2 Ceiling suspended Type Air Conditioner
Room Air Conditioner Installation Manual
TABLE OF CONTENTS
Installation
Requirements
Required Parts Required Tools
Safety Precautions............................3
Introduction........................................8
Symbols used in this manual..........8
Features ...........................................8
Installation ..........................................9
Installation parts...............................9
Installation tools ...............................9
Installation map..............................10
Selecting the best location ...........11
Piping Length and Elevation .........12
Preparing Work for Installation .....12
Mounting the anchor Nut &
Bolt(Ceiling Mounting)...................13
Drill a Hole in the Wall ...................14
Installation instructions of
Indoor Unit installation...................14
Flaring Work...................................15
Connecting of Piping - Indoor .......16
Connection of the pipes-
Outdoor ..........................................18
Connecting the Cables..................18
Checking the Drainage .................21
Forming the Piping ........................22
Air Purging .....................................23
Side Cover Assembly....................25
Test Running..................................26
❏ Four type "A" screws & plastic
anchors
❏ Connecting cable
❏ Installation guide map
❏ Pipes: Gas side ..............3/8", 1/2"
Liquid side ...................1/4"
❏ Insulation materials
❏ Additional drain pipe
(Outer diameter ..............15.5mm)
❏ Twotype"B"screws
❏ Level gauge
❏ Screw driver
❏ Electric drill
❏ Hole core drill
(ø25mm, ø45mm, ø70mm)
❏ Horizontal meter
❏ Flaring tool set
❏ Specified torque wrenches
1.8kg.m, 4.2kg.m, 5.5kg.m,
6.6kg.m
(different depending on model No.)
❏ Spanner ........................Half union
❏ Aglassofwater
❏ Screw driver
❏ Hexagonal wrench(4mm)
❏ Leak detector
❏ Vac uum p ump
❏ Gauge manifold
❏ Owner's manual
❏ Thermometer
❏ Remote control holder