17 LM
T-Rail Wire
Rubber
Channel
Header
Flush to 1/2” from edge
Rubber
Channel
SIDE VIEW
T-rail
1. Measure and cut sufficient rubber channel
to fit over the entire length of the rail
(flush to 1/2” on each end)
Rubber
Channel
Open Slide
Staple
2” Stack
Bell
Wire
T-rail
3. The molding can accommodate up to 3
strands of bell wire. Staple wires to header
wall; then allow at least 2” of slack as
shown. Thread wires through molding.
Hanging
Basket
2”
slack
Rubber
Channel
Chain Link
Retainer
Flange
CROSS SECTION
2. When applying rubber
channel, make sure the open
side is away from the chain
link retainer flange on the
trolley as shown.
114A1704
T-rail
Closed
Side Of
Rubber
Channel
Opener
4. At the opener end allow at least 2” of slack.
Then thread the bell wire through a hanging
bracket hole to keep wires away from sprocket
and chain. Attach wires to opener terminals
according to installation instructions.
Bell Wire