KP Electronic Systems KPMTPIT User Manual

MTPIT Installation Manual

1. General Description:

The MTPIT is for PIT installation. Before installation check if you have all the MTPIT parts:
1. The mushroom shape plastic. Check that the unit is not damaged e.g. there
are no scratches or Cracks.
2. Metal washer.
4. Cable with NICOR connector. Check the connector pins are straight.
5. Check if there is enough space for the unit beneath the PIT cover.

2. Unit installation

1. Remove and separate the metal washer and the Nut
from the mushroom.
2. Insert the mushroom through the cover hole, first the
cable.
3. Screw the Nut with the metal washer above. Tied the
Nut not too much – just be sure that mushroom is tied to the pit cover.
4. Place the cover on the pit carefully and verify that
nothing touches it.
5. Remove the pit cover and place it on the upper cover
side so the mushroom i.e. ups down.
6. Connect the cable with the meter cable. Make sure
that the two connector ration before pushing one in the other.
7. Place the lid back and cover the pit.

3. PDA using

The MTPIT is sealed without any visual indication e.g. LED. The unit functionality should be inspected before leaving the pit site. The MTPIT is in a very low energy. To wake up the unit for testing a magnet should be approach the upper side on the unit from the outside. The MTPIT wakes for shot time waiting from a wireless prompt from the PDA.

4. PDA setting.

Com Port - To choose the right RSINT05 port.
HH ID - To choose the PDA ID (Paring communication).
Set Field Verification 1 Frequency - To choose the first repeaters frequency.
Set Field Verification 2 Frequency - To choose the second repeaters frequency.
Set Read Meter Frequency - To choose the meter frequency.
Use Sound – Turn on/off sound on received message.
Field Verification (Receive messages from repeaters):
Loading...
+ 6 hidden pages