Kold-Draft GB1258W Installation Manual

Installation & Operation Instructions
KOLD-DRAFT
CLASSIC
GB125
W
KOLD-DRAFT
Ice Machine Products
®
®
1525 East Lake Road, Erie, PA 16511-1088 814/453-6761 FAX 814/455-6336
©2004 KDIndustries, Inc., Erie, PA U.S.A. Printed in U.S.A. 3/04 508 1069 01
A Tradition of Excellence In Ice Equipment.
INSTALLATION AND OPERATION INSTRUCTIONS
FOR
KOLD-DRAFT
CLASSIC
GB125
8W
SERIES ICE
CUBERS
®
CHECK FOR FREIGHT DAMAGE BEFORE PROCEEDING: Even though damage to the carton may not have been evident, check for hidden damage and contact freight carrier immediately if necessary to file a claim.
THIS EQUIPMENT MUST BE INSTALLED IN COMPLIANCE WITH THE APPLICABLE FEDERAL, STATE/PROVINCE, AND/OR LOCAL PLUMBING, ELECTRICAL, AND HEALTH/SANITATION CODES AND REQUIREMENTS.
CAUTION:
RISK OF PERSONAL INJURY, PROPERTY DAMAGE, EQUIPMENT FAILURE, OR FIRE. Refer all maintenance to qualified personnel. Never operate this equipment with covers, panels, or other parts removed or not properly secured. Warn all users to clean up spillage immediately, keep storage bin doors closed, and report any apparent leakage or unusual sounds to responsible maintenance personnel.
INSTALLATION
NOTE: For Multiplex installations, please refer to Multiplex specific instructions before
proceeding.
®
1. Position the ice storage bin so that the following minimum clearances will be available around the ice maker for ventilation and utility connections:
REAR: “W” & “R”, 6 inches; “A”, 10 inches from left of rear cabinet panel TOP and LEFT SIDE: 6 inches RIGHT SIDE: 8 inches
508 1069 01 New 5/19/03
- 2 -
2. Level the bin with adjusters on legs, or by shimming if the bin is to be sealed to the floor. If gaps due to shims are greater than 1/8 inch, install a cove molding around the bin bottom. Seal the bin or molding to the floor with NSF Certified RTV sealant (Dow-Corning RTV 732 or equal).
3. Remove the cuber cabinet TOP panel as follows: Lift from the front and pull forward until the rear clip is disengaged from the chassis.
4. CAREFULLY lift the cuber out of the carton and onto the floor.
CAUTION:
RISK OF PERSONAL INJURY OR EQUIPMENT DAMAGE. Use a suitable lifting means and be careful of sharp edges.
5. Remove the remaining cuber cabinet panels as follows: FRONT: Remove the (4) screws at the bottom and front-sides, pull forward. SIDES : Pull forward and lift to disengage the clips from the chassis. NOTE: When re-installing the panels, be sure that the screws engage the TOP panel.
6. Remove the ice deflectors, ice chutes and drain pans. Drain tube assemblies are packed with the drain pans as shown below.
7. Install gasketing on top of bin if required. Gasket material must be positioned so that it extends to the outside edge of the perimeter of the cuber chassis when the cuber is in place.
8. CAREFULLY place the cuber onto the gasketed bin, noting the alignment of the
mounting holes in the chassis if mounting means are provided on the bin. Follow the bin installation instructions for securing the cuber to the bin.
508 1069 01 New 5/19/03
- 3 -
9. Install the drain pans, ice chutes and ice deflectors. Route the Lower Evaporator Drain tube through the rear of the bin, the Upper Evaporator drain tube through the Upper Evaporator Drain opening, and clamp the tubing to the drain pan nipples.
10. Electrical, water and drain locations are shown on the following drawing: All dimensions are in inches. See INSTALLER NOTE at the end of this section.
WARNING:
RISK OF CONTAMINATION OF ICE IN THE BIN. Provide separate, unconnected, drains for the ice maker and the bin. Consult local codes for suitable connections to the building drains.
11. Purge the potable water supply line.
12. Remove the water plate shipping strap(s).
13. Route the bin thermostat capillary tube through the grommet in the compressor compartment wall and under the ice chute. See the diagram and notes following for location and securing of the capillary tube. The capillary tube clips will be toward the drain pan when properly installed.
508 1069 01 New 5/19/03
- 4 -
Loading...
+ 8 hidden pages