These instructions should be read carefully and retained after installation by the end user for
future reference and maintenance.
These instructions should be used to aid installation of the following product:
EMTWINLPC
SAFETY
• This product must be installed in accordance with the latest edition of the IEE Wiring Regulations (BS7671)
and current Building Regulations. If in any doubt, consult a qualified electrician
• Please isolate mains prior to installation or maintenance
• Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of the
circuit cable, fuse or circuit breaker
• Please note the IP (Ingress Protection) rating of this product when deciding the location for installation
• This product is for indoor use only
• This product is Class I and must be earthed
• This product is IP20
INSTALLATION
• Provide power to the required point of installation
• With the aid of a flat-head screwdriver remove the front cover to access the terminal block (see Fig. 1)
Page 3
INSTALLATION & MAINTENANCE MANUAL
Insert flat head
Fig. 1
screwdriver
• Using the baseplate as a template, mark the location for, and drill the fixing holes ensuring not to infringe
with any gas/water pipes or electrical cables
• Feed the mains cable into the luminaire and secure the baseplate to the surface
• Connect the luminaire to the mains supply ensuring the correct polarity is observed (see Fig. 2): L - Live
(brown), E - Earth (green/yellow), N - Neutral (blue). The earth terminal is non-functional and only provided
for convenience
Fig. 2
Page 4
• Connect the battery to the battery connector on the PCB (see Fig. 2)
• Replace the front cover
• Switch on and check for correct operation, ensuring the green indicator LED is illuminated
• We recommend, on commissioning the installation, a minimum charge period of 24 hours before carrying
out an emergency duration test
• The test button can be used to simulate a power failure, to test the lamp and battery operation. This can be
used to carry out monthly functional testing, as long as the battery holds at least a small charge
WARNING
This product must be disconnected from the circuit if subjected to any high voltage or insulation resistance
testing. Irreparable damage will occur if this instruction is not followed.
GENERAL
The light source of this luminaire is not replaceable; when the light source reaches its end of life the whole
luminaire should be replaced.
Clean with a soft dry cloth only, do not use aggressive cleaning products or solvents which may damage the
product.
Installing in areas where the temperature consistently drops below 0°C may shorten the battery life.
This product is for non-maintained emergency use only.
This product is non-dimmable.
This product should be recycled in the correct manner when it reaches the end of its life. Check local authorities
for where facilities exist.
The batteries in this luminaire are Lithium Ion and must be disposed of correctly. Please contact the local
authorities for the disposal of this toxic waste.
Page 5
WARRANTY
This product has a warranty of 3 years from date of purchase. Failure to install this product in accordance with
the current edition of the IEE Wiring Regulations (BS7671), improper use, or removal of the batch code will
invalidate the warranty. If this product should fail within its warranty period, it should be returned to the place
of purchase for a free of charge replacement. ML Accessories does not accept responsibility for any installation
costs associated with the replacement product. Your statutory rights are not affected. ML Accessories reserve
the right to alter product specification without prior notice.
Page 6
TESTING FOR EMERGENCY LUMINAIRES
Recommended routine test procedure in accordance with BS5266
• Daily check – check LED charge indicator is illuminated
• Monthly functional test - simulate a mains supply failure for approx. 30 seconds by operation of key switch
or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator is
illuminated
• Annual 3-hour duration test - simulate a mains supply failure for 3-hour continuous test by operation of key
switch or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator
is illuminated
• If the luminaire fails any of the above tests, please contact a qualified electrician. See below for test record
sheet
Page 7
SUPPLIED BY:
ML ACCESSORIES LTD, UNIT E CHILTERN PARK,
BOSCOMBE ROAD, DUNSTABLE LU5 4LT,
(UK) MANUFACTURER
WWW.MLACCESSORIES.CO.UK
(EU) AUTHORISED REPRESENTATIVE
SLV LIGHTING GROUP,
DAIMLERSTRASSE 21-23,
52531 ÜBACH-PALENBERG, GERMANY
EMAIL: EPREL@GROUP.SLV.COM
MADE IN CHINA
0~45°C
TA
54
DCJUN23_V1
Page 8
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.