Kohler TRESHAM K-45980T-L, TRESHAM K-45980T-R Installation Instructions Manual

-1-
1044886-T01-A
BEFORE YOU BEGINBEFORE YOU BEGIN
ã ã
, 2012
Copyright Kohler China Ltd., 2012
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
E1
1.5mg/L
ORDERING INFORMATION
This installation covers the following products in the TRESHAM range:
Tresham Vanity 600mm (Left Open)................K-45980T -L
Tresham Vanity 600mm (Right Open).............K-45980T -R
600mm ( )........................K-45980T -L
600mm ( ) .......................K-45980T -R
SAFETY: WARNINGS
Kohler products are precision-engineered and should give continued superior and safe performance, provided:
1. They are installed, commissioned, operated and maintained in accordance with the recommendations given in this Manual.
2. Periodic attention is given, as necessary, to maintain the product in good functional order. Recommended guidelines are given in the section.
Carefully inspect the new fixture for any signs of damage.
When installing Kohler Products, manufacturers guidelines for power tool safety should be followed.
MAINTENANCE
1.
2.
()
158 200436
INSTALLATION INSTRUCTIONS
WASHBASIN CABINET
K-45980T-L/K-45980T-R
TRESHAM
1188934-T01-B
-2-
ROUGHING-IN
UNIT : mm
TOOLS AND MATERIALS
·
·
·
·
·
·
Pencil Measuring Tape Level Safety Glasses Drill Screwdrivers
·
·
·
·
·
·
Kohler reserves the right to change marked dimensions without prior notice.
Reference Value
57
141
489
57
521
603
470
603
80
100
80
57
57
334
334
826
464
K-45980T-L and K-45980T-R are of the same dimensions and only differ in the way the door opens. K-45980T-L K-45980T-R
1188934-T01-B
INSTALLATION
1. Install Supplies
Install the services. Hot (H) and Cold (C) inlets must be connected to the correct inlet pipes. Install the drain in accordance with the manufacturer s instructions. We suggest using P-trap drain. Connect P-trap pipe with washbasin drain.
Make sure a watertight seal exists on all
washbasin drain connections.
Provide access to the plumbing
connections for future plumbing maintenance.
The hot and cold water supplies must be installed with
isolating valves.
CAUTION!
CAUTION!
NOTE:
1.
(H) (C)
P
-3-
2. Wall Preparation
·
·
Install the water supply and drain lines according to the roughing-in information provided with your lavatory. The water supply nipples must extend at least 76mm beyond the finished wall material. Complete the finished wall. Make sure the finished wall is straight and plumb, and the floor is flat and perpendicular to the finished wall.
Do not install any moldings that may inhibit the
vanity from being plumb against the finished wall.
IMPORTANT!
2.
·
·
76mm
1188934-T01-B
Loading...
+ 4 hidden pages