2 Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Protection Performance 3
Warranty 4
Lightning Protection 4
General Safety Guidelines 5
Recommended Installation Method 5
Checking Lightning Protection
Components Supplied 13
LPI Stormaster ESE Installation 13
Installation of the Lightning Earth 14
Ground Resistance Lowering Compounds 16
Bonding the Lightning Earth 16
Labelling 16
Installation of the HVSC Downconductor 16
Hauling the HVSC Downconductor 17
HVSC Downconductor clearance holes 18
Routing 19
Fixing the HVSC Downconductor 21
Installation of Conventional
Downconductors 21
Installation of Stormaster GI Terminal
to threaded pipe 23
Termination of the HVSC Lower End 25
Lower Termination of Conventional
Downconductor to the Lightning Earth 28
Termination of the HVSC Upper End 29
Connection of Factory Pre-Terminated HVSC
(Upper End) to Stormaster Terminal 35
Labelling 35
Masts 36
Types of Mast Configurations 36
Mast Bases 37
Mast Couplings and Guying Points 38
Guying 39
Preparation for raising the Mast into
position 40
Raising of the Mast 40
Lightning Strike Recorder (LSR1) 42
Certification 44
Operation and Maintenance 44
Testing the Stormaster Terminal 45
Testing the Lightning Earth and the
HVSC Downconductor 45
Contents