Kraftware Corporation DS-32M2, DS-16M2 User Manual

EMC Departmental Switches
DS-16M2 and DS-32M2
Installation Guide
P/N 014003063
REV A02
August 1, 2002
This document explains the power, cooling, weight, and rack placement requirements for the EMC departmental switches listed below. It also describes the kits available for mounting them in EMC and non-EMC racks and includes installation instructions as well.
Device Device Model Mounting Kit Model
16-Port Departmental Switch (2Gb) DS-16M2-0D DS16M-CRKH/CRKL
32-Port Departmental Switch (2Gb) DS-32M2-0D DS32M-CRKH/CRKL
Major sections are
• Device Power, Cooling, and Weight Information................................. 2
• Device Dimensions.................................................................................... 2
• Switch Mounting Kit (DS-16M or DS-32M)........................................... 3
• Installing the DS-16M and DS-32M Rails............................................... 5
• Installing the DS-16M2 and DS-32M2 Switches.................................. 17
1

Device Power, Cooling, and Weight Information

Device Power, Cooling, and Weight Information
Device Power Requirements
DS-16M2 switch Voltage: 100 to 230 V ac, 47 to 63 Hz
5 amperes max 2 ac power cords per unit
DS-32M2 switch Voltage: 100 to 230 V ac, 47 to 63 Hz
5 amperes max 2 ac power cords per unit

Device Dimensions

Device Height Depth Width
DS-16M2 Switch 1.0 U 1.7 in 4.3 cm 25 in 63.5 cm 17.5 in 44.5 cm
DS-32M2 Switch 1.5 U 2.55 in 6.47 cm 25.1 in 63.75 cm 17.5 in 44.5 cm

Device Placement Requirements

The DS-16M2 switches must be located at the top of the rack/cabinet, because the power cord routing for these switches runs across the top of the uppermost switch. There are no restrictions on the location of the DS-32M2 switches in the rack/cabinet.
Cooling Requirements (Heat Dissipation) Maximum Weight
410 BTU/hr 11.8 kg (26 lb)
836 BTU/hr 15.4 kg (34 lb)
Power distribution must support the number of outlets required for the switch and the switch power rating listed in the table on page 2.
2
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide

Switch Mounting Kit (DS-16M or DS-32M)

The DS16- and DS32-CRKH kits contain the16- or 32-port standard switch rail mounting kits, and the DS16- and DS32-CRKL kits contain the 16- or 32-port low protrusion rail mounting kits.
Component Use
2 mounting brackets - see illustration on page 17. 2 per switch
Switch Mounting Kit (DS-16M or DS-32M)
2 short rail assemblies (20.5 inches to 27 inches)- see illustration on page 6 or page 12 or 2 long rail assemblies (27 inches to 34 inches)- see illustration on page 6 or page 12
#10 flat washer M5 kep nut
6-32 x .31 screws 5 thread-forming screws per bracket to
M5 x 12 mm screws 4 per rail for DS-16M in round-hole
2 per switch
2 per rail assembly to secure adjustable rail to the “C” channel.
secure bracket to switch (10)
or
5 non thread-forming screws per bracket to secure the bracket to the switch (10)
Note: The kits include two (2) bags of 6-32 x .31 screws. Be sure to check the labeling on the bags and the chassis number label located on the back and bottom of the chassis to ensure that you use the correct screws for your chassis.
channels (8) 3 per rail for DS-32M in round-hole
channels (6)
Square-hole washer M5 x 16 mm screws
M3 x 8 mm screws 1 per bracket, used to secure brackets
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
4 per rail for DS-16M in square-hole channels (8)
3 per rail for DS-32M in square-hole channels (6)
to the rails (2)
3
Switch Mounting Kit (DS-16M or DS-32M)
Component Use
1U or 2U, low-profile or standard-profile bezel (front rack panel) 1 per switch
Two 7-foot USA power cords, straight C13 to N5-15P straight Two 6-foot IEC power cords, straight C13 to C14 straight

Tools Required for Installation

You will need to have the following tools available to complete the installation of the rails and switch(es).
# 1 Phillips head screwdriver
1/4-in. nut driver
5/16-in. nut driver
#10 washers ball studs
1 washer and 1 ball stud per rail to hold bezel (2)
39U bezel only
Latch brackets and keyplate spacers 2 each to secure 1U bezel for 16M
switch in 40U cabinets
Left and right latch brackets 1 left and 1 right to secure 2U bezel for
32M switch in 40U cabinet
2 per switch (use the ones appropriate for your PDU)
4
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide

Installing the DS-16M and DS-32M Rails

This section describes the installation procedures for the DS-16M and DS-32M rails. The figures below show a front and rear view of four sets of rails installed in a 39U rack. Note that the rack is shown without the side skins.
Front View
Installing the DS-16M and DS-32M Rails
Rear View
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
5
Installing the DS-16M and DS-32M Rails

DS-16M Rails Installation

There are two different length rails: The short rails range between
20.5 inches to 27 inches. The long rails range from 27 inches to 34 inches. Each kit contains two different length rear rail mounts. Use the rail length that is appropriate for your rack/cabinet.
Front
DS-16M Short Rails (for the CLARiiON Rack/Cabinet)
Front
DS-16M Long Rails (for 3rd Party Racks/Cabinets)
Rear
Rear
The front and rear flanges of the DS-16M rails have three screw holes. See the figure below.
DS-16M Front Flange
DS-16M Rear (u-shaped) Flange
If you are installing both a DS-16M2 and DS-32M2 switch, the DS-16M2 should be positioned at the top of the rack/cabinet, located above the DS-32M2 switch.
Select the appropriate length rails, and follow the steps below to install them.
6
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
Installing the DS-16M and DS-32M Rails
1. Assemble the rails. The rails assembly consists of an adjustable rail, a C channel, and
two washers and kep nuts. See the figure below.
C channel
Adjustable rail
a. Insert the threaded posts on the C channel into the slot on the
adjustable rail.
b. Secure the adjustable rail to the C channel with two #10 flat
washers and M5 kep nuts. Leave the nuts finger tight.
Attach washers\nuts to threaded posts
2. Determine where in the rack/cabinet you are going to locate the
switch.
The left/right orientation of the rails is determined by the location of the word “top” on the C channel. The rail is oriented correctly when this word “top” is up and toward the rack/cabinet front. See the next figure.
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
7
Loading...
+ 15 hidden pages