Lang Manufacturing 36S-HS Installation Manual

36S-HS HIGH SHELF
INSTALLATION INSTRUCTIONS
NON - PRE-DRILLED RANGES
If the range that the Hi Shelf is to be installed on has been pre-drilled by the factory
Pre-drilled Ranges
If the range has not been pr e- dr illed, continue with this section
Place the High Shelf on top of t he r ange so that the back of the range is flush with the back of the High Shelf.
Mark the five holes in through the flange in the High Shelf onto the top of the rang e.
Mark the six holes through the sides of the High Shelf onto the side of the range.
,
.
Remove the High Shelf fr om t he range. Drill all eleven holes using a # 27 drill bit. Place the High Shelf back on top of the range and install
all sheet metal screws.
PRE-DRILLED RANGES
Place the High Shelf on top of t he range so that the holes in the High Shelf line up with the holes in the range and the backs are flush.
Install five 10-24 x 1/2 Truss Head Machine Screws through the holes in the back flange of the High Shelf int o t he top of the range.
Install three 10 x 1/2 Sheet Metal Screws through side of the range.
each
side of the High Shelf int o the
Lang Manufacturing Company 6500 Merrill Creek Parkway Everett, WA 98203 Phone: 425-349-2400 Fax: 425-349-2483
Loading...