Life Fitness SM61 User Manual

6 STACK MULTI-JUNGLE (SM61)
WITH 2 ADJUSTABLE PULLEYS

UNPACKING AND ASSEMBLY INSTRUCTIONS

M051-K50-A137 1
SM61 Unpacking & Assembly Instructions
The SM61 comes partially assembled. Follow the steps below to complete the assembly.
WARNING: COMPONENTS OF THE SM61 ARE LARGE AND HEAVY. USE CAUTION WHEN ASSEMBLING THIS MACHINE.

MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY

1/2”, 3/8”, 5/8” & 9/16” Socket wrench with extension
You will also need a ladder and a piano dolly to lift and position the weight stacks.
1/8” hex key wrench
5/8” & 9/16” Combination wrench
Pinch bar

ASSEMBLY TIME

Two people can accomplish this assembly in approximately 2 hours.
2

UNPACKING

Follow the steps below when unpacking the components of the SM61.
1. Cut off the shipping wrapper.
2. Remove the parts boxes and shipping boards.
3. Remove the items in the parts boxes. These items are shown in Figure 1. A. Remove the bolts bag. B. Remove the parts shown below. Parts that are used to build the SM61 are
described in the section HARDWARE at the end of these instructions.
SM61 Unpacking & Assembly Instructions
Figure 1. Parts box contents (box 1 on left, box 2 on right).
3
SM61 Unpacking & Assembly Instructions

ASSEMBLY

Figure 2 shows an assembled SM61.
5
4
3
1
2
1. Cubes (2)
2. Lat bench (2)
3. Connecting beam (1)
4
6
Figure 2. SM61 main components.
4. Lat tops (2)
5. Tricep top (2)
6. 300 lb. Weight stacks (2)
7. 190 lb. Weight stacks (4)
2
5
1
7
1. Place the two weight “cubes” in their “final resting spots.” The cubes will be approximately 11’4” apart as shown in Figure 3.
4
SM61 Unpacking & Assembly Instructions
Figure 3. Set the weight stack cubes.
2. Bolt on the teardrop pulleys above the lat benches (see Figure 4) on both cubes using two 3/8” x 2-3/4” hex head bolts (used to bolt the cross beam to the cross members and the adjustable pulley tops to the top beams). Include the 3/8” flat washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt holes.
Figure 4. Bolt on the teardrop pulleys.
5
SM61 Unpacking & Assembly Instructions
Figure 5. Configuration for 2-3/4” and 3” bolts.
3. Using a 5/8” socket with extension and combination wrench, bolt on the connecting beam to the cubes using two of the large 7/16” x 6” bolts, 7/16” washers, and 7/16” nuts, end cap washers and end caps. Figure 6 shows the connected cubes.
6
SM61 Unpacking & Assembly Instructions
4. Using a 5/8” socket and combination wrench, mount the 56” lat tops (part T from HARDWARE section) to the cells by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown in Figure 7. Mount the 29” tricep top (part U in HARDWARE section) to the frame and connecting beam (See Figure 6). You will need to remove the pulleys from the teardrop pulley assemblies to gain clearance for the socket wrench extension. Leave the pulleys out of the housings until the cables have been installed.
Figure 6. Mount lat tops and tricep tops.
Figure 7. Configuration for 6” bolts.
7
Loading...
+ 16 hidden pages