STEELCRAFT PRODUCTS
P.O. Box 90365 - Pasadena, CA 91109
PHN 626-798-7401 FAX 626-798-1482
D
A
C
MODEL
810JH -4C
BASEBALL BACKSTOP
E
F
SHEET
1 OF 2
G
10'-0"
B
12" DIA. X 30" DEEP
CONC. FOOTINGS
ELEVATION VIEW
2'-0"
NOTE: SPECIFICATIONS ARE SUBJECT TO CHANGE
DO NOT SCALE DRAWING
DATE: 12/15/06
DRAWN BY: AFS
STEELCRAFT PRODUCTS
P.O. Box 90365 - Pasadena, CA 91109
PHN 626-798-7401 FAX 626-798-1482
8'-6"
8'-6"
6'
MODEL SHEET
810JH -4C
BASEBALL BACKSTOP
2 OF 2
20'-6"
12" DIA. X 30" DEEP
CONC. FOOTINGS (TYP. OF 4)
PLAN VIEW
(SUPPLIED BY OTHERS)
10'
ELEVATION VIEW
ASSEMBLY INSTRUCTIONS
1. Locate the footing holes at the site in the proper orientation. Dig the
four footing holes as show n above.
2. Place the four pos ts in the footing and support in a plumb and level
position at the proper spacing. You can use the prefabricated corne
sections to insure that the post spacing for the diagonals is correct.
Pour concrete into the footing holes and wait 37 hours before
proceeding.
3. Attach the two prefabricated corner sections and secure with the set
screws.
4. Attach the front rail into the corner sections and secure with set
screws.
5. Attach the six horizontal pipe braces with the rail end fittings and
brace bands.
6. Straighten framework and securely tighten all set screws usin g a
hammer and socket key.
7. Attach the 11 ga. fabric to the center hood section. Weave the two
tension bars into last loop on each side of the fabric and attach to
the pre-fab frames with tension bands. Use six on each side. Stretch
fabric tight.
8. Measure the distance on the vertical panels so you can cut the 9 ga.
fabric to the proper length. Unweave one strand of wire and then
insert a tension bar into the last loop of each end. Place the panel
between two posts with the tension bars adjacent to the post and
attach in the same manner as the hood section usin
Stretch fabric tight.
9. Assemble the remaining two panels in the same manner. Using the
tie wire (N), fasten fabric to the horizontal braces, skids, pre-fab
corners and bottom brace.
NOTE: SPECIFICATIONS ARE SUBJECT TO CHANGE
DO NOT SCALE DRAWING
DATE: 12/15/06
13'-2"
tension bands.
DRAWN BY: AFS