![](/html/00/008a/008a0df94e7a6c83d061f682a5e187409d353dc08f1d9b0cfbfc2973fe4f2297/bg3.png)
Dear Users,
Thanks for purchasing our products.In order to use these products safety
and effectively, please read this manual carefully before use.
We reserve the right to improve our products.
This is a currenty manual,with standard as
Content
01
02
02
03
04
05
06~10
11~14
15~18
19
19
20
20
21
Content
Preparation
Part list
Circuit drawing
Waterway drawing
Water&electricity install drawing
Parts drawing
Installation drawing
Operation instruction
Warning
Usage Notice
Reminder
Maintainance
Trouble Shooting
Aftersales service
CONTENT
01
![](/html/00/008a/008a0df94e7a6c83d061f682a5e187409d353dc08f1d9b0cfbfc2973fe4f2297/bg4.png)
17# Spanner Spirit level
3m
Tape Measure
4/2.5mm
Hexagon Wrench
Tool
Screwdriver
Suggest using power screwdriver
Technology parameters
Rated Voltage:AC230V
Rated Power:3020W
Rated Current:13.2A
Rated frequency :50~60HZ
Insulated Resistance:>20MΩ
Waterproof grade:IPX4
Safety grade:I
Load parameter
Up heater :AC230V/ 200W
Down heater :AC230V/ 250W
Fan:DC12V/5W
Color Light:DC12V/5W
Speaker:8Ω/10W
1.Check the Qty of components according to packinglist or parts list.
2.Check the Qty of materials according to parts list.
3.Check if there is damage on the surface of product components or not.
4.A grounded outlet needed as recommend to use at least 16A with a fuse
of the leakage protection switch.
5.A professional personnel or electricians is needed when installing
electrical components.
If can not satisfy above conditions, please stop installing immediately and
contact the dealer.
Preparation Parameter
02
![](/html/00/008a/008a0df94e7a6c83d061f682a5e187409d353dc08f1d9b0cfbfc2973fe4f2297/bg6.png)
Attention :
With seal ring at every connect part
Water inlet valves
Drain valves
Top shower
Steam
generator
Steam outlet
Connect drainer
Handle shower
Shower spout head
Cold water
Hot water
Waterway drawing
04
![](/html/00/008a/008a0df94e7a6c83d061f682a5e187409d353dc08f1d9b0cfbfc2973fe4f2297/bg7.png)
Area for drain mouth
Inside shadow round part
Power socket
200
20
0
≈800
≈ 0012
Hotwater switch
Coldwater switch
Creepage
protect switch
Cabin placement
Hot water:G1/2 galvanize zinc pipe,height 800mm;
Cold water :G1/2 galvanize zinc pipe,height :800mm;
Power:230V/50Hz single phase three line system,above 16A load
capability,1200mm high from earth;
Sinkhole:The diameter of the sinkhole underground should be Φ60 。
Attention:
1.When turn on the steam,please be sure that there`s enough cold water,
otherwise,the steam generator will be damaged;
2.Power and water resource should be controled by divide switch,switch must
be placed in the convenient place;
3.After enjoying your shower,the power and water resource must be turn off。
Water&electricty install drawing
05