READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE.
LOCKING SCREW
LINE UP BOTTOM EDGE WITH BOTTOM OF WOOD JOIST
MOUNTING FRAME
CENTERING SLOTS
ADJUSTABLE MOUNTING BARS
T-BAR
1" MAX
1-1/2" MAX.
G1 G2
Fig. G
Fig. E
ADJUSTABLE MOUNTING BARS
MOUNTING FRAME (NARROW SIDE)
LINE UP BOTTOM EDGE WITH BOTTOM OF WOOD JOIST
Fig. F
ADJUSTABLE MOUNTING BARS
Fig. A
1. Frame-In
Fig. B
2. Close-in
Fig. C
3. Snap-On
Fig. D
4. Push-Up
This fixture is intended for installation in accordance with the National Electrical Code and local or Federal code specifications. To assure full compliance with codes and regulations, check with your local electrical inspector before installation. T o prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
Installation of Lytecaster®Frame-in-Kit 1100F Series
INSTRUCTION SHEET NO.
IS:1100F
D0605 Page 1of 2
NEW CONSTRUCTION
1. FRAME-IN (FIG. A)
NOTE: ADJUSTABLE MOUNTING BARS are pre-assembled on long side of
2. CLOSE-IN (FIG. B)
NOTE: For wet plaster ceiling, use Plaster Ring Accessory No. 1961 - order
3. SNAP-ON (FIG. C) See separate instruction sheet
4. PUSH-UP (FIG. D) for your choice of reflector trim.
WARNING – (RISK OF FIRE)
Do not install insulation within 3 inches of fixture sides or wiring
compartments, nor above fixture in such a manner as to entrap heat.
WOOD JOIST/METALSTUD CONSTRUCTION (FIG. E): Line up bot­tom edge of ADJUSTABLE MOUNTING BARwith bottom of wood joist. Fasten MOUNTING FRAME to TABor nail into joist.
SUSPENDED GRID CEILING (FIG. G):
WIRE TO SUPPLY LEADS:
For cable, use built-in cable clamp in J-Box. Connect white fixture leads to neutral (white) supply leads. Black fixture leads to hot (black) supply leads. Bare fixture wire to supply ground. Use wirenuts (local hardware item). Place all electrical connections in the J-Box, attach J­Box cover.
MOUNTING FRAME for rigidity and ease of installation (Fig. E). MOUNTING BARS must be removed and installed on narrow side of MOUNTING FRAME if installing in 16” joist spacing (Fig. F).
MOUNTING BARS can be extended to 24”. The MOUNTING FRAME can be mounted off-center.
For suspended ceilings, make certain that bottom of MOUNTING FRAME is no higher than 1” above finished ceiling (Fig. G).
Install plasterboard or other dry type ceiling. Hole in board can be cut either on floor or after the board is secured in the ceiling. Use MOUNT­ING FRAME opening as cutting guide template for hole – make sure ROTO CLIPS are rotated out of hole area.
separately.
wood joist by nailing MOUNTING BAR
U.S. Patent Nos. 5,045,985; 4,313,154; 4,327,403
LIGHTOLIER a GENLYTE company.
631 Airport Road, Fall River, MA 02720
INSTRUCTION SHEET NO.
®
MOUNTING FRAME
BRIDGE
SLOT
Fig. H
ROTO CLIP
STAPLE
MOUNTING FRAME
CEILING MATERIAL
Fig. I
FRAME
J-BOX COVER
J-BOX
J-BOX SPRING J-BOX COVER
Fig. J
IS:1100F
D0605 PAGE 2OF 2
EXISTING CONSTRUCTION
READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE.
This fixture is intended for installation in accordance with the National Electrical Code and local or Federal code specifications. To assure full compliance with codes and regulations, check with your local electrical inspector before installation. T o prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
Fig. A
1. Cut-Opening
Fig. B
2. Wire-in
Fig. C
3. Put Through
1. CUT OPENING (FIG. A AND FIG H)
a. Remove ADJUSTABLE MOUNTING BARS. b. Use MOUNTING FRAME opening as template. c. Break off BRIDGE on MOUNTING FRAME as shown in
Fig. H by breaking WEBS on SLOTS with cutting plier.
2. WIRE-IN (FIG. B)
For cable, use built in Cable Clamp in J-BOX. Connect white fixture lead to neutral (white) supply lead. Black fixture leads to hot (black) supply lead. Bare copper and/or green insulated wire(s) must all be connected to supply ground. Use wire nuts (local hardware items). Place all electrical connections in the J-BOX. Attach J-BOX COVER onto J-BOX.
3. PUT THROUGH (FIG. C AND FIG. J)
Detach BALLAST ASSEMBLYfrom J-BOX and pass MOUNTING FRAME into ceiling as shown in Fig. C. Reattach BALLAST ASSEMBLY.
4. ANCHOR (FIG. D AND FIG. I)
Using STAPLE (order separately Cat. #1985S), slide long end under­neath raised embossing and short leg into ceiling (Fig. I).
5. SNAP-ON (FIG. E) See separate instruction sheet
6. PUSH-UP (FIG. F) for your choice of reflector trim.
BALLAST REPLACEMENT (FIG. J) NOTE: Ballast replacement must be provided by a “qualified electrician”.
1. TURN OFF POWER.
2. Remove reflector trim from FRAME-IN KIT.
3. Remove J-BOX COVER nearest ceiling opening by lifting SPRING.
4. Disconnect all input wiring to ballast.
5. Remove BALLAST ASSEMBLYfrom J-BOX by pulling SPRINGupward (Fig. J).
6. Remove BALLAST ASSEMBLYthrough ceiling opening.
7. Release all wires from BALLAST WIRE CONNECTORS by inserting small blade tool, with insulated handle, into WIRE RELEASE SLOTS. (Fig K).
NOTE: Replacement ballast kits generally are supplied with this special
wire release tool.
8. Remove (2) NUTS which hold BALLAST to J-BOX COVER.
9. Replace old BALLAST with new BALLAST and attach with NUTS to J-BOX COVER.
10.Reassemble new BALLAST ASSEMBLY to J-BOXby snapping onto J-BOX spring (Fig. J).
11.Rewire fixture. See WIRINGDIAGRAM on BALLAST LABEL.
Fig. D
4. Anchor
REMOVE
Fig. E
5. Snap-on
INSERT
Fig. F
6. Push-up
WIRE RELEASE
BLADE
(BY OTHERS)
WIRE RELEASE
SLOTS