LIGHTNING PROTECTION INTERNATIONAL PTY LTD
www.lpi.com.au
2
Contents
Protection Performance 3
Warranty 5
Lightning Protection 6
General Safety Guidelines 7
Recommended Installation Method 7
Checking Lightning Protection
Components Supplied 16
LPI Stormaster ESE Installation 16
Installation of the Lightning Earth 17
Earth Enhancing Compounds 18
Bonding the Lightning Earth 18
Labelling 19
Installation of the HVSC Plus
Downconductor 19
Hauling the HVSC Plus
Downconductor 19
HVSC Plus Downconductor Clearance
Holes 21
Routing 21
Fixing the HVSC Plus Downconductor 22
Installation of Conventional
Downconductors 23
Installation of Stormaster GI Terminal
to Threaded Pipe 25
Termination of the HVSC Plus
Lower End 26
Lower Termination of Conventional
Downconductor to the Lightning
Earth 30
Upper Termination Instructions for
UTERMKIT-Mk3 (Heatshrink) 30
Termination of the HVSC Plus Upper
End 30
Upper Termination Instructions for
UTERMKIT-Mk3 (Heatshrink) 31
Connection of Factory Pre-Terminated
HVSC Plus (Upper End) to Stormaster
ESE Terminal 36
Labelling 36
Masts 36
Types of Mast Configurations 37
Cantilevered 37
Guyed 37
Freestanding 37
Mast Bases 38
Mast Couplings and Guying Points 38
Guying 39
Preparation for Raising the Mast into
Position 40
Raising of the Mast 40
Lightning Strike Recorder (LSR1) 42
Certification 44
Operation and Maintenance 44
Testing the Stormaster Terminal 45
Testing the HVSC Plus Downconductor 45
Testing the Lightning Earth 46
Record of Earth Resistance Readings
Table 48
Installation Notes 48