Congratulations on your purchase of our instant shelter. This unit is a combination of
excellent manufacturing and design. It is comprised of a rigid frame and a durable cover. For easy assembly, we have marked all the parts with codes. With proper installation, use and maintenance, your unit will provide many years of good and suitable service.
READ ALL THE INSTRUCTIONS BEFORE ASSEMBLY
1. The proper erection and installation of this building requires a high level of care and safety.
We recommend the safety regulations be complied with during the installation. It includes but is not limited to:
- Safety hats, protective eyewear and protective clothing
- Safety harnesses for all elevated workers
- Proper ladder, cage, and safety operation
2. Site selection: Choose a solid level location for your building. Do not install the building
where the ground could not keep the building steady. Do not install the building where the ground could not bear the weight of the building. Do not install the building in soft grass ground or wetland.
3. Be cautious with the surroundings. Keep work area clean. Do not set up it near snow drifts, in
slippery places, or in wet location. The cover of the building will protect against normal falling leaves and light debris, however, large, fast or sharp falling items etc. may cause a puncture or tear in the cover material. So, keep the building away from such harmful things. Be careful with power and heat sources. Dont keep heat sources near the tarpaulin. Don’t expose to open flame.
4. Chose a windless day to install the building. It is very difficult to attach the cover in heavy
wind.
5. All snow accumulation on the main cover should be removed as soon as possible. Otherwise,
when old snow on the roof becomes hard with new snow falling in, it will increase the burden of the roof badly and will damage the roof.
6. Try to keep the building, especially its base, in a dry condition. This will help the building to
have a longer life than keeping it in a wet conditions.
7. The user should be responsible for the parts missing or damage occurred during the
installation.
8. Dont make alteration of the frame. Dont hang anything besides included parts to the frame.
Damages, consequential damages, or injuries caused by improper installation, alteration, improper use, or damages caused by snow, wind, or any acts of nature are owing to the user. The building is not intended for occupancy for any length of time.
ASSEMBLY PROCEDURE
1. Prepare location and place all unit boxes near location sight. Perform an inventory check
before beginning, to be certain all components are available for installation.
2. Assemble every group of arch including base plates and lay them on the ground.
3. Erect the front arch and secure by stake pegs.
4. Erect the 2nd arch and connect the two arches by roof purlins.
5. Finish the rest of arches in the same way
6. Install main cover over frame.
7. Install end covers over end panels.
Read all the detailed instructions and notices in the following assembly instructions!
MAINTENANCE AND CARE
1. If some parts or the cover were accidently damaged during the use, contact the local supplier
for advises on the repairing method or replacements, so that to prevent from further damage and keep the building in a good condition.
2. When replacing the parts, make certain the whole frame and the parts connected to the
replaced parts be well fixed or supported.
3. Same with when attaching the cover, choose a windless day to replace the cover. Begin with
making certain all the bolts of the frame and the tensioning equipments be well fixed. When taking off the cover, make sure the related ropes, etc. be taken off, and the cover will not be blocked during the way. Avoid taking off the cover with heavy big power equipments.
4. For the building with mechanical door. Keep the door closed if it is not used for long time.
This helps the mechanical door to have a longer life.
5. To enlongate the life of the cover, put small duct tape or foam rubber (provide it by yourself)
on the frame that comes to in contact with cover. The tape and foam rubber acts as a cushion to avoid rubbing damage to the cover over years.
6. Periodically(once in half a year or more often), the building should be completely inspected
and maintained internally and externally to make certain the building remains properly installed and secured. Including: check all bolts and hardware connectors to be certain they are in place and tightened, the base plates are still fixed firmly, check and adjust the ropes if in need, clean the cover with suitable washing. Allowing dirt and debris to sit on cover over an extended time will damage cover irreparably.
Thanks again for choosing this quality product. The following is the detailed assembly instructions for you starting the assembly.
Part List of Model#Thij-515
Part Code Description Quantity
1 Curved roof tube 7
2 Curved side roof tube 10 2A Curved side roof tube in front panel 2 2B Curved side roof tube in back panel 2
4 Sidewall Tubes 10 4A Sidewall Tubes at right of front panel 1 4B Sidewall Tubes at left of front panel 1 4C Sidewall Tubes at back panel 2
5 Horizontal wall and roof purlin 30
6 Base flange of four corners 4
8 Base flange of sidewall tube 10
9 Front panel bean(2pcs. One set) 1set
10R Door frame and track 1 10L Door frame and track 1 11R Door frame and track 1 11L Door frame and track 1
12 Base flange of door frame 2 13 Upper cross tube of back panel(2 pcs.one set) 1set 14 Lower standing tube in the back panel 2 15 Upper standing tube in the back panel 2 16 Base flanges of standing tubes in the back panel 2 17 Side lower cross tube of back panel 2
17A Middle lower cross tube of back panel 1
18 Beam beside door frame 2
18A Beam for the winch of the door 1
19 M10x30 bolt 16
19A M10x16 bolt for tie down ratchet 28
20 Wind Brace Support 4
20A Tube clip for wind brace support 8
21 Roof cover 1 22 Lower roof cover tensioning tube 2sets 23 Tie down ratchet for tensioning roof cover 14 24 Nylon bands for tensioning roof cover 14 25 Back cover 1 27 Two-sided cover beside door 2 28 Top flaps for above door 1 29 Tensioning tube(in the bottom) for back cover 3
30 Tensioning tube(in the bottom) for front cover 2 31 M10x75 bolt for door track connection 8
31A M10x60 bolt for front panel connection 16
32 M10x100 bolt for rear panel standing leg connection 4 33 Door cover 1 34 Door dropping tube 6
34A Bottom door dropping tube 1
35 Double pulley and frame 1 36 Single pulley and frame 1 37 Winch 1 38 Winch handle 1 39 Steel wire rope 2 40 Fastening rope for front&rear cover and the two ends of roof cover 180M 42 Stake peg 50 45 M10x90 bolt for "tapered" connection 104
45A M10x110 carriage bolt for horizontal tube 40
45B
46 Plastic cap of tensioning tube of roof cover 14
M5x10 Self-tapping screws for securing the door cover to the dropping tube
28