Lift-Master 17LM User Manual

17 LM
T-Rail Wire
Rubber
Channel
Header
Flush to 1/2” from edge
Rubber Channel
T-rail
1. Measure and cut sufficient rubber channel to fit over the entire length of the rail (flush to 1/2” on each end)
Rubber Channel
Open Slide
Staple
2” Stack
Bell Wire
T-rail
3. The molding can accommodate up to 3 strands of bell wire. Staple wires to header wall; then allow at least 2” of slack as shown. Thread wires through molding.
Hanging Basket
2” slack
Rubber Channel
Chain Link Retainer Flange
CROSS SECTION
2. When applying rubber channel, make sure the open side is away from the chain link retainer flange on the trolley as shown.
114A1704
T-rail
Closed Side Of Rubber Channel
Opener
4. At the opener end allow at least 2” of slack. Then thread the bell wire through a hanging bracket hole to keep wires away from sprocket and chain. Attach wires to opener terminals according to installation instructions.
Bell Wire
Loading...