EV Charger Mounting Bracket
Installation Instructions
Installing a bracket to a Leviton EVPED-2 pedestal to mount an EV320, EV32W,
EV48W, or EV48S charging station
NOTE: Tools and hardware listed are not included.
®
REQUIRED TOOLS:
• TORX T-27 Security Screw
• Power Drill
• Drill Bit 21/64"
• Wrench 1/2"
• Hammer
• Center Punch
• Metal Exterior Paint
with Rust Inhibitor
STEPS:
1. If the pedestal has not been installed yet, it is
recommended to start the bracket mount with
the pedestal in the horizontal position.
2. Position the bracket on the pedestal 1.5" from the top,
including the top cover (Figure 1).
3. Center the bracket on the pedestal such that the left
and right side are equally spaced.
4. Use tape to hold the bracket in place and mark the
position of the four holes in the bracket on the
pedestal. Use a center punch to mark the center
of the hole.
5. Use a 21/64" drill bit to drill the four bracket holes
into the pedestal.
6. Use touch-up paint on raw drilled holes
(use metal exterior paint with rust inhibitor).
7. The bracket is fastened with four 5/16-18 x 1/2"
bolts and nuts.
8. Insert the bolt from the inside through the pedestal
and bracket. Install the washer with the nut on the
outside.
9. Use a wrench to hold the bolt from the inside when
tightening.
10. Place the EV Charging Station on the bracket by
inserting the top lip first, then aligning the side holes.
11. Insert the side screws and hand tighten.
12. Installation complete!
REQUIRED HARDWARE*:
• 5/16 – 18 x 1/2" HEX Head Bolt (4)
• 5/16 – 18 Nut (4)
• 5/16 ID x 3/4 OD Washer (4)
* Use Galvanized hardware