Installation Instructions for
980MR2CRAIL
Curved 2-Circuit Monorail
2-Circuit Monorail
GP I :ENERAL RODUCT NFORMATION
This product is a pre bent 2-Circuit Monorail. Avoid re-bending or
straightening the curve which may cause the rails to separate from
the insulator.
Pre Bent 2-Circuit Monorail with
Isolating Connectors
RAILCV_
Pre Bent 2-Circuit Monorail with
Conductive Connectors
1.0
1A
1A
2-CIRCUIT
MONORAIL
M3 SET SCREW
2
1.5 MM ALLEN
WRENCH
1
Push the two 2-Circuit Monorail sections completely onto the
isolating connectors.
2
Tighten the M3 set screws firmly with the 1.5 MM Allen
wrench provided.Avoid over tightening the set screws which
may strip the threaded.
ISOLATING
CONNECTORS
1B
1B
2-CIRCUIT
MONORAIL
M3 SET SCREW
CONDUCTIVE
4
1.5 MM ALLEN
WRENCH
3
Push the two 2-Circuit Monorail sections completely onto the
conductive connectors.
4
Tighten the M3 set screws firmly with the 1.5 MM Allen
wrench provided. Make sure that the set screw connections
are tight for proper connection and to avoid heat buildup.
CONNECTORS
1
SAVETHESE INSTRUCTIONS!
7400 Linder Ave, Skokie, IL 60077
800.323.3226 - 847.626.6300
www.lbllighting.com
© 2014 LBL Lighting.All rights reserved. The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.
2
A Generation Brands Company
A Generation Brands Company