Les foyers DON-BAR Fireplaces 9000, 9200, 9120, 9800, 9123 Installation, Operation And Maintenance Manual

Installation, Operation
and Maintenance Manual
LES FOYERS
DON-BAR
FIREPLACES
9000
9120
9200
9800
98009800
9123
REV. 2013-02
FREE-STANDING
FIREPLACES
Les foyers DON-BAR Fireplaces, inc.
Phone: (418) 686-9114 - Fax: (418) 686-9117
Website: www.don-bar.com - Email: don-bar@don-bar.com
KEEP THIS MANUAL IN A
SAFE PLACE FOR FUTURE USE
IMPORTANT
The installation shall meet the requirements of CAN/CSA B-365 - Installation code for solid-fuel-burning appliances and equipment.
Don-Bar fireplaces are not designed to be connected to air-ventilated factory-built chimneys (chimneys without insulation).
The ceiling support (standard or cathedral) is universal and used with all the fireplaces mentioned in this manual. The installation can be done in two practical steps:
1) The chimney and its ceiling support can be installed during the the construction phase; the fireplace is not required for this step.
2) Then, you can wait until the work is complete to select the fireplace model and proceed to final installation. This protects the fireplace from being damaged and there is no hassle of protecting the fireplace during construction.
If you are not sure maximum clearances from combustible materials (Pages 6 and 17 to 21)
For simplicity, the Model 9000 is the only type illustrated in the drawings. Installation of other models is similar.
A gas burner (propane or natural gas) with ceramic logs can also be installed. The burner and its accessories must be certified by the concerned authorities and meet the local codes and regulations where the fireplace will be installed.
CAUTION: The painted finish of the cathedral and regular ceiling supports must remain visible to the eye. Because of dangers of fire, these elements should not be covered with finishing materials other than those supplied and approved by Don-Bar.
which fireplace you'll be choosing, it's best to allow
THE 9000 SERIES FIREPLACES MEET THE REQUIREMENTS OF: ULC S627 - Space Heater for use with Solid Fuel, 2000 UL 1482 - Standard for Safety Solid-Fuel Type Room Heater, 2006 EPA - Certified EPA Exempt
REV. 2013-02
Page 2
LES FOYERS
DON-BAR
FIREPLACES
Installation, Operation,
and Maintenance Manual
The Manual is divided into 5 parts:
PART 1: Installation ...........................................
PART 2: Security, Operation and Maintenance...
PART 3: Parts List .............................................
PART 4: Chimney Fires.....................................
PART 5: Warranty ............................................
This document in its entirety is the intellectual property of Les Foyers Don-Bar inc.
Any unauthorized use will expose its author or authors to legal and financial penalties.
Copyright © 2011 - Les Foyers Don-Bar inc.
Page 5 Page 23 Page 27 Page 28 Page 29
REV. 2013-02
Page 3
PART 1: INSTALLATION Contents
1. Important Notice 9. Outside air intake installation
9.1 Important notice
2. Listed chimneys
3. Before beginning the installation
3.1 Choosing the best location
3.2 Chimney
3.3 Chimney minimum height
3.5 Outside air intake
3.5 Minimum clearances from combustible materials
4. Installation
4.1 Choosing the ceiling support
5. Regular ceiling support installation
5.1 Wood frame
5.2 Ceiling support fastening
5.3 Chimney
5.4 Radiation shield
9.2 Floor boring
9.3 Duct type and diameter
9.4 Exterior wall vapor barrier
9.5 Outside hood
9.6 Connecting the air intake duct to the fireplace pedestal
10. Floor protection installation
10.1 Protection of combustible floors
10.2 Removing the existing resilient flooring
10.3 Protection under the pedestal
11. Fireplace pedestal installation
11.1 Pedestal installation
11.2 Completing the pedestal installation
12. Glass firescreen
12.1 Standard firescreen 9000 and 9120
12.2 Pivot firescreen 9200, 9800, 9123, 9086 (Optional for 9000 and 9120)
6. Cathedral ceiling support installation (standard and ventilated)
6.1 Cathedral ceiling support wood frame
6.2 Ceiling support fastening
6.3 Outside air intake (ventilated support)
6.4 Chimney start
7. Factory-built chimney installation
7.1 UL listed parts
7.2 Manufacturer's instructions
7.3 Obstructions
7.4 Maximum authorized offsets
7.5 Chimney weight
7.6 Radiation shield/fire stop
7.7 Minimum chimney height above the roof
7.8 Flashing water tightness
7.9 Roof braces
7.10 Chimney top
8. Fireplace hood installation
8.1 Hood fastening
8.2 Joint gasket
13. Installation of the optional hood decorative panels (9000,9200,9800)
13.1 Installation of the decorative hood panels
13.2 Sub-panel fastening
13.3 Decorative panels installation
14. BBQ grill installation
14.1 BBQ supports installation
15. Gas burner (optional)
15.1 Gas burner installation
Regulations and certification
15.2
Neutral pressure required
15.3
CO detector
15.4
Connection of the outside air intake
15.5
REV. 2013-02
Page 4
PART 1: INSTALLATION
1. IMPORTANT NOTICE
WARNING: Any modification, change, or substitution of any fireplace component and/or not following the installation, operation, and maintenance instructions will void the warranty and can put your security at risk.
1.1 Before installation begins, carefully read the manual and contact your local building department to determine whether a building permit is required to install a fireplace.
1.2 The installation must follow the instructions in this manual and local building codes. If there is a conflict, you must follow the more restrictive measures.
1.3 For your security, enlist the services of a professional fireplace fitter for the installation.
1.4 Before lighting your first fire, read the instructions in Part 2 regarding Security, Operation and Maintenance.
Typical Installation
Round Top
Storm Collar
Attic Insulation
Factory-built insulated Chimney 10 inches I.D.
Roof Support
Flashing
Attic insulation Shield/Fire stop
Radiation/Dust Shield
1.5 Your fireplace produces heat and provides great ambiance but it should not be used as the main source of heating.
2. Listed chimneys
2.1 Listed factory-built chimneys: Your Don- Bar fireplace is designed to be installed with any prefabricated chimney bearing the ULC-S610 or UL-103HT label. The chimney inside diameter shall be 10" (250 mm). If the height of the insulated chimney above the ceiling support exceeds 18' (5500 mm), a chimney of 8" I.D. (200 mm) is acceptable.
REV. 2013-02
Page 5
Don-Bar Ceiling Support
Fireplace DON-BAR 9000
Floor Protection
DRAWING 1
Glass firescreen air wash system
3. Before beginning the installation
3.1 Choosing the best location: Before beginning the installation, make sure the spot you have in mind for the fireplace and the chimney meet the following requirements:
ceiling support requires 20-1/4” x 20-1/4” (515 mm) - see next page. Do not connect this
fireplace to a chimney that is connected to another heating device.
3.3 Chimney minimum height: 15 feet (4600 mm). This length is measured from the floor where the fireplace is installed to the top of the chimney.
Fireplace clearances from combustible walls (See also pages 17 to 21)
18" min. (460 mm)
Wall
Fireplace DON-BAR 9000
12" min. (305 mm)
Floor Protection
See pages 17 to 21
18" min. (460 mm)
3.4 Outside air intake: Outside air needs to circulate into the fireplace. The outside air intake duct needs to pass under the floor that supports the fireplace. Plan an appropriate path for this 6" to 8" (150 to 200 mm) outside diameter duct, including its insulated jacket.
Beam
Fireplace clearances from walls and combustible furniture (See also pages 17 to 21)
Furniture
DRAWING 2
3.2 Chimney: Position the chimney to avoid, as much as possible, offsets, elbows and the cutting­out of structural elements. Allow at least 2" (50 mm) for air space between the chimney and any combustible material including electrical cables, and plastic plumbing pipes. Never fill this air space with insulation. For example, if the chimney has an outside diameter of 12" (305 mm), by adding the required 2" (50 mm) air space, a 16" (406 mm) free continuous path is
required to install the chimney. Note: The standard ceiling support requires a free vertical space of 17” x 17” (430 mm) and the cathedral
REV. 2013-02
Page 6
Fireplace Table
Wall
12" min. (305 mm)
Wood Basket
Floor Protection
DRAWING 3
12" min. (305 mm)
See pages 18 to 23)
See pages 18 to 23
Vertical shaft of 17" x 17" required
Vertical shaft of 20-1/4” x 20-1/4" for the installation of the standard ceiling support
VERY IMPORTANT : A continuous vertical shaft of 17" x 17" (430 mm x 430 mm) minimum must be planned for the installation of the chimney and its ceiling support. This technical shaft must be free of joists, beams, trusses, pipes, electrical wires, etc. before the installation of the chimney. See article 7.4 for the maximum permitted offsets.
Chimney cap
Factory built insulated chimney
Storm collar Storm collar
Attic insulation
10" I.D.
Roof support Roof support
Flashing Flashing
Attic insulation shield / fire stop
required for the installation of the
cathedral ceiling support
VERY MPORTANT : A continuous vertical shaft of 20-1/4" x 20-1/4" (515 mm x 515 mm) minimum must be planned for the installation of the chimney and its ceiling support. This technical shaft must be free of joists, beams, trusses, pipes, electrical wires, etc. before the installation of the chimney. See article 7.4 for the maximum permitted offsets.
Chimney cap
Factory built insulated chimney 10" I.D.
Attic insulation
Wood frame for the regular ceiling support
Frame 17" x 17"
Standard ceiling support (universal)
Hood
Floor protection
Radiation dust shield
VERTICAL SHAFT 17" x 17"
L
on
g
h
b
ole
o
1
lt
8"
s
c
/c
Don-Bar ceiling support
"
20
x
"
20
(universal)
DON-BAR 9000 Fireplace (all models)
Glass firescreen with air wash system
Frame: 2x6, 2x8 or 2x10 x 1.5 in. minimum thickness
Don-Bar cathedral ceiling support
DON-BAR 9000 Fireplace (all models)
Floor protection
Wood frame for the cathedral ceiling support
Frame 20-1/4" x 20-1/4”
VERTICAL SHAFT 20-1/4" x 20-1/4”
Cathedral ceiling support
IMPORTANT: The frame must be made of solid wood, 1-1/2" (38 mm) minimum thickness. (2x6, 2X8 or 2X10 x 1.5in.)
Glass firescreen with air wash system
Hood
REV. 2013-02
Page 7
3.5 Minimum clearances from combustible materials: Make sure the wood basket (see
drawings 2 and 3) is at least 12" (305 mm) from any combustible material, including furniture, drapes and other flammable objects. Note that Type X fire-resistant gypsum board (Firecode) is considered combustible for fireplaces installations and as such requires the minimum 12" (305 mm) clearance.
3.6 Exterior doors and windows: As much as possible, avoid installing the fireplace too close to an outside door or window because air turbulence and drafts disrupt the chimney draft.
Wood frame for the regular ceiling support
43
(
7"
1
(4
1
7"
30
mm)
m)
m
0
L
ong b
at
o
lt h
18
(46
" c
o
0
les
mm
/c
)
4. Installation
4.1 Choosing the ceiling support: If you have a horizontal ceiling, use the regular Don-Bar ceiling support. For a sloped ceiling, use the Don-Bar cathedral ceiling support.
5. Regular ceiling support installation
5.1 Wood frame: Build a ceiling wood frame of 17" x 17" I.D. (432 mm x 432 mm) to anchor the ceiling support. The ceiling support long bolts are spaced at 18" c/c (457 mm). Level the frame so that the suspended hood will be plumb. Note
that these wood frame dimensions are required to fix the ceiling support. Elsewhere, the chimney may require smaller clearances. See the requirements of the chimney's manufacturer for more details.
Don-Bar regular ceiling support
g su
in
ceil
Fireplace hood to be bolted to the ceiling support
20"
8
0
(5
DRAWING 4
Chimney start on the regular ceiling support
17" (430 mm) required for long bolts
2" (50 mm) Minimum Mandatory Air Space
Factory-Built Chimney 10" I.D. (250 mm)
2" (50 mm) Minimum Mandatory Air Space
Radiation Shield
m
pport
2
x
m x 5
"
m)
0
m
8
0
5.2 Ceiling support fastening: Secure the regular Don-Bar ceiling support to the wood frame with 4 long bolts at least 3" (75 mm) long by 3/8" (10 mm) diameter.
5.3 Chimney: Start the chimney installation by slipping the first chimney section into the ceiling support. Be sure the chimney fits well into the ceiling support before proceeding with other chimney sections.
REV. 2013-02
Long Bolt
Fixing Bolt
DRAWING 5
Page 8
Don-Bar Regular Ceiling Support
Fireplace Hood to be bolted to the Ceiling Support
5.4 Radiation heat shield: Next, slip a radiation heat shield down the wood frame to protect the wood against radiant heat from the chimney.
6. Cathedral ceiling support installa­ tion (standard and ventilated)
fix the ceiling support. Elsewhere, the chimney may require smaller clearances. See the requirements of the chimney's manufacturer for more details.
Standard cathedral ceiling support
6.1 Cathedral ceiling support wood frame: Build a ceiling wood frame of 20-1/4" x 20-1/4" I.D. (515 x 515 mm) to anchor the Don-Bar cathedral ceiling support. Level the frame so that the suspended hood will be plumb. Note that
these wood frame dimensions are required to
Wood frame for the cathedral ceiling support
Build a 20-1/4" x 20-1/4" (515 x 515 mm) frame to anchor the Don-Bar Cathedral Ceiling Support
20-
(51
2
0
-1
(
51
/
4
5 m
"
m
)
"
4
/
)
1
mm
5
Don-Bar Cathedral Ceiling Support
Hidden part of the ceiling support
Visible part of the ceiling support
20-1/4" (515 mm)
Factory-Built Chimney 10" i. D. (250 mm)
3" (75 mm) Trim Collar
Rigid Insulation
The cathedral ceiling support must extend below
Bolt
the finished ceiling as indicated in the Table of DRAWING 6
Ventilated cathedral ceiling support
2" (50 mm) Mandatory Air Space
Long Bolt
Cathedral Ceiling Support
Insulation
Fireplace hood to be bolted to the support
This side of the cathedral ceiling support must extend below the finished ceiling as specified here
Minimum extension of the cathedral ceiling support below the finished ceiling according to the ceiling slope.
MUST EXTEND MUST EXTEND MUST EXTEND
PITCH PITCH PITCH
1/12 2/12 3/12 4/12 5/12 6/12
2" (50 mm) 2" (50 mm) 2" (50 mm) 2" (50 mm)
2.5" (65 mm) 3" (74 mm)
7/12 8/12
9/12 10/12 11/12 12/12
3.5" (90 mm) " (100 mm)
4
" (115 mm)
4.5 " (125 mm)
5
5.5" (140 mm)
6" (150 mm)
DRAWING 6
REV. 2013-02
Fireplace Hood to be bolted to the Cathedral Ceiling Support
14/12
7" (175 mm)
16/12
" (200 mm)
8
18/12
" (230 mm)
9
" (250 mm)
10
20/12
11" (280 mm)
22/12
12" (300 mm)
24/12
Outside air intake with damper 6" (150 mm)
Outside air supply
Damper key
DRAWING 7
Page 9