Lightolier 1001FEM, 1101FEM, 1101FEL User Manual

p
This luminaire is intended for installation in accordance with the National Electrical Code and local regulations.
To assure full compliance with local codes and regulations, check with your local electrical inspector before
installation. To prevent electric shock, turn off electricity at main power supply before proceeding.
Lytecaster® 1001FEM, 1101FEM and 1101FEL Series Frame-In Kits with Emergency Backu
CAUTION: USE ONLY WITH REFLECTOR TRIMS PROVIDED BY LIGHTOLIER. USE OF OTHER MANUFACTURER’S TRIMS
CAUTION: BEFORE INSTALLING FRAME-IN KIT AND REFLECTOR TRIM, READ ALL MARKINGS ON FRAME-IN KIT AND
INSTALLATION INSTRUCTIONS FOR GRID CEILING APPLICATIONS 1
2
3
MAY VOID THE UNDERWRITERS LABORATORIES LISTING AND COULD CONSTITUTE A FIRE HAZARD.
PREPARATION: Cut appropriately sized hole in Ceiling Tile (by others) at
the position desired and place Ceiling Tile in Grid (by others) (F igure A). Loosen Wing Nuts on Frame Clamps enough to allow free movement of Mounting Bars (Figure B).
POSITION LUMINAIRE FRAME: Place Luminaire Frame on top of Ceiling Tile and center the frame aperture on the Ceiling Tile hole cut in Step 1 so that the aperture wall extends into the Ceiling Tile. Orient the Luminaire Frame to align with the grid (Figure C). Grasp the T-Bar Clips on each end, one in each hand, lift the clips to the top of the adjustment slots in the End bracket, extend the End brackets to contact the Ceiling Grid, and drop each T-Bar Clip over the Grid (Figure D).
NOTE: When the Luminaire Frame is to be used with Wall Wash Trims make sure to orient the Luminaire Frame side indicated by a label on the frame towards the wall to be illuminated.
CLAMP TO GRID and LOCK LUMINAIRE FRAME: Making certain that the Luminaire Frame is still centered on the Ceiling Tile, tighten the T-Bar Clip Wing Nuts to attach the frame to the Ceiling Grid (Figure E). Retighten the Wing Nuts on the Frame Lock Clamps after the frame is positioned satisfactorily and is locked to the Ceiling Grid.
READ AND UNDERSTAND THESE INSTRUCTIONS
BEFORE INSTALLING LUMINAIRE.
Retain these instructions for maintenance reference.
INSTALLATION PROCEDURE FOR:
CAUTION: (RISK OF FIRE) THIS IS A NON-IC RATED FRAME-IN KIT.
DO NOT INSTALL INSULATION ABOVE OR WITHIN 3 INCHES (76mm) OF ANY PART OF LUMINAIRE.
REFLECTOR TO DETERMINE LAMP WATTAGE AND TYPE APPLICABLE FOR YOUR INSTALLATION.
1001FEM SERIES 5-1/4” (134mm) DIA 1101FEM SERIES 6-15/16” (176mm) DIA
1101FEL SERIES 6-15/16” (176mm) DIA
INSTRUCTION SHEET NO.
IS:1101FEM
D1007
APERTURE HOLE SIZE
Page 1 of 4
Figure A
Figure B
BALLAST REPLACEMENT: Ballast replacement must be performed by a “qualified electrician”. TURN OFF POWER. Remove
*
reflector trim from luminaire. Remove j-box cover nearest the ceiling opening to which the ballast is mounted by lifting the spring. Remove ballast assembly through the ceiling hole. Disconnect all input wiring to the ballast. Release all wires from ballast wire connectors by inserting small blade tool, with insulated handle, into wire release slots (Figure F). Remove ballast from j-box door and replace with new ballast. Rewire and reassemble.
REFLECTOR TRIM INSTALLATION: See separate Trim Instruction Sheet for installation procedure.
*
Figure C
Figure D
Figure E
A COMPANY
Figure F
631 Airport Road, Fall River, MA 02720
p
1001FEM, 1101FEM and 1101FEL Series Frame-In Kits
IMPORTANT SAFEGUARDS
INSTALLATION INSTRUCTIONS FOR WOOD FRAME CEILING APPLICATIONS
PREPARATION: Remove Wing Nuts on T-Bar Clips and remove clips from Luminaire Frame. Loosen Wing Nuts on
1
Frame Clamps enough to allow free movement of Mounting Bars (Figure A). The Mounting Bars may be readily adjusted to fit openings between 13” (330mm) minimum and 24” (610mm) maximum.
POSITION AND INSTALL LUMINAIRE FRAME: Position Luminaire Frame between joists with the End bracket at
2
one end placed against, and flush to the bottom of, the joist (Figure B). When positioned, hammer the integral nailing tabs at both ends of the End bracket into the joist (Figure C). Extend the End bracket at the opposite end of the Luminaire Frame until it contacts the opposite joist. Align and attach. The frame can be fully secured by driving a nail or screw through any of the holes provided at each end of the End bracket. Slide the Luminaire Frame along the Mounting Bars until the aperture is in the desired position and lock the Frame in place by tightening the Wing Nuts on the Frame Clamps.
NOTE: When the Luminaire Frame is to be used with Wall Wash Trims make sure to orient the Luminaire Frame side indicated by a label on the frame towards the wall to be illuminated.
INSTALLATION OPTION FOR REGIONS USING STRAPPING: The Luminaire Frame may be installed directly to strapping as above by screwing the End Bracket to the strapping using the hole provided. The Nailing Tab is not used
*
in this case. Optionally, the Luminaire Frame may be attached to the joists between strapping, and positi oned 5/8” lower to
account for the strapping thickness, by bending the provided End bracket tabs 90˚ as shown (Figure D) with a pair of pliers. These bent tabs may now be used to position the Luminaire Frame vertically with reference to the joists so that the frame is flush to the strapping. Attach the Luminaire Frame to the joists as described above (Figure E).
INSTALLATION PROCEDURE FOR:
with Emergency Backup
READ AND FOLLOW ALL SAFETY INSTRUCTIONS
INSTRUCTION SHEET NO.
IS:1101FEM
D1007
Page 2 of 4
Figure C
Figure A
Figure B
WIRING:
1. Make sure A.C. power is off at the main power supply.
2. A.C. Ballast and Emergency Ballast must be fed from the same branch circuit.
3. In switched luminaire installations the Emergency Ballast must be connected ahead of any local switching.
4. Check markings on fixture before making connections in junction box. See additional battery pack instruction sheet for wiring diagrams.
5. Be sure all electrical connections are made before connecting UNIT CONNECT OR located in JUNCTION BOX.
Figure D
631 Air
Figure E
A COMPANY
ort Road, Fall River, MA 02720
Loading...
+ 2 hidden pages