The SM63 comes partially assembled. Follow the steps below to complete the assembly.
WARNING: COMPONENTS OF THE SM63 ARE LARGE AND HEAVY. USE CAUTION
WHEN ASSEMBLING THIS MACHINE.
MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY
1/2”, 3/8”, 5/8” & 9/16”
Socket wrench with
10” long extension
You will also need a piano dolly to lift and position the weight stacks and a ladder.
1/8”
hex key wrench
5/8” & 9/16”, 7/8”
Combination wrench
Pinch bar
ASSEMBLY TIME
Two people can accomplish this assembly in approximately 2-1/2 hours.
2
UNPACKING
Follow the steps below when unpacking the components of the SM63.
1. Cut off the shipping wrapper.
2. Remove the parts boxes and shipping boards.
3. Remove the items in the parts boxes. These items are shown in Figure 1.
A. Remove the bolts bag.
B. Remove the parts shown below. Parts that are used to build the SM63 are
described in the section HARDWARE at the end of these instructions.
SM63 Unpacking & Assembly Instructions
Figure 1. Parts box contents (box 1 on left, box 2 on right).
3
SM63 Unpacking & Assembly Instructions
ASSEMBLY
Figure 2 shows an assembled SM63.
5
4
3
6
1
4
2
7
Figure 2. SM63 main components.
1. Cubes (2)
2. Lat bench (2)
3. Connecting beam (1)
4. Lat tops (2)
1. Place the two weight “cubes” in their “final resting spots.” The cubes will be
approximately 11’4” apart as shown in Figure 3.
5. Tricep top (1)
6. Adj. X-over top (1)
7. 300 lb. Weight stacks (4)
8. 190 lb. Weight stacks (4)
2
1
8
4
SM63 Unpacking & Assembly Instructions
Figure 3. Set the weight stack cubes.
2. Bolt on the teardrop pulley assemblies above the benches (see Figure 4) on both
cubes using two 3/8” x 2-3/4” hex head bolts. Include the 3/8” flat washer, end cap
washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown in
Figure 5. You may wish to use a pinch bar to align the bolt holes.
Figure 4. Bolt on the teardrop pulleys.
5
SM63 Unpacking & Assembly Instructions
Figure 5. Configuration for 2-3/4” and 3” bolts.
3. Using a 5/8” socket with long extension and combination wrench, bolt on the
connecting beam to the cubes using two of the large 7/16” x 6” bolts, 7/16” washers,
and 7/16” nuts, end cap washers and end caps. Figure 6 shows the connected cubes.
You will need to remove the pulleys from the teardrop pulley assemblies to gain
clearance for the socket wrench extension. Leave the pulleys out of the housings until
the cables have been installed.
6
Remove pulleys from
housings to give clearance
to socket extension
SM63 Unpacking & Assembly Instructions
7/16” x 6” (2)mount on tops
Figure 6. Bolt on the connecting beam.
7