KLIK LEDpod 40 Square Installation Instructions Manual

Page 1
Rotate retaining clasps in as shown.
Apply pressure as shown to deform clasp into place in a circular motion.
LEDPOD 40SQ Installation Instructions
Patent pending
90°
1
2
3
4
30
26.9
O
24.8
O
25 ±0.2
O
Ensure pre-drilled holes are deburred and excess swarf is removed.
90°
26.9
O
24.8
O
Rotate retaining clasps in as shown.
Apply pressure as shown to deform clasp into place in a circular motion.
LEDPOD 40SQ Installation Instructions
Patent pending
90°
60mm
NEGATIVE [ - ]: Black
POSITIVE [ + ]: Red
1
2
3
4
30
26.9
O
24.8
O
25 ±0.2
O
Ensure pre-drilled holes are deburred and excess swarf is removed.
Apply pressure as shown to deform clasp into place in a circular motion.
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
Patent pending
90°
Install Scotchlok connectors to the 18-16 AWG (0.75-1.5) red and black wires. Connect the corresponding colour wires of the Driver to the Scotchloks and assure the clamp is secured. Max wire insulation 3.5mm OD
CAREFULLY feed the Scotchloks to the left of the clasp and the driver to the right with the driver connector hanging out.
Proceed to connect the LEDPOD
NEGATIVE [ - ]: Black
POSITIVE [ + ]: Red
3
4
6
7
30
26.9
O
24.8
O
25 ±0.2
O
Apply pressure as shown to deform clasp into place in a circular motion.
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
Patent pending
90°
Install Scotchlok connectors to the 18-16 AWG (0.75-1.5) red and black
CAREFULLY feed the Scotchloks to
NEGATIVE [ - ]: Black
POSITIVE [ + ]: Red
3
4
6
30
26.9
O
24.8
O
25 ±0.2
O
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
90°
Push LEDPOD in until it snaps into place and the outer surface is flush with the outer surface of the tube.
Prod the rim of the clear silicone IP Seal to provide a tighter fit.
CAREFULLY feed the Scotchloks to the left of the clasp and the driver to the right with the driver connector hanging out.
Proceed to connect the LEDPOD
The notch indicates the direction of the light, Asymmetrical LEDPods
Light direction
4
7
8
30
26.9
O
24.8
O
Patent pending
30
26.9
O
24.8
O
25 ±0.2
O
Feed through appropriate wires
(0.75-1.5mm²).
2
Make sure drilled holes are deburred and excess swarf is removed from railing.
25 ±0.2
O
O
26
24.7
O
30
60mm
Thru.
wire
LEDPOD 40 Installation Instructions
R
Pull a loop of wire through hole. Rotate retaining clasps in as shown. Avoid
tangling or severing through wire.
3 4 5
Apply pressure as shown to deform clasp into place in a circular motion. Avoid damaging the surface of tube
Feed through appropriate wires
(0.75-1.5mm²).
2
Make sure drilled holes are deburred and excess swarf is removed from railing.
1
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
90°
26.9
O
24.8
O
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
90°
4
30
26.9
O
24.8
O
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
90°
CAREFULLY feed the Scotchloks to the left of the clasp and the driver to the right with the driver connector hanging out.
Proceed to connect the LEDPOD
4
7
30
26.9
O
24.8
O
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
90°
CAREFULLY feed the Scotchloks to the left of the clasp and the driver to
7
26.9
O
24.8
O
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
90°
Push LEDPOD in until it snaps into place and the outer surface is flush with the outer
CAREFULLY feed the Scotchloks to the left of the clasp and the driver to the right with the driver connector hanging out.
Proceed to connect the LEDPOD
The notch indicates the direction of the light, Asymmetrical LEDPods
Light direction
4
7
8
30
26.9
O
24.8
O
Feed through appropriate wires
(0.75-1.5mm²).
2
Make sure drilled holes are deburred and excess swarf
1
Rotate retaining clasps in as shown.
Apply pressure as shown to deform clasp into place in a circular motion.
Fit clasp into place until the clamping ends are equally centred over the hole.
LEDPOD 40SQ Installation Instructions
Patent pending
90°
1
2
3
4
30
26.9
O
24.8
O
25 ±0.2
O
Ensure pre-drilled holes are deburred and excess swarf is removed.
90°
4
30
26.9
O
24.8
O
Feed wires through tube. Be careful not to sever wires whilst feed past
Rotate retaining clasps in as shown.
Apply pressure as shown to deform clasp into place in a circular motion.
Fit clasp into place until the clamping ends are equally centred over the hole. Use tool to centre clasp until equally pressure can be felt and inspect by eye.
LEDPOD 40SQ Installation Instructions
Patent pending
90°
60mm
Install Scotchlok connectors to the 18-16 AWG (0.75-1.5) red and black
CAREFULLY feed the Scotchloks to
NEGATIVE [ - ]: Black
POSITIVE [ + ]: Red
1
2
3
4
5
6
30
26.9
O
24.8
O
25 ±0.2
O
Ensure pre-drilled holes are deburred and excess swarf is removed.
30
26.9
O
24.8
O
25 ±0.2
O
NEGATIVE [ - ]: Black
POSITIVE [ + ]: Red
Thru.
wire
R
tangling or severing through wire.
Apply pressure as shown to deform clasp into place in a circular motion. Avoid damaging the surface of tube and tangling or severing through wire.
Install Scotchlok connectors to the (0.75-1.5sq) red and black wires. Connect the corresponding colour wires of the Driver to the Scotchloks and assure the clamp is secured.
CAREFULLY feed the Scotchloks to the left of the clasp and the driver to the right with the driver connector hanging out. Ensure wires are clear from where the LEDPOD is to fit.
Proceed to connect the LEDPOD
8
Feed through appropriate wires
(0.75-1.5mm²).
2
Make sure drilled holes are deburred and excess swarf is removed from railing.
1
LEDpod 40 Square Installation Instructions
LEDPOD Removal Steps
1 2 3
kliksystems.com.au · info@kliksystems.com.au · quotations@kliksystems.com.au · t: +612 9851 3300 32865-B
Insert removal tool into the 2mm holes in the LEDPOD
With firm pressure, rotate the LEDPod 90°
Carefully peel back the IP silicone seal one side at a time.
Be sure to re-attach the silicone seal ready for reinsertion.
Carefully remove the LEDPOD from the clasp, ensuring not to damage or disconnect wires in the process.
9
Page 2
60mm
Match colours of wires as shown in the images below.
Insert wires into connectors as far as possible and push down blue tabs to splice the wires.
IMPORTANT :
ONLY
connect 24V DC supply input to the Blue and Red Soft starter
DO NOT connect power to any other wires.
Blue IN Negative [-]
Red IN Positive [+]
Black OUT Negative [-]
Red OUT Positive [+]
2
3
5
4
24V DC IN Black Negative [-]
24V DC IN Red Positive [+]
LEDPOD OUT Black Negative [-]
LEDPOD OUT Red Positive [+]
Cut wires at the centre of the loop.
24VDC Supply INPUT
To LEDPods OUTPUT
Carefully feed one connector at a time through the LEDPOD holes.
Carefully pull out a loop of wire at the first LEDPOD location.
Feed power wires through tubing
Soft starter complete with pre-fitted connectors
1
To 24V DC Supply
INPUT
To LEDPODs
OUTPUT
Move components down to make room for retaining clasp insertion.
Refer to page 1 for LEDPOD installation instructions.
6
R
LEDPOD Soft Start Relay Installation Instructions
(Use for 350mA drivers only)
kliksystems.com.au · info@kliksystems.com.au · quotations@kliksystems.com.au · t: +612 9851 3300 32865-B
Loading...