Kohler PATIO URINAL Installation Instructions Manual

PATIO
INSTALLATION INSTRUCTIONS
VITREOUS CHINA URINAL
-1-
1063245-T01-B
K18645A
A. How to use these instructions
• All information in these instructions is based upon the latest product information available at the time of publication. Kohler Co. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice.
• These instructions contain important care, cleaning, and warranty information - Please leave instructions for the consumer.
B. Notes
• Observe all local plumbing and building codes.
• Shut off the water supply.
• Carefully inspect the new fixture for any sign of damage.
• Be very careful while hand ling vitreous china products.
C. Required tools and materials
• Drill
• Open end/adjustable wrenches
• Measure tape
• Thread sealant tape
• Basin Wrench
• Screwdriver
• Sealant
• Touchless Urinal Sensor or other assy. for flow controlling (Recommended Kohler Touch-less urinal Sensor K-8787T-C02/K-8791T-C02).
• Recommend the no less than 9mm stainless steel twist pipe as inlet.
A. Install Urinal Sensor
Recommended Urinal Sensor Kohler Urinal Sensor 8787T-C02/8791T-C02
B. Install Outlet Connection
• Ascertain the position for outlet connection according to rough-in.
• Apply sealant on outlet pipe. and connect the outlet connection with outlet pipe. Insert gasket as shown in Fig.2.
• Fix outlet connection on the installing wall. Note: Fig.2 may be different for different outlet connection.
Unit: mm
ROUGHING-IN
335
180
35
265 5
140
80
600
50 ext
145
70
642
300
95
370
G1/2
INSTALLATION
Fig.1
-2-
1063245-T01-B
2~10mm
100
30
Fig.2
Fig.3
Fig.4
C. Install hook
D. Install inlet pipe
Insert gasket and nut into the uriral as shown. Connect the inlet connection with inlet pipe.
(See Fig.3) Drill 2 mounting holes on the wall and install hook. Fix hook on the wall by tightening screws.
265
08
210
600
081
310
X +
35
001
Loading...
+ 2 hidden pages