Kohler K-T16119, REVIVAL K-T16122, K-T16124, K-T16119M, K-T16122M Installation Instructions Manual

...
REVIVAL
DECK-/BATH-MOUNT BATH FAUCET
1. BEFORE YOU BEGIN
HOW TO USE THESE INSTRUCTIONS
MODEL NUMBERS
K-T161 19 K-T16122 K-T16124
PRODUCT REQUIREMENTS
Deep rough-in kit #73444 allows an additional 1/2”
(1.3cm) of tile thickness.
Plaster guard diameters are approximately 1-5/8”
(4.1cm) for the valve and 7/8” (2.2cm) for the spout.
Installer-supplied copper tubing to be: 5/8” O.D.
(1/2” nominal).
Install water hammer arrestors in supply lines near
the valves.
TOOLS AND MA TERIALS REQUIRED
Open end/adjustable wrenches Adjustable arc pliers 1/2” Nom. (5.8” O.D.) tubing Tubing Cutter Hole cutting equipment Soldering equipment and supplies Phillips screwdriver
All information in these instructions is based on the latest product information available at the time of publication. Kohler Co. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice.
K-T16119M K-T16122M K-T16124M
INST ALLER INFORMA TION
These instructions cover two methods of
installation: installation on finished deck or bath rim, and installation on rough (unfinished) deck (to be covered later with tile or other finish material).
Leave protective sleeve on spout supply tube until
spout installation. This is an O-Ring sealing surface which may be damaged when unprotected.
Finish deck material must fit closely to the
diameters of the plaster guards, especially the spout plaster guard.
Provide an access panel to valves from underside
of deck.
ROUGHING-IN DIMENSIONS – SPOUT AND HANDLES
1-5/8” (4.1cm)
6-1/4” (15.9cm) (scroll knob) 6” (15.2cm) (traditional knob)
3” (7.6cm)
4-1/4” (10.8cm)
2-1/2” (6.4cm)
1-1/4” (3.2cm)
2-1/2” (6.4cm) D.
DOME
Fig. #1
1-3/4” (4.4cm)
4-3/4” (12.1cm)
113341-2-BB
9-5/8” (24.4cm)
2-5/8” (6.7cm) D.
DECK-MOUNT
1” (2.5cm)
4-1/4” (10.8cm)
3” (7.6cm)
2-1/2” (6.4cm) D.
LEVER
1-1/8” (2.9cm)
4-3/8” (11.1cm)
6-5/8” (16.8cm)
2-5/8” (6.7cm) D.
BATH-MOUNT
1” (2.5cm)
1” (2.5cm)
3” (7.6cm)
2-1/2” (6.4cm) D.
TRADITIONAL
1-5/8” (4.1cm)
6-1/4” (15.9cm) (scroll knob) 6” (15.2cm) (traditional knob)
3” (7.6cm)
2000 Kohler Co.
ROUGHING-IN DIMENSIONS – CONTINUED
X = Distance from centerline of spout inlet to front of spout base plus 1/2” (1.3cm).
* Dimension allows for ±1/4” (6mm) handle adjustment during handle trim installation.
1-5/16” D.
1-1/8” D.
5/8” I.D. (1/2” NOM.)
Y
1-13/16” (4.6cm)
7/8” D.
5/8” O.D. TUBING (1/2” NOM.)
4-5/8” (1 1.7cm)
1/2” (1.3cm) MIN. - 2-1/8” (5.4cm) MAX. DECK THICKNESS
5-5/8” (14.3cm)
FINISHED DECK- AND BATH-MOUNT ROUGHING-IN
Y
1-5/16” D.
Diameter of hole in deck for spout = 1-1/8” (2.9cm) Max. Diameter of hole in deck for valve = 1-1/2” (3.8cm) Max. Thin deck/bath rim installations require additional support
under deck/bath rim. Use 1/2” exterior grade plywood. For installations on a rough (unfinished) deck to be
covered later with tile, the tile thickness must not exceed 1-1/4” (3.2cm).
X
1-1/4” (3.2cm) MAX. TILE THICKNESS
*1-1/4” (3.2cm)
1/8” (3mm) MIN. - 2-1/8” (5.4cm) MAX. BATH RIM THICKNESS
X
X
1-1/8” D.
5/8” I.D. (1/2” NOM.)
7/8” D.
5/8” O.D. TUBING (1/2” NOM.)
ROUGH DECK PLUS FINISHED DECK (TILE) ROUGHING-IN
2. INSTALLATION
PREPARATION
For installations with 8” (20.3cm) centers using copper tubing (1/2” nominal, 5/8” O.D.), cut tubing to the lengths as follows:
2-pieces: 2-7/8” (7.3cm) long 1-piece: 2-3/8” (6cm) long (for finished deck or bath rim
installation only).
INST ALL SPOUT SUPPL Y TUBE
Slide brass washer from bottom of spout supply tube over threads until washer reaches supply tube shoulder.
Insert spout supply tube through mounting hole from top of deck/bath rim. Ensure flat portion of washer faces forward. Spout supply tube will be suspended by washer.
Slide plate (oriented with tabs toward deck) and washer onto spout supply tube from bottom and thread on mounting nut. Tighten nut.
Secure plate to deck or wooden support with two wood screws.
NOTE: Leave protective sleeve on spout supply tube un­til spout installation.
1/2” (1.3cm) MIN. - 2-1/8” (5.4cm) MAX. ROUGH DECK THICKNESS
Fig. #2
For non-8” (20.3cm) center installations, adjust tubing lengths as necessary.
Spout Supply Tube
Supply Tube Shoulder
Brass Washer
Wood Screw
Nut
Wood Screw
Washer
Fig. #3
Plate
113341-2-
BB
2
Kohler Co., Kohler, WI
INST ALL V AL VE BODIES
Thread one mounting nut, flange side up, followed by one fiber washer and one rubber washer onto each valve body.
Insert the 2-7/8” (7.3cm) long copper tubes between the valve bodies and 1/2” tee. For a finished deck or bath rim installation only, insert the 2-3/8” (6cm) long copper tube into top of tee.
Do not solder connections yet.
2-3/8” (6cm) Copper Tube (Finished Deck Or Bath Rim Installation Only)
Rubber Washer
Fiber Washer
Mounting Nut
Valve Body
1/2” Tee
2-7/8” (7.3cm) Copper Tubes
Fig. #4
NOTE: Orient valve body marked “COLD” so it is on the
right when facing the front of the faucet. Insert valve bodies through mounting holes from bottom
of deck/bath rim. For finished deck or bath rim installation, mate copper tube from tee with spout supply tube. Hold in place.
Place a collar with flange side up on each valve body and thread down to at least 1” (2.5cm) from top thread on valve body .
Install threaded sleeve on each valve body until sleeve bottoms on valve body.
Back up collar until it contacts sleeve. NOTE: For finished deck/bath rim installations, perform
procedures of this frame. For rough (unfinished) deck installations, omit procedures in this frame and perform procedures in frames Fig. #7 thru Fig. #11.
Tighten mounting nuts on each valve body underneath deck/bath rim.
Solder copper tubes to valve bodies, tee and spout supply tube.
Solder hot and cold water tubes to valve body inlets. Ensure cold supply is on right hand side.
Proceed to Section 3.
Hot Supply
Threaded Sleeve
1” (2.5cm)
Collar
Fig. #5
Cold Supply
Solder
Solder
Solder
Fig. #6
Kohler Co., Kohler, WI
3
113341-2-
BB
Loading...
+ 5 hidden pages