Lang Manufacturing CLB-S Service Manual

Installation, Operation, Maintenance, & Troubleshooting
Model: CLB-S
Electric Marine & Cruise Line Broiler
Lang Manufacturing Company 6500 Merrill Creek Parkway Everett, WA 98203 Part Number: 60800 Phone: 425 -349-2400 Fax: 425-349-2733
WWW.LANGWORLD.COM © Copyright 1998
THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE. READ, UNDERSTAND AND FOLLOW THE INSTRUCTIONS AND WARNINGS CONTAINED IN THIS MANUAL.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE.
WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE, INJURY OR DEATH. READ THE INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT.
NOTICE:
VESSELS GREATER THAN 65 FEET IN LENGTH, IN ACCORDANCE WITH USCG REGULATIONS IN TITLE 46 CFR 110-113. ANY WIRING USED IN THE INSTALLATION OF THIS APPLAINCE MUST BE STRANDED COPPER.
THIS EQUIPMENT IS APPROVED FOR INSTALLATION ONLY ON
Model #: Purchased From:
Serial #: Location:
Date Purchased: Date Installed:
Purchase Order #: For Service, Call:
2

TABLE OF CONTENTS

CHAPTER PAGE
1. TABLE OF CONTENTS................................................................................3
2. READ FIRST..................................................................................................4
3. UNPACKING.................................................................................................6
4. INSTALLATION............................................................................................7
5. INITIAL START-UP......................................................................................8
6. OPERATION..................................................................................................8
7. CLEANING & MAINTENANCE PROCEDURES......................................9
8. TROUBLESHOOTING..................................................................................10
9. PARTS LISTS.................................................................................................11
10. WIRING DIAGRAMS....................................................................................12
11. WARRANTY..................................................................................................13
3
IMPORTANT READ FIRST IMPORTANT
CAUTION:
CAUTION:
CAUTION:
DANGER:
WARNING:
THE BROILER WEIGHS 350 LBS. (158.76 KILOGRAMS). FOR SAFE HANDLING, INSTALLER SHOULD OBTAIN HELP AS NEEDED, OR EMPLOY APPROPRIATE MATERIALS HANDLING EQUIPMENT (SUCH AS A FORKLIFT, DOLLY, OR PALLET JACK) TO REMOVE THE UNIT FROM THE SKID AND MOVE IT TO THE PLACE OF INSTALLATION.
ANY STAND, COUNTER OR OTHER DEVICE ON WHICH BROILER WILL BE LOCATED MUST BE DESIGNED TO SUPPORT THE WEIGHT OF THE BROILER (350 LBS.).
SHIPPING STRAPS ARE UNDER TENSION AND CAN SNAP BACK WHEN CUT.
THIS APPLIANCE MUST BE GROUNDED AT THE TERMINAL PROVIDED. FAILURE TO GROUND THE APPLIANCE COULD RESULT IN ELECTROCUTION AND DEATH.
INSTALLATION OF THE UNIT MUST BE DONE BY PERSONNEL QUALIFIED TO WORK WITH ELECTRICITY. IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL AND/OR DAMAGE TO EQUIPMENT. UNIT MUST BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES.
NOTICE:
NOTICE:
CAUTION:
CAUTION:
The data plate is located behind the access cover to the right of the unit. The broiler voltage, wattage, serial number, wire size, and clearance specifications are on the data plate. This information should be carefully read and understood before proceeding with the installation.
The installation of any components such as a vent hood, grease extractors, fire extinguisher systems, must conform to their applicable National, State and locally recognized installation standards.
ALWAYS KEEP THE AREA NEAR THE APPLIANCE FREE FROM COMBUSTIBLE MATERIALS.
KEEP FLOOR IN FRONT OF EQUIPMENT CLEAN AND DRY. IF SPILLS OCCUR, CLEAN IMMEDIATELY, TO AVOID THE DANGER OF SLIPS OR FALLS.
4
Loading...
+ 9 hidden pages