LA STEELCRAFT FLP-20 User Manual

STEELCRAFT PRODUCTS
P.O. Box 90365 - Pasadena, CA 91103 PHN 626-798-7401 FAX 626-798-1482
ITEM QTY. PART NO DESCRIPTION
1 1 F 04FP04B 4-1/2" OD Sch 40 POST @ 24'
1
2 2 F 02FP000 SCREEN 3 8 P01FP000 BOLT/WASH/NUT (3/8" X 2-1/4")
MODEL
FLP-20
FOUL POLE
SHEET
1 OF 1
20'-0"
2
4 1 F 02FP001 CLIPS w/ BOLTS (3/8" X 1-3/4")
IN-GROUND INSTALLATION INSTRUCTIONS:
4
1. DI G FOOTING AT PROPER LOCATION 30" DIA. X 60" DEEP
2. PLACE POST (1) INTO FOOTING AND SUPPORT IN A PLUMB CONDITION WITH THE OUTSIDE EDGE OF PIPE TANGE NT TO THE OUTSIDE OF THE FOUL LI NE AND CLIPS TO WARDS THE PLAYING FIELD. TOP OF POST TO BE 20' -0" ABOVE FINIS HED GRADE.
3. POUR CONCRETE AND WAIT 37 HOURS.
4. INSTALL THE PANELS TO THE TOP POST (1) USING THE CLIPS (4) AND BOLTS (3) .
5. TIGH TEN ALL BOLTS AND SET SCRE WS.
8'-0"
FINISHED GRADE
ANTI-ROTATIONAL PLATES
4'-0"
30"DIA. X 60" DEEP CONC. FOOTING (SUPPLIED BY OTHERS)
NOTE: SPECIFICATIONS ARE SUBJECT TO CHANGE
DO NOT SCALE DRAWING
DATE: 6/23/09
AVAILABLE
SURFACE MOUNTED
16" X 16" X 1" STEEL PLATE
1" DIA. HOLES
FLP-20SM
SURFACE MOUNT DETAIL
DRAWN BY: AFS
Loading...