The SM82 comes partially assembled. Follow the steps below to complete the assembly.
WARNING: COMPONENTS OF THE SM82 ARE LARGE AND HEAVY. USE CAUTION
WHEN ASSEMBLING THIS MACHINE.
MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY
1/2”, 3/8”, 5/8” & 9/16”
Socket wrench with
extension
You will also need a piano dolly to lift and position the weight stacks and a ladder.
1/8”
hex key wrench
5/8” & 9/16”
Combination wrench
Pinch bar
ASSEMBLY TIME
Two people can accomplish this assembly in approximately 2-1/2 hours.
2
UNPACKING
Follow the steps below when unpacking the components of the SM82.
1. Cut off the shipping wrapper.
2. Remove the parts boxes and shipping boards.
3. Remove the items in the parts boxes. These items are shown in Figure 1.
A. Remove the bolts bag.
B. Remove the parts shown below. Parts that are used to build the SM82 are
described in the section HARDWARE at the end of these instructions.
SM82 Unpacking & Assembly Instructions
Figure 1. Parts box contents (box 1 on left, box 2 on right).
3
SM82 Unpacking & Assembly Instructions
g
)
ASSEMBLY
Figure 2 shows an assembled SM82.
Figure 2. SM82 main components (seats and cables removed for clarity).
1. Cubes (2)
2. Low row bench (2)
3. Lat bench (2)
4. Connecting beam (1)
1. Place the two weight “cubes” in their “final resting spots.” The cubes will be
approximately 11’4” apart as shown in Figure 3.
5. Lat tops (2)
6. Tricep top (1)
7. Adj. X-over top (1)
8. 300 lb. Weight stacks (4)
9. 190 lb. Wei
ht stacks (4
4
SM82 Unpacking & Assembly Instructions
Figure 3. Set the weight stack cubes.
Figure 4. Configuration for 2-3/4” and 3” bolts.
5
SM82 Unpacking & Assembly Instructions
Figure 5. Configuration for 6” bolts.
2. Bolt on the teardrop pulleys above the benches (see Figure 6) on both cubes using
two 3/8” x 2-3/4” hex head bolts. Include the 3/8” flat washer, end cap washers, end caps
and 3/8” Nyloc (locknut). Use the bolt configuration shown. You may wish to use a pinch
bar to align the bolt holes.
Figure 6. Bolt on the teardrop pulleys.
3. Bolt connecting beam to cubes (part 4 from Figure 2) using a 5/8” socket with
extension and combination wrench. Use two of the large 7/16” x 6” bolts, 7/16” washers,
and 7/16” end cap washers and end caps. Figure 7 shows the connected cubes.
6
T
n
U
3/8” x 3” (4)
bolt top
beams together
SM82 Unpacking & Assembly Instructions
7/16” x 6” (8)
mount on tops
T
V
Remove pulleys from
housings to give clearance
to socket extensio
Figure 7. Bolt on the connecting beam, lat tops, tricep tops.
4. Mount the 56” lat tops (part T) to the cubes using a 5/8” socket and combination wrench
by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown in
Figure 7. Mount the 29” tricep tops (part U) to the cubes using the 7/16” x 6” bolts.
Secure to the lat tops using the 3/8” x 3” bolts. Use the hardware configuration shown in
Figure 7. You will need to remove the pulleys from the teardrop pulley assemblies to gain
clearance for the socket wrench extension. Leave the pulleys out of the housings until the
cables have been installed.
Figure 8. Mount rubber bumpers and the weight stacks.
7
SM82 Unpacking & Assembly Instructions
5. Install the weight stacks. To do this:
A. Use a 9/16” socket and combination wrench and remove the tricep back rest
bolts (see Figure 9).
B. Use a 9/16” socket and combination wrench and unbolt the top plate and remove
the guide rods (see Figure 9).
Figure 9. Remove the tricep back rest, the top plate and the guide rods.
C. Prepare the weight stack. Slide the guide rods (2) through the weight stacks (1)
as shown below. Place rubber bumpers (3) on the bottoms of each guide rod.
Make sure the pull pin (4) is in the bottom weight plate.
D. Flip over the weight stacks. When shipped, the weight stacks have the pull pins
facing upward. You will need to flip the stacks over so that the pull pins are facing
outward when they are loaded onto the machine. Since the pull pins will be facing
downward when they are flipped over, it is recommended that you put the stacks
on a padded carpet to keep the pins from being damaged.
E. Set the weight stacks onto the machine. Using a piano dolly, lift the weight
stacks over the bottom plate and set the stacks onto the rubber bumpers with the
plate numbers facing outward. The 300 lb weight stacks need to be facing the
“sides” of the cells (where the benches will be attached- number 8 in Figure 9).
The 190 lb weight stacks will need to be facing the “outsides” and “insides” of the
cells (where the tricep pulleys and crossover pulleys will be attached- number 9 in
Figure 8). Make sure the pull pins are facing outward.
8
Loading...
+ 16 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.