1.
Important information 5
1.1 Symbols 5
1.2 General 6
1.3 Safety warnings and instructions 6
1.4 Obligations of the manufacturer 9
1.5 Obligations of the installer during installation 9
1.6 Obligations of the authorised contractor for commissioning at first commission. 9
1.7 Obligations of the user 9
1.8 Factory testing 10
2.
Transport and installation of the device 11
2.1 Transport 11
2.2 Installation of the device 11
2.3 Storing and warehousing of the device 11
2.4 Delivery package 11
2.5 Package and worn-out device management 12
3.
Installation of the device 13
3.1 General 13
Minimal clearance from the device 15
Levelling of the device 15
Removal of the lid. 16
Set up and connection of the external sensor. 17
3.2 Heating system of machine installations 17
The scheme of the heating system 18
Preparing the heating hydraulic system - secondary 20
Charging of the heating system 22
Heat source - primary 24
Underground water - primary 24
3.3 Electrical connection 25
Description of elements in the electrical cabinet 26
Schematic display of the control system - TT3000 27
Connection of the internal control unit – TT3000 28
Electrical connection of the power cable 30
3.4 Basic input-output module MD1 - WPG 33
Connection of the elements to the internal control unit TT3000 34
Main circulation pump connection 36
Connecting heating cycle 2 (direct cycle - optional) 37
Connection of heating cycle 2 (optional) 37
DHW connection (optional) 40
Connection of the device’s remote on/off (optional) 41
External switch of heating/cooling (optional) 41
Connecting the cooling valve (optional) 42
Connecting the relay of the additional source DOVOG- gas/oil DHW (optional) 42
3.5 Connection of the room temperature corrector KT-1 and KT-2 43
4.
Commissioning of the device 44
5.
Maintenance 44