Ariana Victorian Dollhouse Instructions
NOTE 1: Please do a dry assembly using only tape to hold house together. This will get
you familiar with parts, location, and fit. This also gives you a chance to visualize how
you want to approach the build.
Materials for build;
1. Wood glue, you may use Titebond, elmers, tacky or any good wood glue. Tacky
wood glue dries clear.
2. Masking tape to hold house in place during assembly and gluing.
3. Utility knife if needed for trimming.
4. Super glue for small items to seat in place quickly.
Parts for Assembly
Base floor and rails
marked S1 thru S20
Porch stair assemblies
1 small / 2 large set
25 small Outer
window frames
25 small interior
window frames
8 large Outer
window frames
8 large interior
window frames
(14 )5.25”1stfloor post
(6) 5” 2ndfloor post.
1 bag of 11 porch rails and
13 upper porch running
trim
6 octagon
window frames
8 roof gazebo
extensions
3 roof and 1
dormer roof ridge
picket
2 sets of small
side awning
panels
One balcony roof
panel
4thfloor side
panel
One dormer set
16 triangle roof
panels (8sm)
(8 Lg)
32 Newel posts
Parts for Assembly
Continued
First floor
Second floor
Third floor
Fourth floor
Fifth floor
Walls 1A thru 1J
Walls 2A thru 2N
Walls 3A thru 3M
Walls 4A thru 4E
Walls 5A thru 5D
3 sets of assembled interior stairs
6 Main roof panels
Upper gazebo roof support
4 GABLES
16 gazebo roof
panel supports
8 large and 8 small
Two gazebo roof
panel support
joiners.
1Lg and 1small
5 Interior working
doors
Assembly
Step 2. Locate porch stair assembly tread and risers along with side supports.
Figure 3. Glue the large and small set riser and treads together as seen in
Figure 4. You should now have two sets of steps and one large and small riser.
Figure 5. On the lower base glue side stair rails into place as seen in Figure 6
and Figure 7.
Figure 1
Step 1. Assemble lower support base by installing rails S1 thru S20 onto base.
Match rail numbers to the base numbers. Figure 1.
If you are NOT doing a dry assembly and have painted parts glue parts to base
and install 1stFloor.
DO NOT GLUE 1stFLOOR TO BASE AS PORCH STAIRS REQUIRE ASSEMBLY. Apply
weight and allow to dry. Figure 2.
Once dry remove 1stfloor from base and proceed to step 2.
Figure 3 Figure 4 Figure 5 Figure 7Figure 6