Knightsbridge SKR008, SKR009A Installation Manual

INSTALLATION & MAINTENANCE MANUAL
SKR008 / SKR009A
230V
50Hz
IP
20
11
1
GENERAL INSTRUCTIONS
SKR008 & SKR009
Remove screws
SKR008 & SKR009
Fig 1
Remove screws
Screw mounting locations
Cable entry gland
SAFETY
• Installation of this product should only be carried out by a qualified electrician or competent person to the latest Building and current IEE Wiring Regulations (BS7671)
• Please isolate mains prior to installation/maintenance
• Check the total load on the circuit (including when this product is fitted) does not exceed the rating of the circuit cable, fuse or circuit breaker
• This product is Class I and must be earthed
• For indoor use only
• Do not subject product to insulation resistance testing
INSTALLATION
• Provide power to the required point of installation
• Remove the two screws on the front plate to remove the plate (see Fig 1)
Fig 1
• Mark the location of the fixing holes and drill the holes ensuring not to infringe with any joists, gas/water pipes or electrical cables (see Fig 2)
Fig 2
2
Loading...
+ 2 hidden pages