CHANGING THE BIN DOOR AND LOWER PANEL
I’
The storage bin door and lower panel are designed to
accept an optional decorative wood panel of your
choice.
The wood panel should be no more than V4 inch (6 mm)
thick. Cut it to the same size as the production metal
panel. See Figure 1.
To change the bin door panel:
1. Open the bin door.
2. Remove the two screws on top of the door which
hold the handle.
3. Remove the handle.
4. Slide the metal panels out.
5. Break off the ribs on the door insulation to allow
for the wood thickness. See Figure 2.
6. Slide the wood panel into the door frame.
7. Replace handle and screws.
To change the lower panel:
1. Remove the two screws at the bottom that hold the
lower panel assembly to the ice maker.
2. Remove the two screws on the top of the pane!
assembly.
3. Slide the metal panels and spacers out.
DOOR
BIN
LOWER
PANEL
WOOD
PANEL
DIMENSIONS
- 17-w
#
FIGURE 1
REMOVE ALL DOOR INSULATION
RIBS TO ACCEPT WOOD PANEL
THICKNESS
FIGURE 2
&l/4”
4. Slide the wood panel into the door frame.
5. Replace the top of the panel assembly.
NOTE: Make sure the galvanized panel is replaced in
back of the panel assembly.
THERMOSTAT CALIBRATIONS
If ice maker is installed above two thousand feet of
altitude, the bin and evaporator thermostats must
be adjusted to a warmer setting. Disconnect
electricity,
directions for turning the altitude adjustment
screw as shown in the label on each thermostat.
remove thermostat and follow the
SHIPBOARD OPERATION
When this ice cube maker is installed aboard a ship,
it will be necessary to purchase and install a water
deflector. This deflector hangs between the lower
edge of the evaporator and the cutter grid. It keeps
the water flowing over the evaporator from spilling
into the storage bin area. Order the necessary parts
from your local ice maker dealer.
2
GENERAL INFORMATION
l
UNPACK
2 Either a
Ihe water lo an existing drain.
3 An electrical branch circuit
with
l
LOCATE UNIT
gravity drain system or a sump pump
a 15 Amp delayed action fuse or circuit breaker.
to lift
of 115 Volt, 60 Hz, 1 phase,
REMOVE
INTERIOR
PACKING
OPEN BOTTOM FLAPS
FIGURE 3
1
Lay carton on rear face and break open bottom
flaps
2 Set carton upright with all four flaps outward.
See Figure 3.
3
Lift carton u
4 Remove all tape and packaging material from the
outside and inside of the cabinet. See Figure 4.
5R emove the front grill: take out the screws secur-
ing the grill at the bottom and Ilft It free of cabinet
6
Turn the fan by
freely.
7L
oosen
pan
to “thumb tight.”
p
and off of machine.
hand to make certain It moves
thumb screws holding cutter grid and water
FIGURE 4
THIS UNIT MUST BE
INSTALLED IN AN
AREA PROTECTED FROM
THE ELEMENTS, SUCH
AS WIND, RAIN, WATER
SPRAY OR DRIP.
1
Place unit so the front side WIII be .completely
unobstructed. lo provide proper air flow
2 Area should be well ventilated with temperature
above 55-F and below 110°F. Best results are
obtained between 70°F and 90°F.
3 ProvIsIon for electrlclty, water and drain connec
tlons should be determlned
4 The unit may be closed tn on the top and three
sides. but the front
clrculatlon and proper operation
should be such that the cabinet can be moved
forward for servlclng. If necessary
MUST BE
I-J
goo FlYlI
( BEST
\ RANGE
7oo F
CR 66A
unobstructed for air
Installation
. UTILITIES
ELECTRICITY
OBSERVE LOCAL CODES
Each installation is unique but will require:
1
A cold water inlet of 1/4” OD soft copper tubing and
a shut-off valve.
DRAIN
l
LEVEL UNIT
1
After placing unit In posItIon. check to make
certain the unit
back.
2 Accurate leveling
3 Unit should be shimmed so that it
level. The shims should
material such as masonite.
4
Compliance with National Sanitation Foundation stan-
dards require that this type of product be sealed to the
floor at the bottom rail in order to prevent contamination
from spills or the entrance of vermin. Therefore, we
recommend that when installing this product you seal it
to the floor in accordance with those standards. A
silicone-type sealer is recommended.
IS
level side to side and front to
IS
essential for proper
IS
be of hard permanent type
operation.
solid as well as
3