Kohler KOH19853 Specifications

Page 1
5.5' VibrAcoustic® Bath with Bask™ Heated Surface
Features
VibrAcoustic technology emits sound waves and offers a surround sound experience.
Six transducers and a control amplifier with 25’ (7.6 m) of wiring.
User-friendly high-resolution color touch screen in polished chrome.
Bask™ heated surface with three temperature settings.
Molded lumbar support and armrests for comfort
Textured bottom surface.
Reversible drain.
Material
Acrylic
Installation
Drop-in installation.
Codes/Standards
CSA B45.5/IAPMO Z124 ASTM E162 ASTM E662 UL 1795 CSA C22.2 No. 218.2
Mariposa
K-1224-VBW
®
KOHLER® One-Year Limited Warranty
See website for detailed warranty information.
Available Color/Finishes
Color tiles intended for reference only.
DescriptionCodeColor
White0
Biscuit96
Almond47
DuneNY
Ice Grey95
SandbarG9
USA/Canada: 1-800-4KOHLER (1-800-456-4537)
www.kohler.com
2-18-2015 01:47
Page 2
1-1/2"
Mariposa
®
5.5' VibrAcoustic® Bath with Bask™ Heated Surface
K-1224-VBW
Required Electrical Service
One dedicated circuit required, protected with Class A Ground-Fault Circuit-Interrupter (GFCI) or Residual Current Device (RCD).
120 V, 15 A, 50/60 HzAmplifier, Heater:
Technical Information
All product dimensions are nominal.
Drop-inInstallation: ReversibleDrain location: 48" x 24" (1219 mm x 610 mm)Basin area, bottom: 59" x 30" (1499 mm x 762 mm)Basin area, top: 81 lbs (36.7 kg)Weight:
40.2 lbs/ft² (196.3 kg/m²)Minimum floor load: 14" (356 mm)Water depth: 67 gal (253.6 L)Water capacity: Drop-in, 64" x 34" (1626 mm x 864 mm)Cutout:
Electrical rating:
Amplifier: 120 V, 50/60 Hz, 15 W Heater: 120 V, 1.1 A, 60 Hz, 65 W
Notes
Install this product according to the installation guide. Ensure that the interface, amplifier, and transducers are functional before completing the installation.
Control amplifier fits 16" (406 mm) center studs. 25’ (7.6 m) cables are included.
Locate the bath within 24" (610 mm) of a GFCI-protected 120 V, 15 A grounded electrical outlet. A second grounded outlet within the wall framing must be within 24" (610 mm) of the planned control amplifier. One electrical service may be used for the entire bath and related electrical components.
If installing a rim-mount faucet, make sure there is no interference with drain overflow before drilling any holes. Consult local and national codes for minimum air gap requirements if installing a spout on the faucet deck.
The apron must be installed before the finished floor and wall materials are installed.
USA/Canada: 1-800-4KOHLER (1-800-456-4537)
www.kohler.com
2-18-2015 01:47
Loading...