LBL Lighting 2-Circuit MO Element Adapter User Manual

Installation Instructions for
980MR2FIXC
Two-Circuit Monorail Fusion Jack Adapter
2-Circuit Monorail
GP I :ENERAL RODUCT NFORMATION
This product is ETL listed and suitable only for indoor dry locations and approved for use at any height above the finished floor.
Install the Adapter onto the 2-Circuit Monorail for Down Light Fixtures
1A11A
CAP
2
1A6a1C
M3 SET SCREW
PENDADAPMONOFJ2_
1.5 MM ALLEN
6a
WRENCH
1.0
3
2-CIRCUIT MONORAIL
Unscrew the cap from the Fusion Jack adapter.
2
Select a place on the 2-Circuit Monorail where the fixture is going to be mounted.
3
From the bottom, place the Fusion Jack adapter onto the 2-Circuit Monorail.
4
Replace and tighten the cap to the Fusion Jack adapter.
Make sure that the cap is not cross threaded.
FUSION JACK ADAPTER
1A1B
FUSION JACK ADAPTER
5
FIXTURE FUSION JACK
CIRCUIT #1: COMBINATION OF THESE RAILS
To power up the fixture from circuit #1, tighten the M3 set screw on top of the cap with the 1.5MM Allen wrench. Make
sure that the set screw is tight for proper power
connection.
1D
6b
CIRCUIT #2: COMBINATION OF THESE RAILS
6b
To power up the fixture from circuit #2, remove the M3 set screw from top of the cap and screw it into the side of the Fusion Jack adapter hole with the 1.5MM Allen wrench. Make
sure that the set screw is tight for proper power
connection.
NOTE:Never use more than one set screw to select
a circuit on the Fusion Jack adapter.
M3 SET SCREW
1.5 MM ALLEN WRENCH
5
Push and screw the fixture Fusion Jack completely into the Fusion Jack adapter.
NOTE:Do not load either circuit over the maximum
system rating.
1
Install the Adapter onto the 2-Circuit Monorail for Up Light Fixtures
1A12A
2-CIRCUIT MONORAIL
3
2
Unscrew the cap from the Fusion Jack adapter.
2
Select a place on the 2-Circuit Monorail where the fixture is going to be mounted.
3
From the top place the Fusion Jack adapter onto the 2-Circuit Monorail.
4
Replace and tighten the cap to the Fusion Jack adapter. Make
sure that the cap is not cross threaded.
FUSION JACK ADAPTER
CAP
1A2B
1A2C
6
CIRCUIT #1: COMBINATION OF THESE RAILS
WARNING: Use only circuit #1 when installing the
fixture as an up light.There is 24V between the middle and top rail of the 2-Circuit Monorail.
6
To power up the fixture, tighten the M3 set screw on bottom of the cap with the 1.5MM Allen wrench. Make sure that the
set screw is tight for proper power connection.
M3 SET SCREW
1.5 MM ALLEN WRENCH
5
FUSION JACK ADAPTER
5
Push and screw the fixture Fusion Jack completely into the
FIXTURE FUSION JACK
Fusion Jack adapter.
SAVETHESE INSTRUCTIONS!
7400 Linder Ave, Skokie, IL 60077
800.323.3226 - 847.626.6300
www.lbllighting.com
© 2014 LBL Lighting.All rights reserved. The "LBL Lighting" graphic is a registered trademark of LBL Lighting. LBL Lighting reserves the right to change specifications for product improvements without notification.
2
A Generation Brands Company
A Generation Brands Company
Loading...