Pipe length and the elevation
Capacity |
Pipe Size |
Standard |
Max. |
Max. |
Additional |
||
|
|
Length |
Elevation |
Length |
Refrigerant |
||
(Btu/h) |
|
|
|||||
GAS |
LIQUID |
||||||
(m) |
B (m) |
A (m) |
(g/m) |
||||
|
|||||||
|
|
|
|
|
|
|
|
18K(60Hz) |
5/8" |
1/4" |
5 |
10 |
20 |
20 |
|
|
|
|
|
|
|
|
|
18K(50Hz) |
1/2" |
1/4" |
5 |
15 |
30 |
30 |
|
|
|
|
|
|
|
|
|
24K(50Hz) |
5/8" |
3/8" |
5 |
15 |
30 |
30 |
|
|
|
|
|
|
|
|
|
26K(50Hz) |
5/8" |
3/8" |
5 |
15 |
30 |
30 |
|
|
|
|
|
|
|
|
Outdoor unit
A
Indoor unit
B
Outdoor unit
Oil trap |
A |
|
Indoor unit
B
In case more than 5m
CAUTION
*Capicity is based on standard length and maximum allowance length is the basis of reliability.
*Oil trap should be installed per 5~7 meters.
* Numerical value in "( )" is for Rotary Comp. model.
- 11 -