www.kontron.com
A dedicated 2 reserved pins connector was provided for trigger switch in KSSDP-VA:
Pin A : Trigger Pin, 3.3V input, internal resistor pull-up, output was protected by series
resistor. Pin A and Pin B are combined as a normal open type switch for purge trigger;
Pin D : GND
Pin 39 : Indicator Pin for operating status,3.3V LVCMOS output for LED driving.
Operating Guide
The Purge function was triggered by closing and holding Pin A and Pin D switch for
a given time. And LED between Pin 39 and Pin D(or GND)can show operating status –
ready, operating and completion.
(1)Purge Ready, after SSD power on, the indictor LED is ON;
(2)Pre-Trigger, closing and holding the trigger switch, SSD will go to pre-trigger
status, LED will flicker at 1Hz; if user releasing the switch in pre-trigger stage, the SSD will
go back to (1); SSD will be triggered to Data Clear mode by holding the switch for 2 seconds
;and SSD will be triggered to Sanitization mode by holding the switch for 4 seconds or
more.;
(3)User Data Erase, as soon as the commands were triggered, SSD will cut off the
signals transfer between Host and SSD, stop receiving new ATA commands, and force to
interrupt on-going ATA commands; and then SSD will execute block-by-block erase until all
blocks in user data area were erased, then go ( 4 ), if sudden power fail, jump to ( 3a )
(4)Purge Mode Judgment, Data Clear mode, go(5); Data Sanitization mode,go
(6);
(5)Erase reserved block,logical to physical mapping table, Firmware. If sudden
power failed then go(5a);After all erase operations, go(7);
(6)Overwrite / fill erased user data area by “1”,LED will flick,and one LED on/ff
cycle means 1GB data area have been overwritten/filled. If sudden power fail then go(6a);
After overwrite / filling, go(7);
(7)Data Purge complete,LED will be ON;SSD is set back to factory default in off-
line, 10 seconds power-off should be conducted before restart the Host system and put SSD
in use.
(3a)LED ON; until internal backup power used up. Power On again,jump to (3b);
(3b)Auto resume and ready to continue. If sudden power fail again; if SSD is ready
then jump to (3); if the SSD is not ready, then jump to (3a);
(5a)LED ON;until internal backup power used up. Power On again,jump to (5b)
Pin Definition - PATA