install the light bulbs in accordance with the fixture’s
specifications. NOTE:
SPECIFIED
SPECIFIED
SPECIFIED
SPECIFIED
9. Attach the glass shade ( D) to the fixture body (A), then
fasten the screw (C) and attach the cover ( E ) using the finial
( F ) by turning it clockwise until tigh .
THE
FIXTURE
THE
FIXTURE
THE FIXTURE
FIXTURE (Fig.1)
NOTE:
NOTE:
NOTE: DO
WATTAGE.
WATTAGE.
WATTAGE.
WATTAGE.
(Fig.1)
(Fig.1)
(Fig.1)
DO
DO
DO NOT
NOT
NOT
NOT EXCEED
You
may have to wrap
EXCEED
EXCEED
EXCEED THE
THE
THE
THE
Fig.1
Your
Your
Your
Your
junction
junction
junction
junction box
Fig. 2
installation
installation
installation
installation is
box
and
box
and
box and
and test
is
now
is
now
is now
now complete.
test
the
test
the
test the
the fixture.
complete.
complete.
complete. Return
fixture.
fixture.
fixture.
Return
Return
Return power
power
power
power to
to
to
to the
the
the
the
MIN 90 ℃ SUPPLY CONDUCTORS