Lennox Elite CBX32M-024, Elite CBX32M-030, Elite CBX32M-018, Elite CBX32M-036, Elite CBX32M-042 Installation Instructions Manual

...
INSTALLATION
,B,2008 Lennox industries Inc,
Dallas, Texas, USA
X_ WARNING
_ CAUTION
IMPORTANT
INSTRUCTIONS
Elite® Series CBX32M Units
MULTI-POSITION AIR HANDLER 505,342M
05108 Supersedes 04/08
CBX32M Up-flow/Down-flow Unit Dimensions .... 2
CBX32M Horizontal LH/RH Unit Dimensions ...... 3
General Information ........................... 4
Shipping and Packing List ...................... 4
Requirements ................................. 4
Installing the Unit .............................. 4
Brazing Connections ........................... 4
Installing the Condensate Drain ................. 8
_puTeCh ical
n
blications
Litho U.S.A.
_, IMPORTANT
RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE
BLOWER MOTOR
SHIPPING BOLT
TOP CAP SHIPPING BRACKET (REPLACE
SCREWS IN TOP CAP AFTER REMOVAL)
C
Making Electrical Connections .................. 9
Sealing the Unit ............................... 12
Inspecting and Replacing Filters ................. 9
Adjusting the Blower Speed .................... 12
Repairing or Replacing Cabinet Insulation ......... 14
CHECK FOR AND REMOVE THE FOLLOWING ITEMS BEFORE OPERATING UNIT.
BLOWER HOUSING SUPPORT PAD
B
BLOWER MOTOR SHIPPING
BRACKET
D
HORIZONTAL DRAIN PAN (SEE UP-FLOW
APPLICATIONS ON PAGE 4 AND
DOWN-FLOWAPPLICATIONS ON PAGE 6)
iiiiiiiiiiiii_i':i-_
REFRIGERANT LINE PLUGS [SEE
BRAZING CONNECTIONS ON PAGE 7]
F
05/08
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
Page 1
E
505,342M
IIIIIIIIIIIIIIIIIIIIIIHIIIIIIIIIIIIIIIIIIIIIIII
CBX32M Model Dimensions (for Up-flow, Down-flow, LH and RH Horizontal Applications)
-018/-024 -030 -036 -042 -048/-060
Dimension inches mm inches mm inches mm inches mm inches mm
A 45-1/4 1149 49-1/4 1251 51 1295 52-1/2 1333 58-1/2 1486
B 16-1/4 413 21-1/4 540 21-1/4 540 21-1/4 540 21-1/4 540
C 20-5/8 524 20-5/8 524 22-5/8 575 22-5/8 575 24-5/8 625
D 14-3/4 375 19-3/4 502 19-3/4 502 19-3/4 502 19-3/4 502 E 19 483 19 483 21 533 21 533 23 584
F 15 381 20 508 20 508 20 508 20 508
G 24-5/8 625 24-5/8 625 26-3/8 670 27-7/8 708 27-7/8 708
H 20-5/8 524 24-5/8 625 24-5/8 625 24-5/8 625 30-5/8 778
3/4
(19)
SUPPLY
AIR OPENING _
(FOR UP-FLOW AND DOWN-FLOW POSITIONS)
ilU i iiiii!i¸! ! i!i ii i i i i i iii i ii iiiiiiii ii!iiii i !i!i ! ! !!i! i i iiiiiiiii iiiiiiiiiiiii 4_8/8(111,
iiiiiiiii_i_iiiiiiiii_ii_i!_iiiii_!i_!ii_!_!!i!i!!!_!!_i!iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii_!_i_I_i!_ii!i_i_i_!_i!i_i!_!iiii_!_!i_i_!_i_i!_i_i_ii_ii_!_!_i_i_ii_i_i_i_i_!_!i_!i_!i_i_i!!i!i_i_i!_i_ii_i_!_ii_ii_i!i_!iii_i__SUCT'°NL'NE
- 3/4 (19)
LINE VOLTAGE INLETS (TOP AND LEFT SIDE)
Top View 5/8
RETURN AIR RETURN AIR |
L oc ss
5/8 5/8 1 5/8
(15) Front View (15) (25) Side View (15)
F E "'"-_
LOW VOLTAG E INLETS (TOP AND RIGHT
SIDE)
(15)
OPTIONAL
ELECTRIC
(FIELD-
INSTALLED)
HEAT
Up-flow Position
i ililil .CONDENSATEiii !i DRA,NS(2,
PIPING PLATE DETAIL
1-3/4 (44)
SUCTION
LINE
LINE
OPTIONAL
ELECTRIC
INSTALLED)
LOW VOLTAGE
(RIGHT SIDE)
LINE VOLTAGE
(LEFT SIDE)
/
5/8(15)
(HORIZONTAL)
DRAINS (2) (UPFLOW AND
DOWNFLOW_
1 (25)
\
11-1/16
Side View (15) (15) Front View
_KIT NUMBER 83M57 (LB-909844A) REQUIRED TO CONVERT
5/8 5/8
Down-flow Position
UNIT TO DOWN-FLOW APPLICATIONS.)
t
FILTER
Top View ACCESS
A i,
H
A
V
505342M 05/08
Page 2
CONDENSATE
DRAINS (2)
(UPFLOW AND "_
DOWNFLOW)
CONDENSATE
DRAINS (2)
(HORIZONTAL)
PIPING PLATE
DETAIL
5-3/8 2 FILTER
5-3/4 -3/ 1-1/2
44 (38)
5/8
(16)I
(16) (25)
(5/8)j End View
Horizontal Position (Right-Hand Air Discharge)
C
LIQU{D _SUCTION OPTIONAL ELECTRIC
LINE LINE HEAT (FIELDqNSTALLED)
FOR DIMENSIONS "A" THROUGH
"H", SEE CHART ON PAGE 2.
Top View
(_68) 3/4
S,DE,
'N SlTOT 1,19
B D
LOWVOLTAGE:
INLETSBOTTOM_._1
AND RIGHT I_
FILTERACCESS Front View End View
PIPING PLATE t
DETAIL 1-1/8
SIDE) --(19)
4-3/8 t
(111)
(29) _-
3/4 AND LEFT SIDE)
(19) 11H 16
o,
lll°°°
(19)-
LINE VOLTAGE INLETS
(BOTTOM AND LEFT SIDE)
End View
LOW VOLTAGE
INLETS (TOP
OPTIONAL ELECTRIC FILTER SUCTION LIQUID HEAT (FIELD INSTALLED) LINE LINE
B
CONDENSATE DRAINS (2)
(HORIZONTAL) (44)-
Top View
Front View
.FILTER
ACCESS
lq/2
(38)
Horizontal Position (Left-Hand Air Discharge)
SUCTION i
LIQUID
LINE
1
(25)
End View
5/8
5/8
(16)
5/8
(18)
Page 3
CBX32M SERIES
,&,WARNING
The Lennox Elite* Series CBX32M air handler units are designed for installation with a matched remote outdoor
unit that is charged with HFC-410A refrigerant and optional
field-installed electric heat, The air handler units are for
indoor installation only. These instructions are intended as a general guide and do
not supersede local or national codes in any way. Consult authorities having jurisdiction before installation. Check
equipment for shipping damage; if found, immediately report damage to the last carrier.
Package 1 of 1 contains the following:
1--Assembled air handler unit
In addition to conforming to manufacturer's installation instructions and local municipal building codes, installation of Lennox air handler units (with or without optional electric
heat), shall conform with the following National Fire Protection Association (NFPA) standards:
NFPA No. 90A - Standard for Installation of Air Conditioning and Ventilation Systems
NFPA No. 90B - Standard for Installation d Residence Type Warm Air Heating and Air Conditioning Systems
This unit is approved for installation clearance to combustible material as stated on the unit rating plate,
Accessibility and service clearances must take
precedence over combustible material clearances.
CBX32M units are factory-configured for up-flow or horizontal right-hand discharge installation. For down-flow
or horizontal left-hand discharge, some field modification is required.
WARNING
IMPORTANT
DISASSEMBLE AND REASSEMBLE AIR HANDLER UNIT
The CBX32M air handler unit consists of two sections which are shipped assembled from the factory, If
necessary, the unit may be disassembled to facilitate setting the unit, Follow the steps below: To disassemble:
Step 1_ Remove access panels. Step 2.. Remove both blower and coil assemblies. This
will lighten the cabinet for lifting,
Step 3.. Remove one screw from the left and right posts
inside the unit. Remove one screw from each side on the back of the unit, Unit sections will
now separate,
To reassemble: Step 1.. Align cabinet sections together,
Step 2,, Reinstall screws, Step 3.. Replace blower and coil assemblies. Step 4,, Replace access panel.
UP-FLOW APPLICATION
Use the following procedures to configure the unit for
up-flow operations: Step 1.. Remove access panels. Remove corrugated
padding from the space between the blower and coil assemblies.
Step 2.. The horizontal drain pan must be removed when
the coil blower is installed in the up-flow position,
Removing horizontal drain pain will allow proper
airflow and increase efficiency.
Step 3.. Place unit in desired location. Make sure that
unit is level, Connect return and supply air plenums as required using sheet metal screws as illustrated in figure 1,
Step 4.. Install units which have no return air plenum on
a mounting stand that is at least 14" from the
505342M 05/08
Page 4
floorfor properair return.Lennoxoffersan Step2_
optionalup-flowunitstandaslistedintable1.
HORIZONTAL DRAIN PAN
r q I(MUST BE REMOVED)
I; II
UP-FLOW/ II
DRAIN PAN
DOWN-FLOW _J
Table 1. Optional Unit Side Stand (Up-Flow Only)
Model Kit Number
-21,-26, and -31 45K31
-41 through -65. 45K32
i i
Figure 1. Upflow Configuration
Step 3..
No further adjustment is necessary. Set unit so that it is sloped 1/4 inch toward the drain pan end of the unit as illustrate in figure 2 on page 5.
If the unit is to be suspended, it must be supported along the entire length of the cabinet as illustrated in figure 3. Ifa strap is used, attach
a piece of angle iron or sheet metal to the unit (either above or below) so that the full length of the cabinet is supported. Use securing screws which are no longer than 1/2 inch to avoid damaging the coil or filter, Connect the return and supply air plenums as required using sheet
metal screws.
CAUTION
HORIZONTAL DRIP SHIELD
V
HORIZONTAL I I I I
DRAIN PAN "_I__
DRA,NPAN
NO ADJUSTMENT IS NECESSARY
Figure 2. Right-Hand Discharge Configuration
ANGLE IRON OR
SHEET METAL
SCREWS
MAX.
1/2 IN. q
FRONT VIEW END VIEW
Figure 3. Suspending Horizontal Unit
HORIZONTAL RIGHT-HAND DISCHARGE
APPLICATION
Use the following procedures to configure the unit for horizontal right-hand discharge operations:
NOTE - For horizontal applications, an secondary drain
pan is recommended, Refer to local codes,
Step 1.. Remove access panels. Remove corrugated
padding from the space between the blower and coil assembly.
ELECTRICAL INLET
CLEARANCE 4 IN. (102 MM)
HORIZONTAL LEFT-HAND DISCHARGE
APPLICATION
Use the following procedures to configure the unit for horizontal left-hand discharge operations:
NOTE - For horizontal applications, an secondary drain
pan is recommended. Refer to local codes.
Remove access panels. Remove corrugated padding from the space between the blower and coil assembly before
operation. Step 1.. Remove coil assembly from unit and remove the
horizontal drain pan as illustrated in figure 4, detail A on page 6.
Step 2.. Remove drain plugs from back drain holes on
horizontal drain pan and reinstall them on front holes.
A IMPORTANT
Step 3..
Step 4..
Step 5..
Rotate the drain pan 180° front to back and install it on the opposite side of coil,
Remove screws from top cap. Remove horizontal drip shield screw located in the center of the back coil end seal as illustrated in figure 4, details B and C on page 6.
Rotate horizontal drip shield 180° front to back.
Page 5
CBX32M SERIES
Loading...
+ 9 hidden pages