Knightsbridge EMPOWER3 Installation Instructions

Page 1
INSTALLATION & MAINTENANCE MANUAL
EMPOWER3
Page 2
GENERAL INSTRUCTIONS
These instructions should be read carefully and retained after installation by the end user for future reference and maintenance. These instructions should be used to aid installation of the following product: EMPOWER3
SAFETY
• Please isolate mains prior to installation or maintenance
• Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of the circuit cable, fuse or circuit breaker
• Please note the IP (Ingress Protection) rating of this luminaire when deciding the location for installation
• Allow 50mm above and around the fitting for air dissipation (do not cover the fitting with insulation)
• This product is for indoor use only
• This product is Class II double insulated
• This product is IP20 rated
Page 3
INSTALLATION
• Provide power to the required point of installation
• Cut a suitable hole in the mounting surface as per the cut-out details (see Fig. 1) ensuring not to infringe with any joists, gas/water pipes or electrical cables
Fig. 1
• Connect the luminaire to the mains supply via a suitable junction box ensuring that correct polarity is observed: Live (brown) and Neutral (blue) (see Fig. 2)
Page 4
Fig. 2
• Connect the battery to the inverter via the plug and socket provided, ensuring correct polarity is observed
• Connect the downlight to the inverter via the plug and socket provided
• Change the bezel, if required, by unscrewing from the downlight and replacing with the required bezel
• Place the inverter and battery into the ceiling via the cut-out
• Lift both spring clips on the sides of the fitting and push into the ceiling
• Switch on and check for correct operation, ensuring the green indicator LED is illuminated
• We recommend, on commissioning the installation, a minimum charge period of 24 hours before carrying out an emergency duration test
Page 5
WARNING
This luminaire must be disconnected from the circuit if subjected to any high voltage or insulation resistance testing. Irreparable damage will occur if this instruction is not followed.
GENERAL
The LED lamps fitted in this product are non-replaceable. The product should be recycled in the correct manner when it reaches the end of its life. Check local authorities for where facilities exist. The batteries in this luminaire are Lithium Ion and must be disposed of correctly. Please contact the local authorities for the disposal of this toxic waste. Clean with a soft dry cloth only, do not use aggressive cleaning products or solvents which may damage the product. This product is non-dimmable.
WARRANTY
This product has a warranty of 3 years (excluding battery) from date of purchase. Failure to install this product in accordance with the current edition of the IEE Wiring Regulations (BS7671), improper use, or removal of the batch code will invalidate the warranty. If this product should fail within its warranty period, it should be returned to the place of purchase for a free of charge replacement. ML Accessories does not accept responsibility for any installation costs associated with the replacement product. Your statutory rights are not affected. ML Accessories reserve the right to alter product specification without prior notice.
Page 6
TESTING FOR EMERGENCY LUMINAIRES
Recommended routine test procedure in accordance with BS5266
• Daily check – check LED charge indicator is illuminated
• Monthly functional test - simulate a mains supply failure for approx. 30 seconds by operation of key switch or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator is illuminated
• Annual 3-hour duration test - simulate a mains supply failure for 3-hour continuous test by operation of key switch or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator is illuminated
• If the luminaire fails any of the above tests, please contact a qualified electrician. See below/overleaf for test record sheet
Page 7
INITIAL COMMISSIONING
3 HOUR TEST
MONTH TEST
1 FUNCTIONAL
2 FUNCTIONAL
3 FUNCTIONAL
4 FUNCTIONAL
5 FUNCTIONAL
6 FUNCTIONAL
7 FUNCTIONAL
8 FUNCTIONAL
9 FUNCTIONAL
10 FUNCTIONAL
11 FUNCTIONAL
12 3 HOUR
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
SIGNED DATE SIGNED DATE SIGNED DATE SIGNED DATE SIGNED DATE
SIGNED DATE
Installed by: Installation date:
Contact number:
TEST RECORD SHEET
Page 8
INTERNATIONAL
INTERNATIONAL
CONTACT DETAILS
INTERNATIONAL
CONTACT DETAILS
CONTACT DETAILS
ML Accessories Limited LU5 4LT
www.mlaccessories.co.uk
54
5~
60°C
TA
AVSEP21_V2
Loading...