is a registered trademark of Middleby Marshall, Inc. All rights reserved.
PS536GS Gas Ovens
Models:
•PS536GS Gas
Combinations:
•Single Oven
•Double Oven (Two-Stack)
•Triple Oven (Three-Stack)
OWNER'S OPERATING, INSTALLATION,
AND PARTS MANUAL
for domestic, standard export and CE export ovens
2
ENGLISH
Middleby Cooking Systems Group • 1400 Toastmaster Drive • Elgin, IL 60120 • USA • (847)741-3300 • FAX (847)741-4406
Retain This Manual For Future Reference
NOTICE:
This
Owner's Operating and Installation Manual should be given to the user. The operator of the oven should
be familiar with the functions and operation of the oven.
This manual must be kept in a prominent, easily reachable location near the oven.
Ovens are shipped from the factory configured for use with natural gas. If permitted by local, national and
international codes, at the time of installation the oven may be converted to propane gas operation. This
conversion requires the use of at Gas Conversion Kit that is supplied with the oven. For CE-approved ovens, the
conversion is described in the
Installation
section of this Manual. For domestic and standard export ovens,
instructions are included in the Gas Conversion Kit.
It is suggested to obtain a service contract with a Middleby Marshall Authorized Service Agent.
WARNING
POST, IN A PROMINENT LOCATION, THE EMERGENCY TELEPHONE NUMBER OF YOUR LOCAL GAS
SUPPLIER AND INSTRUCTIONS TO BE FOLLOWED IN THE EVENT YOU SMELL GAS.
Instructions to be followed in the event the user smells gas shall be obtained by consulting the local gas
supplier. If the smell of gas is detected, immediately call the emergency phone number of your local Gas
Company. They will have personnel and provisions available to correct the problem.
FOR YOUR SAFETY
Do not store or use gasoline or other flammable vapors or liquids in the vicinity of
this or any other appliance.
WARNING:
Improper installation, adjustment, alteration, service or maintenance
can cause property damage, injury or death. Read the installation,
operating and maintenance instructions thoroughly before installing
or servicing this equipment.
NOTICE: CONTACT YOUR MIDDLEBY MARSHALL AUTHORIZED SERVICE AGENT TO PERFORM MAINTENANCE
AND REPAIRS. AN AUTHORIZED SERVICE AGENCY DIRECTORY IS SUPPLIED WITH YOUR OVEN.
NOTICE: Using any parts other than genuine Middleby Marshall factory manufactured parts relieves the manufacturer of
all warranty and liability.
NOTICE: Middleby Marshall (Manufacturer) reserves the right to change specifications at any time.
NOTICE: The equipment warranty is not valid unless the oven is installed, started and demonstrated under the supervision
of a factory certified installer.
IMPORTANT
An electrical wiring diagram for the oven is located inside the machinery
compartment.
IMPORTANT
It is the customer's responsibility to report any concealed or non-concealed damage
to the freight company. Retain all shipping materials until it is certain that the
equipment has not suffered concealed shipping damage.
www.middleby.com
24-Hour Service Hotline: 1-(800)-238-8444 • Middleby Customer Care Center: 1-(800)-630-6559
The gas supply pressures and orifice sizes shown are for ovens installed in North America. The required gas supply pressures and orifice
*
sizes of ovens installed in other locations are dependent on the local gas type and on all applicable local codes.
Orifice (Manifold)
Table 1-5: Gas orifice and pressure specifications (per oven cavity) - CE ovens
Supply (Inlet) Pressure
IT,PT,ES,SE,
M a inUK,CH,IT,AT,SE,CH,AT,DK,BE,IE,IT,PT,Or i f iceRated
GasOri f i ceDK,FINLDEBE,FRFI,DE,NLES,UK(Manifold )Heat
Typedi a .
G202.374920--2020----11.2122.36
mmmbarmbarmbarmbarkW-hr.
G252.3749--25----- ---16.1922.36
mmmbarmbarkW-hr.
G301.3970----- ---29 or 5028-30, 3726.222.59
mmmbaror 50 mbarmbarkW-hr.
I
2H
I
2L
I
2E
I
2E +
I
3B /P
I
3+
PressureInput
IMPORTANT
Additional electrical information is provided on the oven's serial plate, and on the wiring diagram inside the machinery
compartment.
ENGLISH
5
ENGLISH
SECTION 2 - INSTALLATION
WARNING - For gas ovens, after any conversions, readjustments, or service work on the oven:
•Perform a gas leak test.
•Test for correct air supply.
•Test for proper combustion and gas supply.
•Check that the ventilation system is in operation.
WARNING
Keep the appliance area free and clear of combustibles.
WARNING
The oven must be installed on an even (level) non-flammable flooring and any adjacent walls must
be non-flammable. Recommended minimum clearances are specified in the
this Manual.
Description
WARNING
Do not obstruct the flow of combustion and ventilation air to and from your oven. There must be no
obstructions around or underneath the oven. Constructional changes to the area where the oven is
installed shall not affect the air supply to the oven.
CAUTION
For additional installation information, contact your local Authorized Service Agent.
section of
NOTE
There must be adequate clearance between the oven and combustible construction. Clearance
must also be provided for servicing and for proper operation.
NOTE
An electrical wiring diagram for the oven is located inside the machinery compartment.
NOTE
All aspects of the oven installation, including placement, utility connections, and ventilation requirements,
must conform with any applicable local, national, or international codes. These codes supersede the
requirements and guidelines provided in this manual.
NOTE
In the USA, the oven installation must conform with local codes. In the absence of local codes, gas oven
installations must conform with the National Fuel Gas Code, ANSI Z223.1. Installed ovens must be
electrically grounded in accordance with local codes, or in the absence of local codes, with the National
Electrical Code (NEC), or ANSI/NFPA70.
NOTE
In Canada, the oven installation must conform with local codes. In the absence of local codes, gas oven
installations must conform with the Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Gas
Installation Code, CAN/CGA-B149.2, as applicable. Installed ovens must be electrically grounded in
accordance with local codes, or in the absence of local codes, with the Canadian Electrical Code CSA C22.2.
NOTE
In Australia, the oven installation must conform with any requirements of the appropriate statutory authority.
Gas oven installtions must conform with AGA Codes AG311 and AG601.
NOTE
In CE countries, all aspects of the gas supply connection must comply with current IEC/CEE requirements and
with all applicable local, national, and international codes. In addition, four casters are provided to allow the oven
to be more easily moved to the installation location. These casters are intended to simplify pre-installation
movement only, and are NOT suitable for use as part of a CE oven installation. During the installation procedure,
the casters MUST be removed, so that the oven can be supported by the supplied 152mm adjustable legs.
6
SECTION 2 - INSTALLATION
Figure 2-1 - Installation Kit
1
2
3
4a, 4b, 4c, 4d
5
6
9
11
10
8
12
14
15
13
16
7
I.INSTALLATION KIT - see Figure 2-1
Qty.Qty.Qty.Inc. withInc. with
SingleDoubleTripledomesticCE
ItemOvenOvenOvenPart No.ovens?ovens?Description
111148605YesYesTop panel
24443A80A8801YesYesScrew, pan head #10 x 2″
311142893YesYesBase pad
4a44--42890YesYes17-1/2″ (445mm) leg extension, for single and
double ovens
4b--4--45360YesYes20-1/2″ (521mm) leg extension, optional
4c--4--45329YesYes25-1/2″ (648mm) leg extension, optional
4d----444799YesYes6″ (152mm) leg extension, for triple ovens
522222290-0009YesNoCaster, with flat plate and brake
6A/RA/RA/R22290-0010YesYesCaster, with flat plate (no brake)
NOTE:
Domestic and standard export ovens include 2 braking casters (item 5) and 2 non-braking casters (Item 6). CE-approved
ovens include 4 non-braking casters (Item 6) SOLELY for the purpose of moving the oven to the installation location. Casters are
NOT suitable for use as part of CE oven installations. Refer to the notice on the preceding page.
744422450-0028NoYesLeg, adjustable, 6″ (152mm)
811121392-0004YesNoEyebolt, 3/4″
9A/RA/RA/R220373YesYesHex bolt, 3/8″-16 x 1″
NOTE:
CE-approved ovens include 32 hex bolts. Domestic and standard export ovens include 31 hex bolts and one eyebolt (item 8)
that acts as an anchor for the restraint cable (Item 12). CE ovens are mounted on legs (Item 7) and do not use a restraint cable.
103 2323221416-0001YesYesFlat washer, 3/8″
113 2323221422-0001YesYesLockwasher, 3/8″
1211122450-0228YesNoRestraint cable assembly
1312322361-0001YesNoGas hose,
3/4″ to 1/2″ Gas hose reducer
included with gas hose.
1411150236YesYes
Owner's Operating and Installation Manual
15111100204 0YesYes
Authorized Service Agency Listing
1611--46393YesYesLower shelf
7
ENGLISH
SECTION 2 - INSTALLATION
Fig. 2-2 - Ventilation System
12" (305mm)
minimum
12" (305mm)
minimum
2" (51mm)
minimum
8" (203mm)
minimum
1" (25mm)
minimum
II. VENTILATION SYSTEM
IMPORTANT
ENGLISH
Where national or local codes require the
installation of fire suppression equip-
ment or other supplementary equipment,
DO NOT mount the equipment directly to
the oven.
MOUNTING SUCH EQUIPMENT ON
THE OVEN MAY:
•VOID AGENCY CERTIFICATIONS
•RESTRICT SERVICE ACCESS
•LEAD TO INCREASED SERVICE EXPENSES FOR THE OWNER
A. Requirements
CAUTION
Gas oven installations
ventilation system with electrical exhaust air sensing control.
A mechanically driven ventilation system is
RECOMMENDED for electric oven installations.
PROPER VENTILATION OF THE OVEN IS T H E
RESPONSIBILITY OF THE OWNER.
REQUIRE a mechanically driven
STRONGLY
B. Recommendations
NOTE THAT THE HOOD DIMENSIONS SHOWN IN FIGURE 22 ARE
RECOMMENDATIONS ONLY. LOCAL, NATIONAL AND
INTERNATIONAL CODES MUST BE FOLLOWED WHEN
INSTALLING THE VENTILATION SYSTEM. ANY APPLICABLE
CODES SUPERSEDE THE RECOMMENDATIONS SHOWN IN
THIS MANUAL.
The rate of air flow exhausted through the ventilation system
may vary depending on the oven configuration and hood design.
Consult the hood manufacturer or ventilation engineer for these
specifications.
To avoid a negative pressure condition in the kitchen area,
return air must be brought back to replenish the air that was
exhausted. A negative pressure in the kitchen can cause heatrelated problems to the oven components as if there were no
ventilation at all. The best method of supplying return air is
through the heating, ventilation and air conditioning (HVAC)
system. Through the HVAC system, the air can be temperaturecontrolled for summer and winter. Return air can also be
brought in directly from outside the building, but detrimental
effects can result from extreme seasonal hot and cold
temperatures from the outdoors.
NOTE: Return air from the mechanically driven system must not
blow at the opening of the baking chamber. Poor oven baking
performance will result.
C. Other ventilation concerns
•Special locations, conditions, or problems may require the
services of a ventilation engineer or specialist.
•Inadequate ventilation can inhibit oven performance.
•It is recommended that the ventilation system and duct
work be checked at prevailing intervals as specified by the
hood manufacturer and/or HVAC engineer or specialist.
8
SECTION 2 - INSTALLATION
III. ASSEMBLY
A. Top Panel and Base Pad Assembly
1. Install the four leg extensions onto the base pad using the
3/8"-16x1" screws, 3/8" flat washers, and 3/8" lockwashers
supplied in the Base Pad Kit. See Figure 2-3. Check that
the finished sides of each leg extension face OUTWARDS.
For domestic and standard export ovens:
One rear leg should be attached using three 3/8"-16 x 1"
screws and the 3/4" eyebolt, as shown in Figure 2-3. This
eyebolt acts as the anchor point for the restraint cable
assembly (see Part C,
Restraint Cable Installation).
2. If your oven is equipped with the lower shelf, position it in
place as shown in Figure 2-3. Check that the lip on the shelf
faces DOWN. Seal joint between leg and shelf with NSF
listed silicone.
3.
For domestic and standard export ovens:
Install one caster onto each leg extension, as shown in
Figure 2-4. Use the 3/8"-16x1" screws, 3/8" flat washers,
and 3/8" lockwashers supplied in the Installation Kit. The
locking casters should be installed at the FRONT of the
oven. The non-locking casters should be installed at the
REAR of the oven.
For CE export ovens:
The Installation Kit includes four casters AND four 152mm
adjustable legs. The casters are provided to allow the oven
to be more easily moved to the installation location, and are
NOT suitable for use as part of the oven installation. Refer
to the notice at the beginning of this Section.
After the oven is at the installation location, install one
152mm adjustable leg into the center hole on the bottom
of each leg extension, as shown in Figure 2-4.
4. Install the lower oven cavity onto the base pad. See Fig. 2-4.
5. For single ovens ONLY, install the top panel using the
screws included in the base pad kit, as shown in Figure 2-
5. Then, skip ahead to Part C,
Restraint Cable Installation.
For double or triple ovens, continue on to Part B,
Stacking.
Note that the top panel should NOT be installed for double
and triple ovens until after stacking the oven cavities.
Figure 2-4 - Base pad installation
#10 x 2"
screws
Bottom oven
ca vi t y
Top
panel
Figure 2-5 - Top panel installation
NOTE:
DO NOT install top panel onto double or triple ovens
until AFTER stacking the oven cavities. See Part B,
Stacking.
Figure 2-3 - Leg extension and casters installation
CE-approved
ovens:
152mm adjustable
leg MUST be used
for installation
Finished sides of
leg extension
face corner of
base pad
Lower
shelf
Locking casters -
FRONT of oven
Non-locking casters -
REAR of oven
3/8" flat
washer
3/8" lock
washer
3/8"-16 x 1"
hex screw
Assembled
base pad
Domestic and
standard export
ovens:
3/8" flat
washer
3/8" lock
washer
3/8"-16 x 1"
hex screw
3/4" eyebolt
(inside corner
of one rear leg
extension
only)
CE ovens
do not use
the
eyebolt.
ENGLISH
9
SECTION 2 - INSTALLATION
Figure 2-7 - Top panel installation
Top
panel
#10 x 2"
screws
C. Restraint Cable Installation
For CE-approved ovens,
skip ahead to Part D, Conveyor
Installation.
For domestic and standard export ovens,
continue with this
Section to install the restraint cable.
Beca use dom est ic a nd standard export ovens are
equipped with casters, a restraint cable assembly must be
installed to limit the movement of the appliance without
depending on the connector and the quick disconnect
device or its associated piping. One end of the cable is
anchored to the eyebolt on one of the rear leg extensions,
while the other is anchored to the wall. See Figure 2-8.
After connecting the restraint cable, move the oven to its
final location. Then, lock the two front casters.
3/8"-16 x 1"
eyebolt on
rear leg
extension
Restraint cable
assembly
3/4” (19mm)
eyebolt
Wall of
structure
Figure 2-8 - Installing the Restraint Cable
B. Stacking
For single ovens, skip ahead to Part C,
Restraint Cable
Installation.
IMPORTANT
Middleby Marshall STRONGLY RECOMMENDS that PS536GS
ENGLISH
oven cavities be stacked using the following:
•PS500 Series Stacking Lift Kit, P/N 30580
•PS536 Stacking Hardware Kit, P/N 46494
Contact your Middleby Marshall Authorized Service Agent for
complete stacking instructions.
Figure 2-6 - Stacking
1. Stack an oven cavity on top of the lower oven. Check the
following:
•All four sides of the lower lip (on the bottom edge of the
oven cavity) overlap the top of the lower oven.
•The oven is level.
•The oven is firmly seated.
See Figure 2-6.
2. For triple ovens, repeat Step 1 to install the top oven cavity.
3. Install the top panel using the screws included in the base pad
kit, as shown in Figure 2-7.
10
SECTION 2 - INSTALLATION
Figure 2-9 - Conveyor installation
Folded
frame
D. Conveyor Installation
1. Unfold the conveyor as shown in Figure 2-9. Then, begin
to slide the conveyor into the end of the oven. The conveyor
can only be installed from the end of the oven
with the drive
motor.
2. Continue moving the conveyor into the oven until the frame
protrudes equally from each end of the oven. Check that the
crumb tray supports located on the underside of the conveyor frame rest firmly against the lower end plugs, as
shown in Figure 2-10.
3. When the conveyor is positioned properly, check for freedom of movement of the conveyor belt by pulling it for about
2-3 feet (0.6-1.0m) with your fingers. The drive and idler
shafts must rotate smoothly, and the belt
must move freely
without rubbing on the inside of the oven.
4. Check the tension of the conveyor belt as shown in Figure
2-11. The belt should lift about 1" (25mm). DO NOT
OVERTIGHTEN THE CONVEYOR BELT.
NOTE:
If necessary, the belt tension can be adjusted by turning the
conveyor adjustment screws, located at the idler (noncontrol) end of the conveyor. See Figure 2-11.
Figure 2-10 - Conveyor placement
Crumb tray
support
bracket
End plug
Figure 2-11 - Conveyor belt tension
Conv eyor
placed in
oven
1" (25mm)
vertical
deflection
Adjustment
screws (2) on
idler end of
conv eyo r
Drive end (with
drive sprocket)
Idler end (with
belt tension
adjustment
screws)
ENGLISH
11
Hang chain cover on
screws in control
compartment wall
Place inside edge
of tray on retainer
bracket
Swing outside
edge of tray up
and into place
Press conveyor end stop
down over edge of
conveyor frame
SECTION 2 - INSTALLATION
Figure 2-13 - Final assembly
Figure 2-12 - Conveyor and master link orientation
Direction
of travel
CORRECT
master link
position
Incorrect
master link
position
5. If it is necessary to add or remove conveyor links to achieve
the correct tension, OR if it is necessary to reverse the
conveyor belt for correct orientation, the belt will need to be
removed from the conveyor frame. If this is necessary,
perform the following procedure:
•Remove the conveyor assembly from the oven and
place it flat on the floor.
•Remove the master links using long-nose pliers.
Then, roll up the belt along the length of the conveyor
frame.
•Add or remove belt links as necessary to achieve the
correct belt tension.
•Replace the belt on the conveyor frame. Check that the
conveyor belt links are oriented as shown in Figure 212, and that the smooth side of the conveyor belt faces
UP.
•Connect the inside master links. Check that the links
are oriented as shown in Figure 2-12.
•Connect the outside master links. Note that the
outside master links each have an open hook on one
side. This hook aligns with the hooks along the sides
of the other conveyor links. See Figure 2-12.
•Replace the conveyor into the oven.
E. Final Assembly
6. Install the drive chain between the conveyor drive sprocket
and the motor sprocket. To install the chain, it will be
necessary to lift the drive end of the conveyor slightly.
7. Install the conveyor chain cover as shown in Figure 2-13.
Check that the chain cover does not bind on the conveyor
sprocket or drive shaft.
8. Install the crumb trays as shown in Figure 2-13.
9. Press the end stop down over the edge of the conveyor
frame at the exit end of the oven, as shown in Figure 2-13.
ENGLISH
12
SECTION 2 - INSTALLATION
IV. ELECTRICAL SUPPLY
WARNING
Authorized supplier personnel normally accomplish
the connections for the ventilation system, electric supply,
and gas supply, as arranged by the customer. Following
these connections, the factory-authorized installer can
perform the initial startup of the oven.
NOTE: The electric supply installation must satisfy the
requirements of the appropriate statutory authority, such as the
National Electrical Code (NEC), ANSI/NFPA70, (U.S.A.); the
Canadian Electrical Code, CSA C22.2; the Australian Code,
AG601; current IEC/CEE requirements (CE countries); or other
applicable regulations.
NOTE: All aspects of the electrical supply connection must
comply with all applicable local, national, and international
code requirements.
Check the oven serial plate before making any electric supply
connections. Electric supply connections must agree with data
on the oven serial plate. The location of the serial plate is shown
in Figure 1-1 (in Section 1,
Description).
A fused disconnect switch or a main circuit breaker (customer
furnished)
MUST be installed in the electric supply line for each
oven cavity. It is recommended that this circuit breaker/disconnect
have lockout/tagout capability. For CE installations, the circuit
breaker/disconnect must have a minimum of 3mm contact
separation breaking all poles of the supply.
The supply conductors must comply with all applicable local,
national and international codes. Supply conductors must be
insulated copper wiring, #18 AWG (American Wire Gauge) or
equivalent. Additional wiring information is shown on the wiring
diagrams in Section 5,
Electrical Wiring Diagrams and inside
the machinery compartment of the oven.
The oven requires a ground connection to the oven ground
screw located in the electrical junction box. (The box is shown
in Figure 2-14.) The ground connection must comply with all
applicable local, national, and international codes. If necessary,
have the electrician supply the ground wire.
Do NOT use the
wiring conduit or other piping for ground connections!
A. Additional Information - Gas Ovens
All electric supply connections are made via the electrical
junction box on the rear of the oven, shown in Figure 2-14. The
power lines then connect to the oven circuits through safety
switches that interrupt electric power to the oven:
•When the Control Compartment Access Panel is opened;
•When the Machinery Compartment Access Panel is opened,
OR
•When the rear panel is removed.
B. Connection
Refer to the wiring diagram inside the machinery compartment,
or in Section 5 of this Manual, to determine the correct
connections for the electrical supply lines. Connect the supply
as indicated on the wiring diagram.
If required by local, national or international codes, connect an
equipotential ground wire to the lug next to the
symbol
(shown in Figure 2-14). The equipotential ground connection
must meet all applicable national and local code requirements.
Figure 2-14 - Utility connection locations
Electrical
Junction Box
1/2" NPT pipe for gas
utility connection
(fitted with 3/4" adapter
for use with supplied
3/4" dia. gas hose)
33mm cutout for
electric utility
connection
Equipotential
ground lug
ENGLISH
13
V. GAS SUPPLY
NOTE:
Certain safety code requirements exist for the installation
of gas ovens; refer to the beginning of Section 2 for a list of the
installation standards. In addition:
•In the USA,
the installation must conform with local codes,
or in the absence of local codes, with the National Fuel Gas
Code, ANSI Z223.1.
•In Canada,
the installation must conform with local codes,
or in the absence of local codes, with the Natural Gas
Installation Code, CAN/CGA-B 149.1, or the Propane
Installation Code, CAN/CGA-B 149.2, as applicable.
•In Australia,
the installation must conform with AGA Codes
AG311 and AG601, and with any requirements of the
appropriate statutory authority.
•In CE countries,
the gas supply connection should be
according to EN-203 (gas appliance directive) and to
applicable ISO 228-1 or ISO 7-1 recommendations. All
aspects of the gas supply connection must comply with
current IEC/CEE requirements and with all applicable
local, national, and international codes.
•For all ovens equipped with casters,
the gas line connection
shall be made with:
-A connector that complies with the Standard for
Connectors for Movable Gas Appliances, ANSI Z21.69
(in USA), or Connectors for Movable Gas Appliances,
CAN/CGA-6.16 (in Canada).
Check the oven’s gas supply requirements to determine the
type of gas to be used with the oven. If the gas type required does
NOT match the local supply:
•For North American installations,
a conversion kit is
supplied with the oven to allow operation using propane
gas. Refer to Part B,
Gas Conversion, in this section.
•For CE ovens, directions for converting the oven for use with
other gases are described in Part D.1,
Preparation for Use
with Various Gases, in this section.
If the installation will use the supplied gas hose, be sure that
the 1/2" to 3/4" gas line fitting is attached. Refer to the instructions
in the gas hose package. One gas line connection method is
shown in Figure 2-15; however, compliance with the applicable
standards and regulations is mandatory.
Inlet and regulated gas pressures can be measured using a
“U” tube manometer at the tap locations shown in Figures 2-15
and 2-16.
SECTION 2 - INSTALLATION
Figure 2-15 - Flexible Gas Hose Installation
To Gas
Supply
Pipe
90°
Elbow
Quick-
disconnect
device
Flexible
Gas Hose
Full-Flow
Gas
Shu toff
Valve
3/4" gas
pipe nipple
3/4"-1/2"
gas pipe
reducer
Individual gas
connection for
each oven
ca vi t y
1/2" gas
pipe nipple
1/2" gas line
tee with
pressure tap
CAUTION
DURING PRESSURE TESTING NOTE THE FOLLOWING:
ENGLISH
1. The oven and its individual shutoff valve must be disconnected from the gas supply piping system during any
pressure testing of that system at test pressure in excess
of 1/2 psi (3.45 kPa).
2. The oven must be isolated from the gas supply piping
system by closing its individual manual shutoff valve
during any pressure testing of the gas supply piping
system at test pressure equal to or less than 1/2 psi (3.45
kPa).
3. If incoming pressure is over 14" W.C. (35mbar), a
separate regulator MUST be installed in the line BEFORE
the individual shutoff valve for the oven.
WARNING:
lator during initial turn- on of gas, it is
open the manual shutoff valve
To prevent damage to the control valve regu-
very important to
very slowly.
After the initial gas turn-on, the manual shutoff valve must
remain open except during pressure testing as outlined
in the above steps or when necessary during service
maintenance.
A. Gas Utility Rough-In Recommendations
The following gas system specifications are STRONGLY
RECOMMENDED. Deviating from these recommendations
may affect the baking performance of the oven.
Gas Meter -
650 cfh (307l/min) meter
Gas Line
•DEDICATED LINE from the gas meter to the oven
•2" (50.8mm) pipe for natural gas
•1-1/2" (38.1mm) pipe for propane
•Maximum length: 200' (61m). Each 90° elbow equals 7'
(2.13m) of pipe.
B. Gas Conversion
Ovens are shipped from the factory configured for use with
natural gas. If permitted by local, national and international
codes, the oven may be converted to propane gas operation
using a Gas Conversion Kit that is supplied with the oven. Gas
orifice sizes supplied with the Kit match those shown in Tables
1-4 and 1-5 in the
Description section of this Manual.
Where permitted by local and national codes, it is possible to
convert ovens from natural to propane gas, or from propane to
natural gas, after the oven has been installed. Gas Conversion
Kits are available from Middleby Marshall for this purpose.
C. Connection
WARNING
Some procedures in this section may require conver-
sions, readjustments, or service on the oven's gas
system. Before performing these procedures, check that the
main gas supply valve and the circuit breaker/fused disconnect are in the OFF ("O") position. After completing these
procedures, perform a gas leak test before operating the
oven.
CAUTION
The terms of the oven's warranty require all start-ups, conversions and service work to be performed by a Middleby Marshall
Authorized Service Agent. The installation, start-up and changes
required when changing from one gas type to another can be
performed ONLY by a certified professional.
14
Loading...
+ 30 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.