
Installation Instructions for
Round Monorail Chandelier
980MRLRCH-R
with Remote Transformer
Chandeliers
GENERAL PRODUCT INFORMATION:
This product is suitable for dry locations only.
CAUTION - RISK OF FIRE
This product requires installation by a qualified
electrician. Before installing be sure to read all
instructions and DISCONNECT POWERTO
THE ELECTRICAL BOX.
HS130_R
1.0
Mount the Canopy
1A
11
NOTE:The remote transformer must be
installed before installing the chandelier! Follow
the instructions provided with the transformer.
On the side of the canopy, remove the three Allen-head screws.
1
1B
DOME COVER
2
1
BACKPLATE
Lift the dome cover off of the backplate.

1C
1E
3
BACKPLATE
#8-32 SCREW
5
3
Feed the low-voltage transformer wires through the center of
4
the backplate.
Mount the backplate to the electrical box with the two #8-32
4
screws provided.
Use the universal round crossbar provided if the
backplate holes do not line up with the holes in
the electrical box.
Attach the low-voltage wires to each dome cover wire with
5
the wire nuts provided.
7
STUD
7
Slip the stud in the backplate through the hole in the dome
cover marked with a silver dot.
Reattach the three screws to the side of the backplate to
8
secure the dome cover in place.
8
SCREW
1D
6
6
6
AIRCRAFT
CABLE
Feed the aircraft cable through the small holes in the dome
6
cover from the inside of the cover.
2

Attach the Stem
Attach the Monorail Circle
2A
SEPARATOR
1
ROD
JOINING POST
1
For 120” stems: Slide the separator down the rods until it
rests on the joining posts.
2B
JOINING POST
ROD
SEPARATOR
ROD
2
SET SCREW
3A
STEM
SET SCREW
(BEHIND)
MONORAIL HUB
1
Push the Monorail hub completely onto the end of the stems.
Tighten the set screws on either side of the hub.These set
2
1
1
2
SET SCREW
screws must be very tight.
3B
AIRCRAFT CABLE
4
MONORAIL
2
For 120” stems:
Attach additional rods to the joining posts.
Insert each rod into a joining post and tighten the set screws
on the post.These set screws must be
very tight.
2C
1
3
Slide each stem into one of the power posts on the dome
cover.
SET SCREW
3
SET SCREW
EXCESS CABLE
3
Slip each cable grip under the Monorail.Tighten the set screw
CABLE GRIP
to hold it in place.
Feed each aircraft cable through a cable grip.
4
Once all cables are through a cable grip, pull on the excess
5
cable at each cable grip to put even, gentle tension on all the
cables.
Cut off any excess cable.
6
Refer to the instructions provided with the chandelier heads
7
to attach the heads to the Monorail.
Tighten both set screws in the power posts to secure the rods.
4
These set screws must be .very tight
3

SAVE THESE INSTRUCTIONS!
7400 Linder Ave, Skokie, IL 60077
800.323.3226 - 847.626.6300
www.lbllighting.com
© 2008 LBL Lighting.All rights reserved. The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.
4
A Generation Brands Company