STEELCRAFT PRODUCTS
P.O. Box 90365 - Pasadena, CA 91109
PHN 626-798-7401 FAX 626-798-1482
DO NOT SCALE DRAWING
2-3/8" OD
RIBS
1" OD HORIZ.
BRACES
MODEL
AB-30P10
BASEBALL BACKSTOP
FRONT OPENING IS 30'-0"
AB30P10 ARCHED BASEBALL BACKSTOP
2-3/8" OD
FRONT BRACES
15'
2-7/8" OD
FRONT AND BASE
ARCHE S
1" OD HORIZ.
BRACES
2-3/8" OD
RIBS
10'-4-1/2"
36" DIA. X 48"
DEEP CONC.
FTGS. (TYP.)
NOTE: SPECIFICATIONS ARE SUBJECT TO CHANGE
DO NOT SCALE DRAWING
ELEVATION VIEW
DATE: 9/4/09
15'
DRAWN BY: AFS
STEELCRAFT PRODUCTS
P.O. Box 90365 - Pasadena, CA 91109
PHN 626-798-7401 FAX 626-798-1482
DO NOT SCALE DRAWING
SLEEVE FITTING
2 7/8" OD
FRONT ARCH
HORIZONTAL BRACE CONNECTION
MODEL
AB-30P10
EXTENSION DETAILS
2 3/8" OD
HORIZONTAL BRACE
SET SCREW
PARTS
ITEM QUANT DESCRIPTION
A 1 CENTER FRONT TOP S ECTION: 2-7/8" od G A LV P IPE X w/
INTERNAL FITTINGS ON EACH END AND 1 STUB FITTINGS
WELDED AT CENTER TO RECEIVE THE CENTE R VERTICAL
RIB.
B 2 LEFT AND RIGHT SIDE FRONT ARCH TOP SECTIONS MADE
OF 2-7/8" OD GALV. PIPE. BOTTOM END EXTENDS INTO
FOOTING
C 9 HO RIZONTAL STIFFENE RS (BRACE S): 2-3 /8" OD @ 4'-9 "
GALV. PIPE.
D 60 2-7/ 8" TENSION B A NDS W/ 5/ 16" X 1-1/4" CC B O LTS
E 22 5/ 8" X 1" SOCKET SET SCREWS
F 45 2" - 11 GA. X 10 ft. WIDE CHAIN LINK FABRIC
G 60 5/ 16" X 1-1/4" CC BOLT w/ LOCK NUT
H 14 10 ft . TENSION BA RS
INSTRUCTIONS
1. INSTALL FRONT ARCH S IMILAR TO FRONT ARCH OF THE BASE BACKSTOP. THE EXTENSION
ARCH IS TO B E 10’-4 ½” IN FRONT OF THE BASE BACKSTOP .
2. INSERT THE TOP FRONT BRACE IN THE STUB ON THE FRONT BASE ARCH AND THE
EXTENSION ARCH. TIG HTEN THE SET SCREWS.
3. THE EXTENSION BRACES ARE TO BE SPACED AT APPROXIMATELY 10’-6” C-C. PLACE A
BRACE B AND AT TH IS SPACIN G TO RE CEIVE THE EIGHT REMAINING FRONT BRACES.
4. PLACE THE SLIP FITTING IN EACH END OF THE FRONT BRACE AND ATTACH TO THE BRACE
BANDS USING HARD W ARE PROVIDED. ADJUST TO MAKE THE FRONT ARCH
PERPE NDI CU LAR AND TIG HTE N SET SC REWS .
5. PLACE TENSION BANDS AT APPROXIMATELY 10’-0” SPACING. PLACE THE CHAIN LINK
FABRIC ON THE TOP OF THE E XTE N S ION AND ATTACH TO THE TENSION B ARS/B ANDS.
NOTE: SPECIFICATIONS ARE SUBJECT TO CHANGE
DO NOT SCALE DRAWING
DATE: 9/4/09
DRAWN BY: AFS