![](/html/8a/8aca/8aca866de0a84e23293ef684b4c36a130267aff75c59bfa19324a60c4ac9eefb/bg1.png)
Assembly Instructions For General Hi-Low Bolts Beds
Thank you for purchasing this quality product. Be sure to check all packing material carefully for small parts that may have come
loose inside the carton during shipment.
Caution:(1) These parts are cumbersome and heavy. This product can best be assembled with the assistance of one or more
persons in order to prevent personal injury and to insure parts are not damaged during the assembly process. If dirty, clean finished
parts with mild dishwashing liquid and water solution ap p lie d on damp clo th. Cloth sho u ld not be excess ive l y w et. Polish fi n ish w ith
soft cloth and an industry recognized furniture polish.
(2) To prevent damage to your floor or carpet, please check the bottom of each piece of furniture for stain residue and
rough surfaces and also check for staples or nails left after removing the packag ing material. The manufacturer will n ot be held
responsible if preventative steps are not taken prior to installation.
(3) Unpack and dispose of all packing material but be careful not to throw away any assembly parts or hardware. Read the
instruction sheet and parts list carefully. Remove all staples and screws used for packa ging carefully using pliers and or screwdrivers
to prevent injury and scratching or damaging flooring.
Note: The bed should not be moved after it has been assembled without first disassemblin g the bedrails. Excessive movement
while the bedrails are locked into place may damage bedroom parts.
Assembly Procedures:
1. Select the bed rails and insert the BARREL NUTS (E) into the holes in each bed rail as shown. Make sure the slot on the top of
the BARREL NUTS (E) is aligned with the hole in the end of the rails. Once inserted, use a standard screwdriver to align the
BARREL NUTS (E). This will ensure proper alignment with the bolts later.
2. Attach side rails to bed ends as shown using the BOLTS (A) and the Hex Wr ench (D) that is provided. Rails can be placed in
upper or lower set of holes. Use the upper set if you are placing a trundle bed or storage drawer under the bed.
3. Cover unused holes in posts use BOLTS (B) and HOLE COVER (C) and tighten with the Hex Wrench (D) that is provided.
Insert the BARREL NUTS(E)
Align the BARREL NU TS (E)
Special Instruction: During normal everyda y use bolts, screws and nuts may loosen up. They should be periodically inspected
and re-tightened to prevent damage to the furniture or cause injury. Always check to be sure all hardware on this list is attached and
kept tightened.
Note: Install proper slats and mattress support or manufactures supplied slat roll to the rails before adding the mattress!